GB 38263-2019 PDF EnglishUS$140.00 · In stock · Download in 9 seconds
GB 38263-2019: The norm of energy consumption per unit throughput of cement products Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure Status: Valid
GB 38263-2019: The norm of energy consumption per unit throughput of cement products---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB38263-2019NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 27.010 F 01 The norm of energy consumption per unit throughput of cement products ISSUED ON: OCTOBER 14, 2019 IMPLEMENTED ON: MAY 01, 2020 Issued by: State Administration for Market Regulation; Standardization Administration of PRC. Table of ContentsForeword ... 3 1 Scope ... 4 2 Normative references ... 4 3 Terms and definitions ... 5 4 Level of norm of energy consumption ... 6 5 Technical requirements ... 7 6 Energy consumption statistics and calculation methods ... 7 The norm of energy consumption per unit throughput of cement products1 ScopeThis standard specifies the terms and definitions, norm level of energy consumption, technical requirements, energy consumption statistics, calculation methods for the norm of energy consumption per unit throughput of cement products. This standard applies to the calculation and assessment of the energy consumption of cement product manufacturing enterprises, as well as the energy consumption control of newly built (renovated, expanded) projects.2 Normative referencesThe following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this standard. GB/T 2589 General principles for calculation of total production energy consumption GB/T 4623 Circular concrete pole GB/T 11836 Concrete and reinforced concrete sewer pipes GB/T 11968 Autoclaved aerated concrete blocks GB/T 12723 General principles for establishing allowance of energy consumption per unit throughput GB/T 13476 Pretensioned spun concrete piles GB/T 15762 Autoclaved aerated concrete slab GB 17167 General principle for equipping and managing of the measuring instrument of energy in organization of energy using GB/T 19685 Prestressed concrete cylinder pipe GB/T 22082 Reinforced concrete segments GB/T 31039 Pre-tensioned prestressed centrifugal concrete shaped pile JC/T 412.1 Fiber cement flat sheets - Part 1: Non-asbestos fiber cement flat sheets JC/T 412.2 Fiber cement flat sheets - Part 2: Asbestos fiber cement flat sheets JC/T 564.1 Fiber reinforced calcium silicate boards. Part 1: Non-asbestos calcium silicate boards JC/T 564.2 Fiber reinforced calcium silicate boards - Part 2: Asbestos calcium silicate boards JC/T 2029 Precast prestressed spun concrete square piles3 Terms and definitionsThe terms and definitions as defined in GB/T 12723 as well as the following terms and definitions apply to this document. 3.1 Comprehensive energy consumption of cement products During the reporting period, the total energy consumption of a certain type of cement product in the entire product production process from the entry of raw materials into the plant and the metering of energy into the process until the finished product exit-warehouse. 3.2 The comprehensive energy consumption per unit product throughput of cement products During the reporting period, the comprehensive energy consumption of a certain type of cement product expressed in terms of the unit (per cubic meter of concrete) qualified product throughput. 3.3 The coal consumption per unit throughput of cement products During the reporting period, the steam (or steam-producing fuel) consumption of a certain type of cement product expressed as the unit (per cubic meter) of qualified product throughput. 6.1.1.2 The calorific value of various energy sources shall be converted into a unified standard coal. The calorific value of various energy sources is based on the caloric value measured by the enterprise during the reporting period. If there are no actual measurement conditions, it shall use the reference coefficients for converting various standard energy sources as given in GB/T 2589. 6.1.1.3 The statistics and accounting of energy consumption shall include the above-mentioned various production links; it shall not be repeated or missed. 6.1.2 Classification 6.1.2.1 Precast concrete pile The energy consumption of such products shall be subject to statistics in the entire production process of product from the entry of raw materials [cement, admixtures (fine sand, fine slag powder, silica fume, fly ash, etc.), aggregates, admixtures, PC steel rods, end plates, pile ferrules, steel bars (hot-rolled wire rod, cold-drawn wire, etc.) etc.] into factory and the including of energy into the procedure through metering, to the exit-warehouse of metered finished product. 6.1.2.2 Circular concrete pole The energy consumption of such products shall be subject to statistics in the entire production process of product from the entry of raw materials [cement, admixtures (fine sand, silica fume, etc.), aggregates, additives, flanges, steel bars (pre-tensioned bars, hot-rolled wire rod, cold-drawn wire, etc.) etc.] into factory and the including of energy into the procedure through metering, to the exit-warehouse of metered finished product. 6.1.2.3 Concrete and reinforced concrete sewer pipes The energy consumption of such products shall be subject to statistics in the entire production process of product from the entry of raw materials [cement, aggregates, additives, steel bars (hot-rolled wire rod, cold-drawn wire, etc.) etc.] into factory and the including of energy into the procedure through metering, to the exit-warehouse of metered finished product. 6.1.2.4 Prestressed steel tube concrete pipe The energy consumption of such products shall be subject to statistics in the entire production process of product from the entry of raw materials [cement, aggregate, admixtures, steel plates (including socket rings and plug rings), steel bars (prestressed steel bars, hot-rolled wire rods, cold-drawn wires, etc.), etc.] into factory and the including of energy into the procedure through metering, to the exit-warehouse of metered finished product. 6.1.2.5 Aerated concrete Where: E - Comprehensive energy consumption of a certain type of cement product throughput during the reporting period, in kilograms of standard coal (kgce); ei - The physical quantity of the i-th energy consumed by a certain type of cement product during the reporting period, in kilograms (kg); ρi - The converted standard coal coefficient of the i-th energy source; n - Number of energy types consumed. 6.3.3 Comprehensive energy consumption per unit throughput of cement product The comprehensive energy consumption per unit throughput of cement product is calculated according to formula (2), among which the coal consumption per unit of cement product throughput in cold regions shall be corrected according to the calculation method of 6.3.4. Where: Eg - The comprehensive energy consumption per unit throughput of a certain type of cement product during the reporting period (converted into energy consumption per cubic meter, expressed in the form of standard coal consumption), in kilogram standard coal per cubic meter (kgce/m3); G - Throughput of qualified products of a certain type of cement products during the reporting period (converted to cubic meters), in cubic meters (m3). 6.3.4 Correction of coal consumption per unit throughput of cement products in cold regions 6.3.4.1 The corrected value of coal consumption per unit throughput of cement products in cold regions in winter is determined according to formula (3): Where: E'gM - Corrected value of coal consumption per unit throughput of cement products in cold regions in winter, in kilogram standard coal per cubic meter (kgce/m3); E'M - The actual coal consumption value of a certain type of cement product in winter in cold regions, in kilogram (kg); ......Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al. Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of English version of GB 38263-2019 be delivered?Answer: The full copy PDF of English version of GB 38263-2019 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.Question 2: Can I share the purchased PDF of GB 38263-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB 38263-2019_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB 38263-2019 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.How to buy and download a true PDF of English version of GB 38263-2019?A step-by-step guide to download PDF of GB 38263-2019_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).Step 2: Search keyword "GB 38263-2019". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9 |