HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB/T 6907-2022 PDF English

US$170.00 · In stock · Download in 9 seconds
GB/T 6907-2022: Analysis of water used in boiler and cooling system - Sampling method of water
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 6907: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB/T 6907-2022English170 Add to Cart 0-9 seconds. Auto-delivery Analysis of water used in boiler and cooling system - Sampling method of water Valid
GB/T 6907-2005English279 Add to Cart 3 days Analysis of water used in boil and cooling system -- The sampling method of water Obsolete
GB/T 6907-1986English279 Add to Cart 3 days Methods for analysis of water for boiler and for cooling--The sampling method for water Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB/T 6907-2022
      

Similar standards

GB/T 6913   GB/T 6903   GB/T 6907   

GB/T 6907-2022: Analysis of water used in boiler and cooling system - Sampling method of water

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT6907-2022
NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 13.060.25 CCS G 76 Replacing GB/T 6907-2005 Analysis of water used in boiler and cooling system - Sampling method of water ISSUED ON: MARCH 09, 2022 IMPLEMENTED ON: OCTOBER 01, 2022 Issued by: State Administration for Market Regulation; Standardization Administration of the People’s Republic of China.

Table of Contents

Foreword ... 3 1 Scope ... 5 2 Normative references ... 5 3 Terms and definitions... 5 4 Method summary ... 5 5 Sampling container ... 6 6 Collection method of water samples ... 6 7 Other matters of water sample collection ... 11 8 Storage and transportation of water samples ... 11 9 Water sample collection record ... 11 Appendix A (Informative) Reference volume and storage time for water sample collection ... 12 Appendix B (Informative) Water sample collection record ... 13 Analysis of water used in boiler and cooling system - Sampling method of water

1 Scope

This document describes the collection container, collection method, storage, transportation and recording of samples of water used in boiler and cooling system. This document applies to the collection of samples of water used in boiler and cooling system.

2 Normative references

The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the version corresponding to that date is applicable to this document; for undated references, the latest version (including all amendments) is applicable to this document. GB/T 1576, Water quality for industrial boilers GB/T 6682-2008, Water for analytical laboratory use - Specification and test methods GB/T 6903, Analysis of water used in boiler and cooling system - General rule GB/T 50050, Code for design of industrial recirculating cooling water treatment

3 Terms and definitions

Terms and definitions defined in GB/T 1576, GB/T 6903 and GB/T 50050 apply to this document.

4 Method summary

According to the determination requirements, select a suitable sampling container, collect water samples at representative locations, and obtain representative water samples that meet the requirements according to the storage and transportation conditions of the samples. 6.3 Collection methods of water samples in high temperature and high-pressure devices or pipelines 6.3.1 When sampling in high temperature and high-pressure devices or pipelines, the sampling pipe shall be made of stainless steel. Sampling devices for boiler feed water, boiler water, steam and drain shall be equipped with coolers. 6.3.2 When collecting water samples installed with a sampling cooler, the opening of the sampling valve shall be adjusted so that the flow rate of the water sample is at 300 mL/min ~ 700 mL/min, and the flow rate is kept stable. At the same time, adjust the amount of cooling water, so that the temperature of the water sample is less than 40 °C. The sampling valves for feed water, boiler water and steam shall be kept open; when collecting other water samples, the accumulated water in the pipeline shall be drained and rinsed before sampling. 6.4 Other special collection methods of water samples 6.4.1 When determining unstable components in water samples, it shall be measured on site. If it is not possible to measure on site, the unstable components shall be converted into stable state and then measured. 6.4.2 When measuring the organics in raw water, circulating cooling water and its make-up water, it shall be measured as soon as possible after sampling, otherwise, the water sample shall be adjusted to pH less than 2 by adding acid for preservation; when measuring trace organics in the water samples involved in the boiler water treatment system, the water sample is subject to no treatment after collection, and shall be measured as soon as possible. 6.4.3 When measuring trace of iron, copper, aluminum and other components in the water sample, the sampling bottle shall be soaked in hydrochloric acid solution (1+1) of analytical grade or above for more than 12 hours, and then fully cleaned by grade-1 water that meets the requirements of GB/T 6682-2008. Before sampling, add an appropriate amount of hydrochloric acid solution (1+1) of guaranteed reagent or above, or nitric acid solution (1+1) to the sampling bottle in advance to make the pH value of the water sample about 2; shake it up immediately after sampling. If there is no acid addition condition, filter 10 L ~ 20 L of water sample by membrane method; measure the metal ions on the filter membrane and in the filtrate respectively, to obtain the content of metal ions in the water sample. 6.4.4 When measuring the hydrazine content in water samples, a special ground glass bottle shall be used to collect water samples; 1 mL of hydrochloric acid of analytical reagent or above shall be added in advance for every 100 mL of water samples, and the collected water samples shall fill the sampling bottle. 6.4.5 When determining the bacterial content in water, pre-sterilized sealed glass bottles or commercially available disposable sterilized sampling bottles shall be used to collect water samples, which shall be measured within 24 hours after sampling.

7 Other matters of water sample collection

7.1 Before sampling, the sampling bottle shall be cleaned in advance, and then rinsed three times with the water sample to be tested (except as otherwise specified in the test method); then, the water sample shall be collected and quickly sealed. 7.2 The sampling volume shall meet the test and review needs. Appendix A gives the reference volume for water sample collection. If the water sample is turbid, the collected water sample shall be divided into two sampling containers. 7.3 The collected water samples shall be labelled, indicating the name of the water sample, the sampling location, the name of the sampling person, and the sampling time. 7.4 When collecting water samples for field control test, special sampling bottles with obvious marks shall be used.

8 Storage and transportation of water samples

8.1 Storage and transportation conditions of water samples Water samples shall be stored in a cool and dry place, or refrigerated if conditions permit. If there are special requirements, save them according to the relevant test requirements. Water samples shall be protected from freezing and sunshine during transportation; when measuring the stored or transported water samples, the storage time and storage conditions shall be indicated in the water sample collection record form (see Appendix B). 8.2 Storage time of water samples The water samples shall be measured in time after collection, and the storage and transportation time shall be shortened as much as possible. See Appendix A for the reference time for storage of water samples after collection.

9 Water sample collection record

See Appendix B for the format of water sample collection record. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB/T 6907-2022 be delivered?

Answer: The full copy PDF of English version of GB/T 6907-2022 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 6907-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 6907-2022_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB/T 6907-2022 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB/T 6907-2022?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 6907-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB/T 6907-2022?

A step-by-step guide to download PDF of GB/T 6907-2022_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 6907-2022".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9