GB/T 17388-2010 English PDFUS$369.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 17388-2010: Electric submersible pump installations Status: Valid GB/T 17388: Historical versions
Basic dataStandard ID: GB/T 17388-2010 (GB/T17388-2010)Description (Translated English): Electric submersible pump installations Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: E92 Classification of International Standard: 75.180.10 Word Count Estimation: 16,177 Date of Issue: 2010-11-10 Date of Implementation: 2011-03-01 Older Standard (superseded by this standard): GB/T 17388-1998 Quoted Standard: GB/T 17387; GB/T 17390; GB/T 18050; GB/T 18051; SY/T 6598; SY/T 6599; ASTM D887 Adopted Standard: API RP 11S3-1999, MOD Regulation (derived from): National Standard Approval Announcement 2010 No.8 (Total No.163) Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the transport of conventional electric submersible pump device, handling, storage, site installation, start, played well, scene analysis and evaluation from the wells after. This standard applies to the installation and replacement of conventional electric submersible pump device for all major components (see Figure 1), especially for oil, gas production in the submersible pump unit and tubing installation. This standard does not involve the selection and application of electric submersible pump device. Just to ensure the good functioning of electric submersible pump, not the same as the installation program can accept. However, all the installation procedures are required to have good engineering experience, sound judgment and proper maintenance. GB/T 17388-2010: Electric submersible pump installations---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Electric submersible pump installations ICS 75.180.10 E92 National Standards of People's Republic of China Replacing GB/T 17388-1998 Installed submersible pump apparatus Issued on. 2010-11-10 2011-03-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsIntroduction Ⅲ 1 Scope 1 2 Normative references 1 Transport 3 submersible pump unit, handling and storage 1 Installation 4 conventional ground equipment 4 5 downhole electric submersible pump from wells and equipment 5 Installation 6 submersible pump apparatus downhole member 6 7 submersible pump unit start program 8 8 submersible pump from the wells of 8 Nine out of the submersible pump unit on-site analysis 9 10 Used submersible pump unit 10 Evaluation Appendix A (informative) Main Glossary 12ForewordThis revised standard adopts APIRP11S3.1999 "installation of electric submersible pump installations" (third edition) (English). This standard is based on APIRP11S3. redrafting of 1999, taking into account China's national conditions, the use APIRP11S3.1999, the present standard Made some changes, the main technical differences are as follows. --- In terms of the use of units, an increase of metric units, easy to use; --- APIRP11S3. foreign standards referenced in 1999, has been used instead of using the corresponding foreign standards for China's national standards; --- Removed APIRP11S3.1999 "special statement", "Introduction" and "Directory"; --- According to APIRP11S3.1999 were applied to the content of the normative references were deleted; --- Delete "ASTM" and "IEEE" standard abbreviations explained (the provisions of notes); --- 3.2.3 modify the terms of content; --- Modify the terms of the content of 10.7; --- Deleted 4.1 Overview of comments; --- Increase the informative appendix "The main Glossary" (see Appendix A). For ease of use, this standard APIRP11S3.1999 also made the following editorial changes. The term --- the "recommended practices" to "this standard"; --- According to Chinese customary for some formatting has been modified. This standard replaces GB/T 17388-1998 "installation of electric submersible pump unit" (MOD APIRP11S3.1992), and GB/T 17388-1998 compared to the main changes are as follows. --- Modify the content and electric submersible pump unit schematic composition; --- Remove the motor control cabinet diagrams and corresponding text notes; --- Deleted General; --- Modify the cable and the outer cable drum flange gap size requirements; --- Revised Notice forklift loading and unloading of the cable; --- Remove the submersible pump to reinstall; --- Increased from out of the submersible pump unit on-site analysis; --- Increased used submersible pump device evaluation. Appendix A of this standard is an informative annex. This standard by the national oil drilling equipment and tools for Standardization Technical Committee (SAC/TC96) and focal points. This standard was drafted. Daqing Oilfield Lishen Pump Co., Ltd., Shengli pump limited liability company, Dagang oil Tian Zhongcheng Machine Mechanical Manufacturing Co., Ltd. The main drafters of this standard. Shao real, Deng-hui, Shizhong Wu, Wang Wei, Wang Zhaolan, Wang Weijun, Ganyu Tao, Yan Jianwen. This standard replaces the standards previously issued as follows. --- GB/T 17388-1998. Installed submersible pump apparatus1 Scope1.1 standard defines the conventional electric submersible pump means the transport, handling, storage, on-site installation, startup, since well, live and play well after analysis Evaluation. This standard applies to the installation and replacement of conventional electric submersible pump means that all major components (see Figure 1), especially for oil, gas latent Oil pump means and pipeline installation. This standard does not involve the selection and application of electric submersible pump apparatus. 1.2 As long as the good submersible pump unit operation is not the same installation program can accept. However, all programs are required to install a Good engineering experience, sound judgment and proper maintenance.2 Normative referencesThe following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB/T 17387 operating submersible pump apparatus, maintenance and troubleshooting Preparation of GB/T 17390 submersible pump disassembly report GB/T 18050 submersible pump cables test methods GB/T 18051 submersible pump vibration test method SY/T 6598 submersible pump protection and use of recommended practice test SY/T 6599 centrifugal submersible pump test Recommended Practice ASTMD-887 application disk electrode measurements insulating liquid dielectric breakdown voltage of the standard method 3 submersible pump oil transportation means, handling and storage 3.1 Cable 3.1.1 Power Cable The recommended method 3.1.1.1 lifting cable tray are. selection of a suitable size steel cable tray is inserted as a center axis, use ropes or hanging After the chain is connected to the shaft, using a power winch and lifting frame lifting. Not allowed to use the lifting frame lifting sling hanging chain or cable tray to prevent hanging Chain or cable sling damage or cable tray. 3.1.1.2 cables and cable tray should take the necessary protective measures to prevent damage during storage, transport or installation of equipment. 3.1.1.3 cable reel should roll to avoid collision with other objects or cable drum and causing other damage. 3.1.1.4 cable tray from the rim and the outermost layer of the cable should not be less than 0.1m (4in). See Figure 2. 3.1.1.5 cable tray during transportation and handling, the centerline of cable tray should remain parallel to the ground. 3.1.1.6 When conventional methods of transport, on both sides of the cable drum flange should be stuck (block), while using the cable through the center of the disc fixed chains. 3.1.1.7 chain should not be fixed through the cable tray or in contact with the top of the cable. 3.1.1.8 with the forklift loading cable tray should be noted. a) fork arm must be long enough to support two flange cable tray; b) the width of the fork arm must be appropriate to ensure safe lifting cable tray; c) wishbones position should be fixed; d) when the lift truck from the cable drum flange end is inserted, and try to be the root of the truck; ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 17388-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 17388-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 17388-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 17388-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 17388-2010?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 17388-2010 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |