GB/T 2694-2018 PDF English
US$495.00 · In stock · Download in 9 secondsGB/T 2694-2018: Specification of manufacturing for transmission line tower Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid GB/T 2694: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
| GB/T 2694-2018 | English | 495 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Specification of manufacturing for transmission line tower
| Valid |
| GB/T 2694-2010 | English | 125 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Specification of manufacturing for transmission line tower
| Obsolete |
| GB/T 2694-2003 | English | 639 |
Add to Cart
|
5 days
|
Transmission line tower -- Technical requirements for manufacturing
| Obsolete |
| GB 2694-1981 | English | 359 |
Add to Cart
|
3 days
|
Transmission line towers--Technical requirements for manufacturing
| Obsolete |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 2694-2018
GB/T 2694-2018: Specification of manufacturing for transmission line tower---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT2694-2018
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 29.240.99
K 47
Replacing GB/T 2694-2010
Specification of manufacturing for transmission line tower
Issued on. JULY 13, 2018
Implemented on. FEBRUARY 01, 2019
Issued by. State Administration for Market Regulation;
National Standardization Administration.
Table of Contents
Foreword... 4
1 Scope... 5
2 Normative references... 5
3 Terms and definitions, symbols... 7
3.1 Terms and definitions... 7
3.2 Symbols... 9
4 General... 9
5 Materials... 10
5.1 Steel... 10
5.2 Welding materials... 11
5.3 Fasteners... 11
5.4 Zinc ingots... 11
6 Technical requirements... 12
6.1 Cutting... 12
6.2 Marking... 12
6.3 Forming (bending, flattening, opening and closing angles)... 13
6.4 Hole making... 14
6.5 Root cleaning, back shoveling, beveling... 15
6.6 Welding... 16
6.7 Assembly of welded parts... 23
6.8 Correction... 24
6.9 Hot dip galvanizing... 24
6.10 Trial assembly... 25
7 Inspection... 27
7.1 Certificate of conformity... 27
7.2 Inspection items... 27
7.3 Inspection requirements and methods... 27
7.4 Sampling plan and judgment principle... 29
8 Packaging, marking, transportation, storage... 33
8.1 Packaging... 33
8.2 Marking... 33
8.3 Transportation and storage... 33
9 Data handover requirements... 34
Appendix A (Normative) Hot-dip galvanizing layer uniformity test - Copper sulfate test
method... 35
Appendix B (Normative) Hot-dip galvanized layer adhesion test - Drop hammer test
method... 37
Appendix C (Normative) Test method for hot-dip galvanized layer thickness - Metal
coating thickness gauge test method... 38
Appendix D (Normative) Hot-dip galvanized layer adhesion test -- Dissolution
weighing test method... 39
1 Scope
This standard specifies the materials, technical requirements, inspection, packaging,
marking, transportation, storage in the manufacturing process of transmission line
towers (hereinafter referred to as "towers").
This standard applies to the manufacturing of angle steel towers for transmission lines.
It can be used as a reference for the manufacturing of power microwave towers, power
communication towers and similar steel structures.
2 Normative references
The following documents are essential to the application of this document. For the dated
documents, only the versions with the dates indicated are applicable to this document;
for the undated documents, only the latest version (including all the amendments) is
applicable to this standard.
GB/T 41 Hexagon nuts, style 1 - Product grade C
GB/T 95 Plain washers - Product grade C
GB/T 229 Metallic materials - Charpy pendulum impact test method
GB/T 470 Zinc ingots
GB/T 699 Quality carbon structure steels
GB/T 700 Carbon structural steels
GB/T 702 Hot-rolled steel bars - Dimensions, shape, weight and tolerances
GB/T 706 Hot rolled section steel
GB/T 709 Dimension shape weight and tolerances for hot-rolled steel plates and
sheets
3 Terms and definitions, symbols
3.1 Terms and definitions
The following terms and definitions apply to this document.
3.2 Symbols
The following symbols apply to this document.
4 General
4.1 The manufacture and inspection of the tower shall meet the design requirements.
When the design needs to be modified, the consent of the design organization shall be
obtained and the design change document shall be signed.
4.2 Matters not specified in this standard shall comply with the provisions of the
relevant current national standards.
4.4 The production process of the tower shall comply with the provisions of the
environment, safety, occupational health.
5 Materials
5.1 Steel
5.1.1 The specifications and grades of steel used in the manufacture of the tower shall
be selected according to the design requirements;
5.1.2 Steel materials shall have traceability marks. If the original traceability marks are
split during the manufacturing process, the marks shall be transplanted before the
materials are split.
5.2 Welding materials
5.2.1 The quality of welding materials such as welding rods, welding wires, fluxes shall
comply with the provisions of GB/T 5117, GB/T 5118, GB/T 5293, GB/T 8110, GB/T
10045, GB/T 12470, GB/T 17493.
