Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 13177-2008 English PDF

US$259.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 13177-2008: Preferred power supply for nuclear power plants
Status: Valid

GB/T 13177: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 13177-2008259 Add to Cart 3 days Preferred power supply for nuclear power plants Valid
GB/T 13177-2000519 Add to Cart 4 days Standard for preferred power supply for nuclear power plants Obsolete
GB/T 13177-1991RFQ ASK 3 days Standard for preferred power supply for nuclear power plants Obsolete

Similar standards

GB/T 13286   NB/T 20318   NB/T 20149   GB/T 13284   GB/T 13629   GB/T 12727   

Basic data

Standard ID: GB/T 13177-2008 (GB/T13177-2008)
Description (Translated English): Preferred power supply for nuclear power plants
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: F83
Classification of International Standard: 27.120.20
Word Count Estimation: 11,143
Date of Issue: 2008-09-19
Date of Implementation: 2009-08-01
Older Standard (superseded by this standard): GB/T 13177-2000
Quoted Standard: GB/T 12788; EJ/T 639
Adopted Standard: IEEE Std 765-2006, MOD
Regulation (derived from): Announcement of Newly Approved National Standards No. 16 of 2008 (No. 129 overall)
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the priority of nuclear power plants (PPS) and the first power supply and security level (1E -level) power systems, switching stations, power transmission systems, and alternative communication (AAC) interface design guidelines. This standard applies to nuclear power plants priority. Note: AAC power sources other than the PPS interface does not belong to the scope of this standard.

GB/T 13177-2008: Preferred power supply for nuclear power plants

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Preferred power supply for nuclear power plants ICS 27.120.20 F83 National Standards of People's Republic of China Replacing GB/T 13177-2000 Nuclear power plant priority Posted 2008-09-19 2009-08-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

The revised standard used by the US standard IEEEStd765.2006 "Nuclear Power Plant Priority" (in English), equivalent to the technical content, only in Georgia Ceremony, make a few editorial changes. This standard replaces GB/T 13177-2000 "nuclear power plants a priority." The standards are compared with the GB/T 13177-2000 The following major changes. --- Modify some of 4.4,5.1.2,5.1.4.1,5.3.3.3,5.3.4.4,6.3.2,7.2 content; The standard proposed by China National Nuclear Corporation. This standard by the National Standardization Technical Committee on nuclear instrumentation. This standard was drafted. Institute of Nuclear Industry Standardization. The main drafters of this standard. high Li-yan, Wang Gensheng. This standard replaces the standards previously issued as follows. --- GB/T 13177-1991, GB/T 13177-2000. Nuclear power plant priority

1 Scope

This standard specifies the priority of nuclear power plants (PPS) and priority level power supply and safety (1E-class) power system, switching stations, transmission system AC power and alternative (AAC) interface design guidelines. This standard applies to nuclear power plants a priority. FIG. 1 is a typical PPS interfaces with the power system. Note. AAC and PPS outside power interface does not belong to the scope of this standard. Figure 1 PPS Interface Figure

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB/T 12788 Nuclear power plant safety level Power System Guidelines (GB/T 12788-2008, IEEEStd308.2001, MOD) EJ/T 639 nuclear power plants safety level power systems and equipment protection guidelines (IEEEStd741, MOD)

3 Terms and Definitions

The following terms and definitions apply to this standard. 3.1 Safety analysis by nuclear power plants proved to be suitable. 3.2 Provided at or near a nuclear power plant AC power and meet the following requirements. a) It can be connected (but usually not connected) outside the plant or plant emergency AC power system; b) the priority or power plant emergency AC common mode failure probability minimum;
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 13177-2008_English be delivered?

Answer: Upon your order, we will start to translate GB/T 13177-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 13177-2008_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 13177-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 13177-2008?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 13177-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.