HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (6 Oct 2024)

GB/T 13927-2022 related PDF English

GB/T 13927-2022 (GB/T13927-2022, GBT 13927-2022, GBT13927-2022) & related versions
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)See DetailStatusSimilar PDF
GB/T 13927-2022English215 Add to Cart 0-9 seconds. Auto delivery. Industrial valves -- Pressure testing GB/T 13927-2022 Valid GBT 13927-2022
GB/T 13927-2008English85 Add to Cart 0-9 seconds. Auto delivery. Industrial valves -- Pressure testing GB/T 13927-2008 Obsolete GBT 13927-2008
GB/T 13927-1992English359 Add to Cart 3 days Pressure testing for general purpose valves GB/T 13927-1992 Obsolete GBT 13927-1992
Buy with any currencies (Euro, JPY, KRW...): GB/T 13927-2022    Preview this PDF: GB/T 13927-2022



GB/T 13927-2022: PDF in English (GBT 13927-2022)
GB/T 13927-2022 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 23.060.01 CCS J 16 Replacing GB/T 13927-2008 Industrial valves - Pressure testing (ISO 5208:2015, Industrial valves – Pressure testing of metallic valves, MOD) ISSUED ON: DECEMBER 30, 2022 IMPLEMENTED ON: JULY 01, 2023 Issued by: State Administration for Market Regulation; Standardization Administration of PRC. Table of Contents Foreword ... 3 1 Scope ... 6 2 Normative references ... 6 3 Terms and definitions ... 6 4 Additional conditions for pressure test ... 8 4.1 Buyer inspection ... 8 4.2 Witness test ... 8 4.3 Test selection items ... 8 5 Pressure test requirements ... 8 5.1 Safety tips ... 8 5.2 Test location ... 9 5.3 Test equipment ... 9 5.4 Pressure measuring equipment ... 9 5.5 Valve shell surface ... 9 5.6 Test fluid ... 9 5.7 Test pressure ... 10 5.8 Pressure test items ... 10 5.9 Duration of test pressure ... 12 6 Test methods ... 12 6.1 Shell test ... 12 6.2 Back closure test ... 13 6.3 Sealing test ... 13 7 Test acceptance criteria ... 14 7.1 Shell test ... 14 7.2 Back closure test ... 15 7.3 Sealing test ... 15 7.4 Certificate of conformity ... 15 Appendix A (Informative) Comparison of structural number between this document and ISO 5208:2015 ... 16 Appendix B (Normative) Equivalent nominal size ... 18 Industrial valves - Pressure testing Warning: This document does not include all safety matters during the test. Personnel using this document shall be familiar with the test procedures AND have the responsibility to take appropriate safety and health measures and comply with national laws and regulations, especially during high-pressure gas tests. 1 Scope This document specifies pressure test additional conditions, pressure test requirements, test methods, test acceptance criteria for industrial valves. This document applies to pressure testing of metal valves. Note: The use of this document is specified by the valve product standard. Valves made of other materials can be implemented with reference to this standard. 2 Normative references This document has no normative references. 3 Terms and definitions The following terms and definitions apply to this document. 3.1 Shell test Test the valve shell according to the specified test fluid and test pressure. Note: Including the opening and closing drive mechanism, which is affected by the medium pressure of the valve itself and connected to the internal components of the valve. 3.2 Closure test The test on the tightness of the valve opening and closing part’s sealing pair, according to the specified test fluid and test pressure. 3.3 Back seal test 3.9 Double block-and-bleed valve A valve with two independent sealing pairs. When the valve is in the closed position, the medium, which is contained in the cavity between the two sealing pairs, can be cut off and sealed by the two sealing pairs, when the pressure in the cavity is relived. 3.10 Visually detectable leakage During valve pressure testing, leakage through the pressure boundary and seal pair, which can be observed by normal visual inspection. 4 Additional conditions for pressure test 4.1 Buyer inspection Where there is a requirement, in the order contract, to witness the inspection and testing of the valve in the manufacturing plant, the buyer's representative may enter the manufacturing plant for inspection. The valve manufacturer shall notify the buyer's representative 5 working days in advance OR as specified in the contract, based on the required test items. 4.2 Witness test If the buyer performs a pressure test on a stock valve, the stock valve may be tested, without removing paint or coating from the shell surface. 4.3 Test selection items When the order contract requires it, the test of the "optional" items in Table 1 can be carried out. 5 Pressure test requirements 5.1 Safety tips The pressure test, which is conducted in accordance with this document, requires an assessment of the safety of the pressure test of the gas or liquid medium, which is used for the test. 5.2 Test location The pressure test shall be carried out in the valve manufacturer OR at a test site, as witnessed by the valve manufacturer's personnel. 5.3 Test equipment The pressure test equipment shall not exert external forces, that would affect the valve test results. If an end pair clamping test device is used, the valve manufacturer shall be able to ensure that the test device does not affect the test results of the sealing performance of the valve being tested. 5.4 Pressure measuring equipment The accuracy of the measuring equipment, which is used to test pressure, shall not be lower than level 1.6; meanwhile it shall be calibrated and within the valid calibration verification period. 5.5 Valve shell surface 5.5.1 Before the shell pressure test, it is not allowed to paint the valve surface OR use other coatings that can prevent leakage. Pressure test is allowed, when the chemical anti-corrosion treatment without sealing effect AND when the lining of the lining valve exists. Lining materials or spray coatings that constitute the internal structure of the valve, such as plastic lining, thermal spray wear-resistant coating, spray epoxy resin coating. 5.5.2 When the buyer requires another pressure test, for valves that have been painted or used other coatings, it may not remove the lining material or spray coating. After the shell is anti-rust painted, it is allowed to perform pressure test, without removing the paint. 5.6 Test fluid 5.6.1 The liquid medium can be water (rust inhibitors are allowed to be added), kerosene or non-corrosive liquids, which have a viscosity no higher than water. When testing valves made of austenitic stainless steel, the chloride ion content in the water used shall not exceed 100 mg/L. 6.1.4 When testing the gas medium shell, drain the liquid in the body cavity. Seal the inlet and outlet of the valve. Partially open the valve. Fill the valve shell with the gas test medium. Gradually pressurize it to the test pressure specified in 5.7.1. Maintain the test pressure, according to the requirements of Table 2. Immerse the entire valve shell in the water, to make the upper surface of shell not more than 50 mm from the water surface. Observe whether there are continuous bubbles escaping from the water. It may also be observed by the method of spraying leak detection liquid on the outer surface of the shell. 6.2 Back closure test 6.2.1 For valves with an upper sealing structure, close the inlet and outlet of the valve. Fill the valve shell with liquid test medium. Drain the air in the valve body cavity. Use the valve operating mechanism, to open the valve to the fully open position. Loosen the packing gland bolts. 6.2.2 Gradually pressurize to the test pressure specified in 5.7.2. Maintain the test pressure, according to the requirements of Table 2. Observe the leakage at the valve stem packing. 6.3 Sealing test 6.3.1 General requirements 6.3.1.1 During the test, except for plug valves with oil seal structures, the sealing surfaces of valves with other structures shall be clean. 6.3.1.2 For valves with two sealing pairs and a middle cavity structure in the valve body and bonnet (such as gate valves, ball valves, plug valves, etc.), during the test, the middle cavity shall be filled with the medium at test pressure. 6.3.1.3 Except for check valves, for valves with specified medium flow direction marks, the test pressure shall be applied in the direction of the specified flow direction mark. 6.3.1.4 The test pressure shall be as specified in 5.7.3. 6.3.2 Closure test inspection The test methods and inspections of the main types of valves are as specified in Table 3. ......

