GB 19079.30-2013 English PDFUS$149.00 ยท In stock
Delivery: <= 2 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 19079.30-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 30: Mountain outdoor place Status: Valid
Basic dataStandard ID: GB 19079.30-2013 (GB19079.30-2013)Description (Translated English): Operation conditions and technical requirements for gymnasium and playground -- Part 30: Mountain outdoor place Sector / Industry: National Standard Classification of Chinese Standard: Y55 Classification of International Standard: 97.220 Word Count Estimation: 5,593 Quoted Standard: GB 3838; GB/T 10001.1; GB 21734; GB/T 23268.1; JT/T 107 Regulation (derived from): National Standards Bulletin No. 20 of 2013 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies: Mountain outdoor open spaces should have the basic conditions and basic technical requirements. This standard applies to: open to the public Operating Mountain outdoor venues. GB 19079.30-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 30: Mountain outdoor place---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Operation conditions and technical requirements for gymnasium and playground.Part 30. Mountain outdoor place ICS 97.220 Y55 National Standards of People's Republic of China Sports venues open conditions and technical requirements Part 30. Mountain outdoor venues playground-Part 30. Mountainoutdoorplace Issued on. 2013-10-10 2014-05-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordAll technical content in this Part of GB 19079 is mandatory. GB 19079 "sports venues open conditions and technical requirements" is divided into the following sections. --- Part 1. swimming places; --- Part 2. Karting place; --- Part 3. Bungee place; --- Part 4. rock climbing places; --- Part 5. Skating place; --- Part 6. skiing; --- Part 7. figure skating place; --- Part 8. Shooting place; --- Part 9. Archery place; --- Part 10. Dive sites; --- Part 11. rafting place; --- Part 12. gliding wing place; --- Part 13. Balloon and Airship place; --- Part 19. expansion spaces; --- Part 20. hockey place; --- Part 21. Boxing place; --- Part 22. Taekwondo place; --- Part 23. trampoline place; --- Part 24. Aircraft movement places; --- Part 25. skydiving place; --- Part 26. aerospace model places; --- Part 27. Directional, radio direction finding places; --- Part 28. Sanda place; --- Part 29. climbing places; --- Part 30. Mountain outdoor venues; --- Part 31. Alpine Adventure venues; This is Part 30 GB 19079's. This section drafted in accordance with GB/T 1.1-2009 given rules. This section is proposed and managed by the State Sports General Administration. This section is drafted. State Sports General Administration mountaineering Management Center, State Sports General Administration of Sports Science Institute, China University of Geosciences (Wuhan). The main drafters of this section. Yan Jinan, Zhang Zhijian, Dong Fan, Zhou Jinlin FORCES Fang Xiang. Sports venues open conditions and technical requirements Part 30. Mountain outdoor venues1 ScopeGB 19079 of the provisions of this part of the mountain open outdoor space should have the basic conditions and the basic technical requirements. This section applies to an open society operating mountain outdoor space.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 3838 Surface Water Quality Standards GB/T 10001.1 Public information graphical symbols - Part 1. Common symbols GB 21734 earthquake emergency shelter sites and facilities GB/T 23268.1 sports protective equipment requirements - Part 1. Dynamic mountaineering rope JT/T 107 Marine lifejacket Working3 Terms and DefinitionsThe following terms and definitions apply to this document. 3.1 Mountain Outdoor Sports mountainoutdoorsports The following training at an altitude of 3500m (5000m above sea level in Tibet or less) under natural conditions for carrying out the mountain, race, fitness and recreation And other activities. Note. Does not include natural rock, ice wall climbing activities. 3.2 Mountain outdoor space mountainoutdoorplace Mountain outdoor sports activities in the area, including mountain base for outdoor sports, theme parks, and mountain trekking (hiking) channel, fixed abseiling Road Lines. 3.3 Mountain Outdoor Sports technical guidance personnel mountainoutdoorsportsinstructors Mountain Outdoor Sports teach theory and skills of the staff. 3.4 Mountain outdoor sports participants mountainoutdoorsportsparticipants Participants mountain outdoor sports. 3.5 Mountain Outdoor Sports duration durationofmountainoutdoorsports Continuous time-mountain outdoor sports, during rest time of not more than 20min, no more than once per hour.4 QualifyingMountain Outdoor Sports technical guidance personnel, rescue personnel should hold the relevant national vocational qualification certificate before taking. 5 places, facilities and conditions 5.1 Mountain Outdoor spaces 5.1.1 geological conditions should be stable and secure region. 5.1.2 There are clear, eye-catching, solid project signs, maps, bulletin boards, ambulance stations, hazardous area warning signs and other identification. 5.1.3 Public instructions should be consistent with the identification GB/T 10001.1 requirements. 5.1.4 Water workplace environment should meet the requirements of GB 3838. 5.1.5 Project camp should be equipped with water and toilet. Facilities and equipment 5.2 5.2.1 seat belts, helmets, locks, static rope, sling, quickdraw, risers, down, brake protection, and other equipment, should have the quality inspection Inspection of conformity. 5.2.2 The power cord should be consistent with GB/T 23268.1 requirements. 5.2.3 Lifesaving equipment technology and equipment shall comply with JT/T 107 requirements. 5.2.4 should be set up emergency shelters. Emergency shelters should meet the requirements specified in GB 21734. 6 health, environmental management Waste disposal systems, sewage treatment systems shall comply with the relevant regulations.7 Security7.1 should establish and improve the safe production responsibility system for posts, rescue and safety management system, as well as equipment and facilities maintenance system, emergency warning system. 7.2 should establish a regional mountain rescue system. 7.3 mountaineering outdoor sports program of activities should be, risk assessment and contingency plans, which should include a program of activities for regional activities (drawings) and Active route (drawings). 7.4 should be developed "Safety" and before each activity on the mountain outdoor sports participants declared. 7.5 can not be carried out in the mountainous outdoor sports thunderstorms, hurricanes, hail and other adverse weather conditions. 7.6 Mountain outdoor sports activities lasting longer than 8h, mountain outdoor sports and technical guidance personnel ratio Mountain outdoor sports participants Not less than 1.12. 7.7 requires specialized technical equipment, there are upstream, canyoning, abseiling activities in which more than one professional technical project, Mountain Outdoor Sports Technical guidance personnel and proportion mountain outdoor sports participants should not be less than 5. 7.8 Mountain Outdoor spaces should be equipped with safety inspectors and maintenance personnel. 7.9 Mountain Outdoor recreation practitioners induction should wear clearly marked. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 19079.30-2013_English be delivered?Answer: Upon your order, we will start to translate GB 19079.30-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 2 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB 19079.30-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB 19079.30-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |