HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (8 Sep 2024)

GB/T 41344.1-2022 related PDF English

GB/T 41344.1-2022 (GB/T41344.1-2022, GBT 41344.1-2022, GBT41344.1-2022) & related versions
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)See DetailStatusSimilar PDF
GB/T 41344.1-2022English260 Add to Cart 0-9 seconds. Auto delivery. Safety of machinery - Risk early-warning - Part 1: General requirements GB/T 41344.1-2022 Valid GBT 41344.1-2022
Buy with any currencies (Euro, JPY, KRW...): GB/T 41344.1-2022    Preview this PDF: GB/T 41344.1-2022



GB/T 41344.1-2022: PDF in English (GBT 41344.1-2022)
GB/T 41344.1-2022 NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 13.110 CCS J 09 Safety of machinery -- Risk early-warning -- Part 1: General requirements ISSUED ON: MARCH 9, 2022 IMPLEMENTED ON: OCTOBER 1, 2022 Issued by: State Administration for Market Regulation; Standardization Administration of PRC. Table of Contents Foreword ... 3 Introduction ... 5 1 Scope ... 7 2 Normative references ... 7 3 Terms and definitions ... 7 4 Basic principles ... 9 5 Basic requirements ... 9 6 Overview of risk early-warning ... 9 7 Risk assessment ... 13 8 Cost-benefit analysis ... 14 9 Early-warning monitoring ... 14 10 Early-warning systematics ... 16 11 Early-warning measures ... 17 Appendix A (Informative) Elements of risk early-warning and their relationships ... 18 Appendix B (Informative) Guidelines for the establishment of risk early-warning systems ... 19 References ... 21 Safety of machinery -- Risk early-warning -- Part 1: General requirements 1 Scope This document specifies the basic principles, basic requirements, risk early-warning process, early-warning monitoring, early-warning systematics, and early-warning measures of risk warning of machinery safety. This document applies to risk early-warning under the conditions of people, machines, the environment, and their combined effects. 2 Normative references The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) is applicable to this standard. GB/T 15706-2012 Safety of machinery -- General principles for design -- Risk assessment and risk reduction GB/T 16855.1 Safety of machinery -- Safety-related parts of control systems -- Part 1: General principles for design GB/T 30174-2013 Safety of machinery -- Terms GB/T 41344.2-2022 Safety of machinery -- Risk early-warning -- Part 2: Monitor GB/T 41344.3-2022 Safety of machinery -- Risk early-warning -- Part 3: Classification GB/T 41344.4-2022 Safety of machinery -- Risk early-warning -- Part 4: Measures 3 Terms and definitions The terms and definitions defined in GB/T 30174-2013 and the followings apply to this document. 3.1 Risk early-warning The process in which the dangerous state (3.9) that may be triggered by people, machines, the environment, and their combined effects is predicted and alarmed according to the levels, at the same time, the appropriate measures are timely taken to achieve a safe state (3.8). Note 1: Risk early-warning is generally achieved by establishing a risk early-warning system. Note 2: See Appendix A for risk early-warning elements and their relationships. 3.2 Risk early-warning system The system is composed of software and hardware, through the online data monitoring and evaluation of the elements such as people, machines, the environment, and their combined effects, it can predict the development trend of risks, and send out the alarm according to the level for the possible unsafe state, and take corresponding preventive measures in time to avoid the occurrence of dangerous states (3.9) to the greatest extent possible. 3.3 Risk value A numerical value obtained by the quantitative calculation method to characterize the severity of a risk. 3.4 Early-warning monitoring A process in which the information and operation data on elements such as people, machines, and the environment are collected through monitoring methods, operated, and analyzed; the outputs are used for calculating the risk values. 3.5 Level of early-warning The risk level classified according to the calculation result of the risk value. 3.6 Early-warning systematics The process of determining the warning level based on the risk value. 3.7 Early-warning measures The means and methods adopted according to the level of early-warning to reduce risks. 3.8 Safety status The situation in which the risks of personal injury, property damage, or damage to the working environment that may be caused by people, machines, the environment, and their combined effects are within an acceptable range. 8 Cost-benefit analysis Cost-benefit analysis helps to establish accurate key performance indices and benchmarks to measure the feasibility and effectiveness of any risk early-warning system. The main considered factors are: --- The cost of loss of personnel and machines due to risks; --- The cost of production loss; --- The cost of affected production efficiency; --- The whole life cycle cost of the risk early-warning system. 9 Early-warning monitoring Early-warning monitoring mainly includes the determination of monitoring variables, data collection, data manipulation, data analysis, data output, etc. The following contents need to be considered. a) Determination of monitoring variables. The monitoring variables mainly include the status information of people, the status information of machines, and the status information of the environment. The factors to be considered are: --- The main factors that generate the risk; --- The feasibility of technical realization; --- The economy of monitoring. b) Determination of measuring technique. There may be one or more measuring techniques that are applicable to a specific monitoring variable; the factors to be considered are: --- The total value of measuring the monitoring variables; --- The time average of measuring the monitoring variables; --- The time interval of measurement; --- Data collection rate; --- Monitoring method; --- Monitoring system; --- High sensitivity to changes in the status information of monitoring variables; --- Repeatability of the measurement; --- Installation method of the monitoring system; --- For the unmeasurable, alternative measures shall be adopted; --- Economy of the monitoring system. c) Determination of monitored area. The position where the output data of the status information of the monitoring variables are stable shall be selected as the monitored area; the factors that need to be considered are known as: --- Security; --- Selection of the sensors and their installation location; --- Reduction of the sensitivity to other influences; --- Signal attenuation or loss; --- Environment; --- Economy. d) The accurate judgment of the measurement values of the monitoring variables. The factors that need to be considered in the judgment of the accuracy of measurement parameters of risk early-warning monitoring variables for the safety of machinery are: --- The errors in a measuring system, such as poor sensor installation, sensor failure, signal line failure, etc.; --- The format of data output; --- Record of measured values; --- Unit of measured values; --- Date and time of measured values; --- Data processing method of measured values; --- Correction of measurement parameters of monitoring variables. The risk early-warning monitoring of the safety of machinery shall meet the requirements of GB/T 41344.2-2022. 10 Early-warning systematics Early-warning systematics mainly includes determination of risk value calculation model, weight determination, determination of the boundary of the early-warning level, calculation of risk value, the output of early-warning level, etc.; the followings need to be considered. a) Determination of calculation model of risk values. Comprehensively consider the three elements of people, machines, and the environment, and select the appropriate calculation model of risk values according to the actual needs. The factors that need to be considered in the model are as follows: --- Determination of element indices; --- People, machines, the environment, and their combined effects; --- Dynamics of element weights; --- Normalization of model calculation results. b) Weight determination. The weight of the element index represents the severity of the risk that may be generated by the element under the conditions of people, machines, the environment, and their combined effects; the factors that need to be considered are: --- Suitable weight determination method; --- Weight of people; --- Weight of Machines; --- Weight of the environment; --- Normalization of weight. c) Output of early-warning level. The output of the early-warning level is the input of the early-warning measure, and the factors that need to be considered are: --- The form of release; --- The object of release. The risk early-warning systematics of the safety of machinery shall meet the requirements of GB/T 41344.3-2022. Appendix B (Informative) Guidelines for the establishment of risk early-warning systems B.1 System composition The realization of risk early-warning of mechanical safety depends on the risk early- warning system. The risk early-warning system is aimed at industrial sites; it predicts the development trend of risks through online data monitoring and evaluation, issues warnings according to levels of possible unsafe conditions, and takes corresponding preventive measures in time to achieve the purpose of reducing risks. A risk early-warning system generally consists of an early-warning monitoring system, an early-warning classification system, and an early-warning measure system. The early-warning monitoring system mainly realizes the monitoring of risk elements; the early-warning classification system mainly determines the levels of risks according to the input values of the early-warning monitoring system; the early-warning measure system takes corresponding level measures according to the levels of risks. The risk early-warning systems mainly include permanent installation systems, semi- permanent systems, or portable systems according to the installation form. B.2 Establishment principles The establishment of a risk early-warning system should follow the following principles: --- The establishment of an early-warning monitoring system needs to be combined with the actual situation; the flexibility to different monitoring situations needs to be considered, and the main factors affecting the safety of machinery need to be grasped; --- About economy, mainly consider the criticality of machine operation, the cost of machine downtime, the cost of sudden failure of the machine, the cost of the machine, and the cost of the early-warning system to establish a suitable risk early-warning system; --- About operability, appropriate risk early-warning methods shall be adopted according to different situations of the enterprise, so that the risk early-warning is pertinent and operable; ......