5.2.2 The coating on the surface of the welding rod shall not fall off or be damp. The
surface of the welding wire shall be smooth and flat; there shall be no burrs, scratches,
rust, oxide scale or other impurities that have adverse effects on welding performance
and welding equipment operation performance.
5.2.3 The welding gas shall meet the requirements of GB/T 6052 and HG/T 3728.
5.2.4 Before the first use of each welding material, the mechanical properties test of the
deposited metal shall be carried out.
5.2.5 The management of welding materials shall comply with the provisions of JB/T
3223.
5.3 Fasteners
5.4 Zinc ingots
The quality requirements, test methods, inspection rules and markings, packaging,
transportation and storage of zinc ingots shall comply with the provisions of GB/T 470.
6 Technical requirements
6.1 Cutting
6.1.1 After cutting, there shall be no cracks or edge defects greater than 1.0 mm on the
fracture. The flatness of the cut surface shall not be greater than 0.05t (t is the thickness)
and shall not be greater than 2.0 mm. The depth of the cut mark shall not be greater than
0.3 mm. The allowable deviation of the local notch depth is 1.0 mm.
6.2.2 The steel stamps of the identification shall be arranged neatly; the font shall not
have defects; the font height is 8 mm ~ 18 mm.
6.2.3 The steel stamp shall not be pressed on the hole making, bending, milling, welding
parts.
6.3 Forming (bending, flattening, opening and closing angles)
6.4 Hole making
6.4.1 The punching surface shall not have obvious concave defects; burrs larger than
0.3 mm shall be removed. After hole making, there shall be no missing edges or
collapsed angles larger than 0.5 mm at the boundary intersection between the hole wall
and the part surface. The allowable deviation of hole making shall comply with the
provisions of Table 4.
6.6 Welding
6.6.1 Welding procedure qualification
For the steel, welding materials, welding methods, structural forms, preheating, post-
treatment, etc., which are used for the first time, welding procedure qualification shall
be carried out in accordance with GB 50661 before welding work; welding process
specifications and welding operation instructions shall be prepared.
6.6.2 Welder qualification
6.6.4 Welding groove
6.6.4.1 The form and size of the welding groove shall comply with the relevant
provisions of GB/T 985.1 and GB/T 985.2.The form and size of the groove with special
requirements for the drawings shall be determined, based on the drawings and
combined with the welding procedure qualification.
6.6.4.2 The welding groove shall be processed by mechanical methods first. When
flame cutting is used, the weld groove shall be flat, free of burrs, cracks, gas cutting
nodules, interlayers or other defects.
6.6.5 Welding rework
7 Inspection
7.1 Certificate of conformity
Products shall be inspected and accepted before leaving the factory and a product
certificate of conformity shall be issued.
7.3 Inspection requirements and methods
7.4 Sampling plan and judgment principle
7.4.1 Sampling principle
7.4.2 Inspection batch
The inspection batch can be composed of several production batches or part of the
production batch. The exit-factory inspection batch is determined according to the
actual situation. The inspection batch accepted by the buyer shall be based on the
contractual agreement between the supplier and the buyer.
7.4.6 Judgment principle
7.4.6.1 Judgment principle for parts
When the inspected parts have one of the following conditions, they shall be judged as
unqualified.
7.4.6.2 Comprehensive judgment principle
If one of the items in Class A is unqualified, the product shall be judged as unqualified;
if one of the items in Class B is not less than the rejection number (Re), the product
shall be judged as unqualified.
8 Packaging, marking, transportation, storage
8.1 Packaging
8.1.1 Angle steel packaging
8.1.1.1 The packaging length, number of bundles and weight of angle steel shall be
convenient for packaging, transportation, marking.
8.1.2 Connection plate packaging
The connection plate packaging should be fastened by long bolts and a lifting point
shall be set.
8.2 Marking
In addition to meeting the contract requirements, the marking shall also be identified in
a conspicuous position on the bundle, indicating the project name, tower type, nominal
height, tower number, bundle number, manufacturer name; the marking content shall
also meet the requirements of the transportation department.
8.3 Transportation and storage
During loading, unloading, transportation and storage, the packaging must not be
damaged to cause deformation of the product or damage to the galvanized layer.
9 Data handover requirements
The following information (but not limited to) shall be provided when the tower leaves
the factory.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 2694-2018 be delivered?Answer: The full copy PDF of English version of GB/T 2694-2018 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 2694-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 2694-2018_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 2694-2018 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds. Question 5: Should I purchase the latest version GB/T 2694-2018?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 2694-2018 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
How to buy and download a true PDF of English version of GB/T 2694-2018?A step-by-step guide to download PDF of GB/T 2694-2018_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB/T 2694-2018". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|