HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (29 Sep 2024)

GB/T 9766.4-2016 related PDF English

GB/T 9766.4-2016 (GB/T9766.4-2016, GBT 9766.4-2016, GBT9766.4-2016) & related versions
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)See DetailStatusSimilar PDF
GB/T 9766.4-2016English160 Add to Cart 0-9 seconds. Auto delivery. Test methods for tyre valves -- Part 4: Test methods for tubeless clamp-in valves GB/T 9766.4-2016 Valid GBT 9766.4-2016
GB/T 9766.4-2009English239 Add to Cart 3 days Test method for tyre valve -- Part 4: Test methods for clamp-in tubeless valves GB/T 9766.4-2009 Obsolete GBT 9766.4-2009
Buy with any currencies (Euro, JPY, KRW...): GB/T 9766.4-2016    Preview this PDF: GB/T 9766.4-2016



GB/T 9766.4-2016: PDF in English (GBT 9766.4-2016)
GB/T 9766.4-2016 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 83.160.01 G 41 Replacing GB/T 9766.4-2009 Test Methods for Tyre Valves - Part 4: Test Methods for Tubeless Clamp-in Valves ISSUED ON: FEBRUARY 24, 2016 IMPLEMENTED ON: JANUARY 1, 2017 Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China; Standardization Administration of the People’s Republic of China. Table of Contents Foreword ... 3 1 Scope ... 5 2 Normative References ... 5 3 Terms and Definitions ... 5 4 Test Equipment, Instruments and Apparatuses ... 5 5 Test Plate and Hole Size ... 7 6 Sealing Performance Test ... 8 7 Assembly Torque Test ... 10 8 Corrosion Resistance Test ... 10 Test Methods for Tyre Valves - Part 4: Test Methods for Tubeless Clamp-in Valves 1 Scope This Part of GB/T 9766 specifies the terms and definitions, test equipment, instruments and apparatuses, test plate and hole size of the tubeless clamp-in valves (hereinafter referred to as “valves”) test, as well as sealing performance test, assembly torque test and corrosion resistance test. This Part is applicable to the test of tubeless clamp-in valves of motorcycles, cars, light trucks, agricultural machinery and construction machinery, trucks and passenger cars. This Part is not applicable to the test of aviation tyre valves. 2 Normative References The following documents are indispensable to the application of this document. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document. GB 1796.4 Tyre Valves - Part 4: Clamp-in Valves GB 1796.6 Tyre Valves - Part 6: Cores GB/T 10125-2012 Corrosion Tests in Artificial Atmospheres - Salt Spray Tests GB/T 12716-2011 Pipe Threads with the Thread Angle of 60 Degrees where Pressure-tight Joints Are Made on Threads GB/T 12839 Terms and Definitions of Tyre Valves 3 Terms and Definitions The terms and definitions defined in GB/T 12839 are applicable to this document. 4 Test Equipment, Instruments and Apparatuses 4.1 Salt spray test chamber: the temperature in the chamber is 10 C ~ 50 C and the salt spray precipitation rate is 1 mL/(80 cm2  h) ~ 2 mL/(80 cm2  h). 15) kPa, and press and loosen the valve core once. The entrained gas during the installation is not considered as a leak. 6.1.2.2 Immerse the valve, together with the test device, in ethanol or methanol at ( 40  3) C; make the mouth of the valve face upward and at a distance of not more than 25 mm away from the liquid surface. Introduce (180  15) kPa of compressed air; within 60 s, observe and record whether there are bubbles escaping from the valve. For the valves with a core sleeve, observe and record whether there are bubbles escaping from the joints between the core sleeve and valve core, and the core sleeve and valve base. The entrained gas during the installation is not considered as a leak. 6.1.2.3 Increase the air pressure to the maximum operating pressure specified in GB 1796.4. Within 60 s, observe and record whether there are bubbles escaping from the valve. For the valves with a core sleeve, observe and record whether there are bubbles escaping from the joints between the core sleeve and valve core, and the core sleeve and valve base. The entrained gas during the installation is not considered as a leak. 6.1.3 Valve sealing performance test at high temperature 6.1.3.1 After the valve that has passed the test in 6.1.2 and the test device return to room temperature, put them together into the high-temperature test chamber at (100  3) C. In accordance with the maximum operating pressure specified in GB 1796.4, introduce the compressed air; after placing it for at least 48 h, press and loosen the valve core once. The entrained gas during the installation is not considered as a leak. 6.1.3.2 Immediately immerse the valve, together with the test device, in clean water at (66  3) C, make the mouth of the valve face upward and at a distance of not more than 25 mm away from the liquid surface. In accordance with the maximum operating pressure specified in GB 1796.4, introduce compressed air; within 60 s, observe and record