GB/T 11601-2023 English PDFUS$259.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 11601-2023: The requirement for inspection and exchange of container of port and station for in or out Status: Valid GB/T 11601: Historical versions
Basic dataStandard ID: GB/T 11601-2023 (GB/T11601-2023)Description (Translated English): The requirement for inspection and exchange of container of port and station for in or out Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: A85 Classification of International Standard: 55.180.10 Word Count Estimation: 13,145 Date of Issue: 2023-03-17 Date of Implementation: 2023-07-01 Older Standard (superseded by this standard): GB/T 11601-2000 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 11601-2023: The requirement for inspection and exchange of container of port and station for in or out---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS55:180:10 CCSA85 National Standards of People's Republic of China Replacing GB/T 11601-2000 Requirements for inspection and handover of containers entering and leaving port stations Released on 2023-03-17 2023-07-01 implementation State Administration for Market Regulation Released by the National Standardization Management Committee table of contentsPreface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Requirements for box inspection items 2 5 Technical requirements for box inspection 5 6 Container Handover Technical Requirements 7 7 Information management requirements 8forewordThis document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting: This document replaces GB/T 11601-2000 "Requirements for Inspection and Handover of Container Entry and Exit Stations": Compared with GB/T 11601-2000, except Apart from structural adjustments and editorial changes, the main technical changes are as follows: a) Change the term "inspection" to "container inspection", and "handover" to "container handover" (see 3:2, 3:3, 3:2,:2000 version 3:3); b) The regulations on external inspection items such as the surface of the box body, box seal, and cleanliness have been changed (see 4:2, 4:1 of the:2000 edition); c) The inspection item requirements for closed ventilated containers and insulated containers have been deleted (see 4:3 of the:2000 edition); d) Added inspection items for refrigerated containers (see 4:4); e) Change "gross weight" to "gross weight" (see 6:1:2, 6:1:2 of the:2000 edition); f) Change the information management requirements for the whole process of inspection and handover of containers entering and leaving the port (see Chapter 7, Chapter 7 of the:2000 edition): Please note that some contents of this document may refer to patents: The issuing agency of this document assumes no responsibility for identifying patents: This document is proposed and managed by the National Container Standardization Technical Committee (SAC/TC6): This document is drafted by: Water Transport Research Institute of the Ministry of Transport, Scientific Research Institute of the Ministry of Transport, Shanghai China Grain Logistics Co:, Ltd: Division, Anhui Port Group Wuhu Co:, Ltd:, Fujian Jinhang International Freight Forwarding Co:, Ltd:, Shenzhen Institute of Standard Technology, Shanghai International Port Service (Group) Co:, Ltd:, Shandong Port Qingdao Port Group Co:, Ltd:, and China Railway Tielong Container Logistics Co:, Ltd: The main drafters of this document: Li Jichun, Zhang Haozhi, Zhang Lei, Liu Jianping, Han Qingyuan, Chen Xiaoxu, Ji Bin, Zou Ying, Gao Jun, Chen Zhiyong, Pan Yao, Zhao Jieting, Wang Jing: This document was first published in 1989, revised for the first time in:2000, and this is the second revision: Requirements for inspection and handover of containers entering and leaving port stations1 ScopeThis document specifies the container inspection items, container inspection technical requirements, container handover technical requirements and information management requirements: This document is applicable to the inspection and handover of containers when they enter and leave the port:2 Normative referencesThe contents of the following documents constitute the essential provisions of this document through normative references in the text: Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document: GB/T 16561 Container Equipment Handover List GB/T 17271 Container Transport Terminology GB/T 17273 Container Equipment Data Exchange (CEDEX) General Communication Code3 Terms and DefinitionsThe following terms and definitions defined in GB/T 17271 apply to this document: 3:1 Port station portandstation The general term for container terminals, yards and freight stations: 3:2 Box inspection container inspection Inspection of the internal and external conditions of the container: [Source: GB/T 17271-2023,5:12] 3:3 container handover containerexchange Containers are handed over from one party to another in various states: [Source: GB/T 17271-2023, 4:2:11] 3:4 unboxing destuffing; unloading The operation of removing goods from the container: [Source: GB/T 17271-2023,5:2] 3:5 packing stuffing; loading The operation of loading goods into containers: [Source: GB/T 17271-2023,5:1] ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 11601-2023_English be delivered?Answer: Upon your order, we will start to translate GB/T 11601-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 11601-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 11601-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 11601-2023?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 11601-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |