HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 36547-2024 PDF English

US$320.00 · In stock · Download in 9 seconds
GB/T 36547-2024: Technical requirements for connecting electrochemical energy storage station to power grid
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 36547: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB/T 36547-2024English320 Add to Cart 0-9 seconds. Auto-delivery Technical requirements for connecting electrochemical energy storage station to power grid Valid
GB/T 36547-2018English225 Add to Cart 0-9 seconds. Auto-delivery Technical rule for electrochemical energy storage system connected to power grid Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB/T 36547-2024
      

Similar standards

GB/T 36548   GB/T 36558   GB/T 36276   GB/T 36545   

GB/T 36547-2024: Technical requirements for connecting electrochemical energy storage station to power grid


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT36547-2024
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 27.180 CCS F 19 Replacing GB/T 36547-2018 Technical Requirements for Connecting Electrochemical Energy Storage Station to Power Grid Issued on. MAY 28, 2024 Implemented on. DECEMBER 1, 2024 Issued by. State Administration for Market Regulation; Standardization Administration of the People’s Republic of China.

Table of Contents

Foreword... 3 1 Scope... 6 2 Normative References... 6 3 Terms and Definitions... 7 4 Overall Requirements... 8 5 Power Control... 9 6 Primary Frequency Control... 10 7 Inertia Response... 11 8 Fault Ride-through... 12 9 Operation Adaptability... 18 10 Power Quality... 19 11 Relay Protection and Automatic Safety Devices... 20 12 Dispatching Automation and Communication... 21 13 Simulation Models... 22 14 Test and Evaluation of Connection to the Power Grid... 22 Bibliography... 24

1 Scope

This document stipulates the overall requirements for connecting electrochemical energy storage stations to the power grid, as well as the technical requirements for power control, primary frequency control, inertia response, fault ride-through, operation adaptability, power quality, relay protection and automatic safety devices, dispatching automation and communication, simulation models, and test and evaluation of connection to the power grid. This document is applicable to the construction, connection, commissioning, test, inspection, operation, maintenance and overhaul of newly constructed, renovated and expanded electrochemical energy storage stations connected to the public power grid through voltage levels of 10 (6) kV and above.

2 Normative References

The contents of the following documents constitute indispensable clauses of this document through the normative references in the text. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document. GB/T 12325 Power Quality - Deviation of Supply Voltage GB/T 12326 Power Quality - Voltage Fluctuation and Flicker GB 14050 Types and Safety Technical Requirements of System Earthing GB/T 14285 Technical Code for Relaying Protection and Security Automatic Equipment GB/T 14549 Quality of Electric Energy Supply - Harmonics in Public Supply Network GB/T 15543 Power Quality - Three-phase Voltage Unbalance GB/T 19862 General Requirements for Monitoring Equipment of Power Quality GB/T 22239 Information Security Technology - Baseline for Classified Protection of Cybersecurity

3 Terms and Definitions

The terms and definitions defined in DL/T 2528, and the following are applicable to this document. 3.1 primary frequency control; PFC When the power system frequency deviates from the target frequency, the control function of the electrochemical energy storage station to automatically regulate the active power in response to frequency deviations of the power system. 3.2 delay time of PFC From when the power system frequency exceeds the primary frequency control dead zone, the time required for the actual output active power change of the electrochemical energy storage station to reach 10% of the difference between the target value and the initial value of active power. 3.3 rise time of PFC From when the power system frequency exceeds the primary frequency control dead zone, the time required for the actual output active power change of the electrochemical energy storage station to reach 90% of the difference between the target value and the initial value of active power. 3.4 settling time of PFC From when the power system frequency exceeds the primary frequency control dead zone, the shortest time that the absolute value of the difference between the actual output active power and the target value of active power of the electrochemical energy storage station never exceeds the allowable deviation.

4 Overall Requirements

4.1 The electrochemical energy storage station shall have the capability of participating in peak regulation, frequency control and voltage regulation, etc. of the power system, and its safe and stable operation shall comply with the provisions of GB 38755 and GB/T 31464. 4.4 The network security protection of the electrochemical energy storage station shall comply with the provisions of GB/T 36572. 4.5 The grounding mode of the electrochemical energy storage station shall be compatible with the grounding mode of the power grid, to which, it is connected. Lightning protection and grounding shall comply with the technical regulations of GB 14050, GB 50057 and GB/T 50065. 4.6 The electrochemical energy storage station connected to the power grid shall establish electromagnetic transient, electromechanical transient and medium and long-term dynamic simulation models in accordance with the requirements of GB/T 42716. 4.7 The electrochemical energy storage station shall have a clarified electric energy measurement point. The electric energy measurement point shall be located at the grid connection point, equipped with a two-way electric energy measurement device, and have the function of remote transmission of electric energy measurement information. The technical requirements shall comply with the provisions of GB/T 50063 and DL/T 448. 4.8 The charge energy and discharge energy of the electrochemical energy storage station shall not be lower than the rated charge energy and rated discharge energy.

5 Power Control

5.1 Active Power Control 5.1.1 The electrochemical energy storage station shall have the capability of controlling active power and shall be able to accept local and remote active power control instructions to achieve continuous regulation of active power. 5.2 Reactive Power Control 5.2.1 The electrochemical energy storage station shall have the capabilities of reactive power regulation and voltage control and shall be able to accept local and remote control instructions to achieve continuous regulation of reactive power / voltage. 5.2.2 The electrochemical energy storage station shall have the control modes for power factor, reactive power and voltage control, and have the function of online switching control modes. 5.2.3 The power factor of the grid connection point of the electrochemical energy storage station shall be continuously adjustable within the range of 0.9 (lead) ~ 0.9 (lag). 5.2.4 Within the adjustable range of reactive power of the electrochemical energy storage station, the reactive power control deviation shall not exceed  3% of the rated power. 5.3 Overload Capability The electrochemical energy storage station shall have the overload capability. Under the nominal voltage, the operating time of 110% rated power shall not be less than 10 minutes, and the operating time of 120% rated power shall not be less than 1 minute.

6 Primary Frequency Control

6.1 The electrochemical energy storage station shall have the function of primary frequency control, which can be turned on or off through local or remote control in accordance with the demands of the power system. 6.2 The electrochemical energy storage station shall upload the turn-on-off signals and action status signals of primary frequency control to the power grid dispatching institution. 6.4 When the power system frequency drops and exceeds the frequency control dead zone, the electrochemical energy storage station shall increase the active power for discharging or reduce the active power for charging in accordance with the primary frequency control curve. 6.7 The error adjustment rate of primary frequency control of the electrochemical energy storage station shall be 0.5% ~ 3%. 6.8 The delay time of PFC shall not be greater than 1 second, the rise time of PFC shall not be greater than 3 seconds, and the settling time of PFC shall not be greater than 4 seconds. When reaching stability, the active power control deviation shall not exceed  1% of the rated power.

7 Inertia Response

7.1 The electrochemical energy storage station shall have the function of inertia response, which can be turned on or off through local or remote control in accordance with the demands of the power system. 7.2 The electrochemical energy storage station shall upload the turn-on-off signals and action status signals of inertia response to the power grid dispatching institution. 7.4 During inertia response, the active power change of the electrochemical energy storage station shall satisfy the requirements of Formula (3).

8 Fault Ride-through

8.1 Low-voltage Ride-through 8.1.1 When the voltage at the grid connection point drops, the electrochemical energy storage station shall have the capability of low-voltage ride-through. Within the shaded range shown in Figure 1, it shall continuously operate without being disconnected from the power grid. See the specific requirements below. 8.1.2 When a three-phase symmetrical fault occurs in the power system, causing the voltage at the grid connection point of the electrochemical energy storage station to drop, the electrochemical energy storage station shall have the capability of dynamic reactive support. See the specific requirements below. 8.2 High-voltage Ride-through 8.2.1 When the voltage at the grid connection point rises, the electrochemical energy storage station shall have the capability of high-voltage ride-through. Within the shaded range shown in Figure 2, it shall continuously operate without being disconnected from the power grid. See the specific requirements below. 8.2.2 When the voltage at the grid connection point of the electrochemical energy storage station rises, the electrochemical energy storage station shall have the capability of dynamic reactive support. See the specific requirements below. 8.3 Continuous Fault Ride-through 8.3.1 Continuous low-voltage ride-through The electrochemical energy storage station shall have the capability of continuous low-voltage ride-through. See the specific requirements below. 8.3.2 Continuous low-high voltage ride-through The electrochemical energy storage station connected to the UHV DC transmission terminal area shall have the capability of continuous low-high voltage ride-through. See the specific requirements below.

9 Operation Adaptability

9.1 Voltage Adaptability The voltage adaptability of the electrochemical energy storage station shall satisfy the requirements of Table 1. 9.3 Frequency Adaptability 9.3.1 The frequency adaptability of the electrochemical energy storage station shall satisfy the requirements of Table 2. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB/T 36547-2024 be delivered?

Answer: The full copy PDF of English version of GB/T 36547-2024 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 36547-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 36547-2024_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB/T 36547-2024 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB/T 36547-2024?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 36547-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB/T 36547-2024?

A step-by-step guide to download PDF of GB/T 36547-2024_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 36547-2024".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9