BASIC DATA
Standard ID GB/T 41344.1-2022 (GB/T41344.1-2022)
Description (Translated English) Safety of machinery - Risk early-warning - Part 1: General requirements
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard J09
Classification of International Standard 13.110
Word Count Estimation 14,155
Date of Issue 2022-03-09
Date of Implementation 2022-10-01
Drafting Organization China National Machinery Productivity Promotion Center, Nanjing University of Science and Technology, Anhui Zhongzhike Standardization Research Institute Co., Ltd., Shenzhen Guoji Instrument Co., Ltd., Xiamen Jufu Plastic Products Co., Ltd., Nanjing Forestry University, Sichuan Highway and Bridge Construction Group Co., Ltd., Zhangzhou Zhongnan Nursing Products Co., Ltd., Jinhua Wonderful Commodity Co., Ltd., Guangdong Limai Testing Technology Co., Ltd., Pilz Electronics (Changzhou) Co., Ltd., Suzhou Aokun Intelligent Robot Technology Co., Ltd., Sichuan Shuxing Youchuang Safety Technology Co., Ltd., Suzhou Angao Intelligent Safety Technology Co., Ltd., Yalong River Basin Hydropower Development Co., Ltd., Jiangsu Special Equipment Safety Supervision and Inspection Research Institute, Suzhou Maiwei Technology Co., Ltd., Fujian Minxuan Technology Co., Ltd., Guangdong Qiangqiang Electromechanical Engineering Co., Ltd. Company, Lihong
Administrative Organization National Machinery Safety Standardization Technical Committee (SAC/TC 208)
Proposing organization National Machinery Safety Standardization Technical Committee (SAC/TC 208)
Issuing agency(ies) State Administration for Market Regulation, National Standardization Administration