GB/T 12325-2008 PDF EnglishUS$165.00 · In stock · Download in 9 seconds
GB/T 12325-2008: Power quality - Deviation of supply voltage Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure Status: Valid GB/T 12325: Historical versions
Similar standardsGB/T 12325-2008: Power quality - Deviation of supply voltage---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT12325-2008NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 27.100 K 04 Replacing GB/T 12325-2003 Power quality - Deviation of supply voltage Issued on. JUNE 18, 2008 Implemented on. MAY 01, 2009 Issued by. General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of PRC. Table of ContentsForeword... 3 1 Scope... 4 2 Normative references... 4 3 Terms and definitions... 4 4 Limit value of supply voltage deviation... 5 5 Measurement of supply voltage deviation... 5 Appendix A (Informative) Statistics of voltage qualification rate... 7 Appendix B (Informative) Monitoring of power grid voltage and statistics of regional grid voltage qualification rate... 8 References... 10ForewordThis standard replaces GB/T 12325-2003 "Power quality - Allowable deviation of supply voltage". As compared with GB/T 12325-2003, the main changes of this standard are as follows. - CHANGE the standard name to "Power quality - Deviation of supply voltage"; - To facilitate understanding and implementation, the first three terms are harmonized with GB 156 (see 3.1 ~ 3.3); MDOFIY the definition of "voltage deviation" (see 3.4); ADD the term "voltage qualification rate" (see 3.5); - ADD the limit of voltage deviation of 20 kV voltage level (see 4.2); - In the text, ADD the "measurement of deviation of supply voltage" to enhance the standard operability; - ADD "Appendix A Statistics of voltage qualification rate", "Appendix B Monitoring of power grid voltage and statistics of voltage qualification rate of local power grid"; Appendix A and Appendix B of this standard are informative appendixes. This standard was proposed by and shall be under the jurisdiction of the National Standardization Technical Committee on Voltage, Current Rating and Frequency. Drafting organizations of this standard. China Electric Power Research Institute, North China Electric Power Research Institute Co., Ltd., China Machine Productivity Promotion Center, China Southern Power Grid Co., Ltd., China Railway Eryuan Engineering Group Corporation, Sinopec Engineering Construction Company, Shanghai Coal Research Institute Branch, Shanghai Volkswagen, The First Survey and Design Institute of Railway. The main drafters of this standard. Zhou Shengjun, Yu Kunshan, Tan Zhiqiang, Liu Xun, Lin Haixue, Wu Qiong, Lin Zongliang, Song Jianzhong, Zhang Jian, Fang Zhenghui, Wei Hongwei. This standard replaces the versions previously issued as follows. - GB 1225-1990, GB/T 12325-2003. Power quality - Deviation of supply voltage1 ScopeThis standard specifies the limits, measurement and qualification rate statistics of supply voltage deviation. This standard applies to the deviation of the nominal system voltage of the power supply voltage of the AC 50 Hz power system under normal operating conditions.2 Normative referencesThe provisions in following documents become the provisions of this Standard through reference in this Standard. For the dated references, the subsequent amendments (excluding corrections) or revisions do not apply to this Standard; however, parties who reach an agreement based on this Standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies. GB/T 156-2007 Standard voltage (IEC 60038.2002, MOD)3 Terms and definitionsThe following terms and definitions apply to this standard. 3.1 Nominal system voltage A given value which is used to mark or identify the system voltage. 3.4 Voltage deviation The relative deviation of the actual operating voltage from the nominal system voltage, expressed as a percentage. 3.5 Voltage qualification rate The percentage of the cumulative operating time to the corresponding total statistical operating time at the actual operating voltage deviation within the limit range.4 Limit value of supply voltage deviation4.1 The sum of the absolute values of the positive and negative deviations of the supply voltage of 35 kV and above shall not exceed 10% of the nominal voltage. 4.2 The deviation of the three-phase power supply voltage at 20 kV and below is ±7% of the nominal voltage. 4.3 The deviation of 220V single-phase power supply voltage is +7%, -10% of the nominal voltage.5 Measurement of supply voltage deviation5.1 Classification of performance of measuring instruments There are two levels of measuring instrument’s performance, which are defined as follows. 5.2 Measuring method of supply voltage deviation The basic measurement time window for obtaining the effective voltage shall be 10 cycles; each measurement time window shall be close to the immediately adjacent measurement time window without overlapping. 5.3 Instrument accuracy The measurement error of the level A performance voltage monitor shall not exceed ±0.2%; the measurement error of the level B performance instrument shall not exceed ±0.5%.Appendix A(Informative) Statistics of voltage qualification rate The monitored power supply point is called the monitoring point; the voltage qualification rate is obtained through the statistical calculation of the supply voltage deviation.Appendix B(Informative) Monitoring of power grid voltage and statistics of regional grid voltage qualification rate B.1 Monitoring of power grid voltage The monitoring of power grid voltage is divided into four categories of monitoring points. A, B, C, D. ......Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al. Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of English version of GB/T 12325-2008 be delivered?Answer: The full copy PDF of English version of GB/T 12325-2008 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.Question 2: Can I share the purchased PDF of GB/T 12325-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 12325-2008_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 12325-2008 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.Question 5: Should I purchase the latest version GB/T 12325-2008?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 12325-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.How to buy and download a true PDF of English version of GB/T 12325-2008?A step-by-step guide to download PDF of GB/T 12325-2008_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).Step 2: Search keyword "GB/T 12325-2008". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9 |