whether there are bubbles escaping from the valve. For the valves with a core sleeve, observe and record whether there are bubbles escaping from the joints between the core sleeve and valve core, and the core sleeve and valve base. The entrained gas during the installation is not considered as a leak. 6.2 Sealing Performance Test of Valve and Valve Hole 6.2.1 Sealing performance test of valve and valve hole at room temperature The test is carried out after the rubber has been placed for over 24 h after vulcanization. At room temperature, use a special-purpose torque wrench to install Type H01 valve core that complies with GB 1796.6 in the core chamber of the test valve with a torque of 0.23 N  m ~ 0.34 N  m, then, in accordance with the assembly torque specified in GB 1796.4, install the valve on the simulated rim device shown in Figure 2 (when installing Type CN03C valve body, in order to ensure the reliability of the thread connection sealing, a suitable sealing medium shall be added to the thread pair). Immerse the simulated rim device in the water, make the mouth of the valve face upward; the distance between the sealing part of the valve rim and the liquid level shall not exceed 25 mm. Then, in accordance with the maximum operating pressure specified in GB 1796.4, introduce compressed air; within 60 s, observe and record whether there are bubbles escaping from the sealing part of the valve hole. The entrained gas during the installation is not considered as a leak. 6.2.2 Sealing performance test of valve and valve hole at low temperature 6.2.2.1 Put the valve that has passed the test in 6.2.1, together with the test device, into a low- temperature chamber at ( 40  3) C; under a pressure of (180  15) kPa, place them for 24 h. The entrained gas during the installation is not considered as a leak. 6.2.2.2 Under the constant pressure of (180  15) kPa, immerse the test device in ethanol or methanol at ( 40  3) C; make the mouth of the valve face upward; the distance between the sealing part of the valve rim and the liquid level shall not exceed 25 mm. Within 60 s, observe and record whether there are bubbles escaping from the sealing part of the valve hole. The entrained gas during the installation is not considered as a leak. 6.2.2.3 Increase the air pressure to (1,400  150) kPa. Within 60 s, observe and record whether there are bubbles escaping from the sealing part of the valve hole. The entrained gas during the installation is not considered as a leak. 6.2.3 Sealing performance test of valve and valve hole at high temperature 6.2.3.1 After the valve that has passed the test in 6.2.2 and the test device return to room temperature, put them together into the high-temperature test chamber at (100  3) C. Under the pressure of (1,400  150) kPa, place it for 72 h. The entrained gas during the installation is not considered as a leak. 6.2.3.2 Under the constant pressure of (1,400  150) kPa, immerse the valve, together with the test device, into clean water at (66  3) C. Make the mouth of the valve face upward; the distance between the sealing part of the valve rim and the liquid level shall not exceed 25 mm. Within 60 s, observe and record whether there are bubbles escaping from the sealing part of the valve hole. The entrained gas during the installation is not considered as a leak. 7 Assembly Torque Test In accordance with the torque of 1.6 times the maximum recommended installation torque specified in GB 1796.4, install the valve in the test plate hole that complies with the stipulations of Table 1. Then, immediately remove it; observe and record whether the valve body or the valve base manifests any cracking or screw loose. 8 Corrosion Resistance Test On a representative test rim made of steel or aluminum alloy, install the valve. In accordance with the stipulations of GB/T 10125-2012, conduct a 240 h neutral salt spray test. ......

BASIC DATA
Standard ID GB/T 9766.4-2016 (GB/T9766.4-2016)
Description (Translated English) Test methods for tyre valves -- Part 4: Test methods for tubeless clamp-in valves
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard G41
Classification of International Standard 83.160.01
Word Count Estimation 11,152
Date of Issue 2016-02-24
Date of Implementation 2017-01-01
Older Standard (superseded by this standard) GB/T 9766.4-2009
Drafting Organization Pallan (Anhui) Auto Parts Co., Ltd.; Anhui MSC Machinery Manufacturing Company Limited; Dongying City Yutong valve Ltd.
Administrative Organization National tire rim for Standardization Technical Committee (SAC/TC 19)
Regulation (derived from) National Standard Announcement No
Proposing organization China Petroleum and Chemical Industry Federation
Issuing agency(ies) Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China; Standardization Administration of China