BASIC DATA
Standard ID GB/T 13927-2022 (GB/T13927-2022)
Description (Translated English) Industrial valves -- Pressure testing
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard J16
Classification of International Standard 23.060.01
Word Count Estimation 14,181
Date of Issue 2022-12-30
Date of Implementation 2023-07-01
Older Standard (superseded by this standard) GB/T 13927-2008
Drafting Organization Hefei General Machinery Research Institute Co., Ltd., Hefei General Mechanical and Electrical Products Testing Institute Co., Ltd., Shenzhen Quality and Safety Inspection and Testing Research Institute, Chengdu Chenggao Valve Co., Ltd., Chaoda Valve Group Co., Ltd., Zhejiang Petrochemical Valve Co., Ltd., Jiangsu Suyan Valve Machinery Co., Ltd., Zhejiang Bethel Technology Co., Ltd., Yuanda Valve Group Co., Ltd., Jiangsu Shentong Valve Co., Ltd., Jiangsu Chenggong Valve Technology Co., Ltd., Anhui Tongdu Fluid Technology Co., Ltd., Kairuite Valve Industry Co., Ltd. Company, Baoyi Group Co., Ltd., Shanghai Guanlong Valve Energy-Saving Equipment Co., Ltd., Ningbo Jiekelong Seiko Co., Ltd., Shenjiang Valve Co., Ltd., Ningbo Amico Copper Valve Co., Ltd., Zhejiang Provincial Pump and Valve Product Quality Inspection Center, Zhejiang Yongyuan Valve Co., Ltd., four
Administrative Organization National Valve Standardization Technical Committee (SAC/TC 188)
Proposing organization State Administration for Market Regulation, National Standardization Management Committee