HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (6 Oct 2024)

GB 50261-2017 related PDF English

GB 50261-2017 (GB50261-2017) & related versions
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)See DetailStatusSimilar PDF
GB 50261-2017English245 Add to Cart 0-9 seconds. Auto delivery. Code for installation and commissioning of sprinkler systems GB 50261-2017 Valid GB 50261-2017
GB 50261-2005EnglishRFQ ASK 10 days Code for installation and commissioning of sprinkler systems GB 50261-2005 Obsolete GB 50261-2005
GB 50261-1996EnglishRFQ ASK 11 days Code for installation and commissioning of automatic fire-extinguishing sprinkler systems GB 50261-1996 Obsolete GB 50261-1996
Buy with any currencies (Euro, JPY, KRW...): GB 50261-2017    Preview this PDF: GB 50261-2017



GB 50261-2017: PDF in English
GB 50261-2017 NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA UDC Code for installation and commissioning of sprinkler systems ISSUED ON: MAY 27, 2017 IMPLEMENTED ON: JANUARY 01, 2018 Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China. Table of Contents Foreword ... 6 1 General provisions ... 8 2 Terminologies ... 9 3 Basic requirements ... 10 3.1 Quality management ... 10 3.2 Material and equipment management ... 11 4 Installation and construction of water supply facilities ... 16 4.1 General requirements ... 16 4.2 Installation of fire pump ... 16 4.3 Installation of fire tank and construction of fire reservoir ... 18 4.4 Installation of pressure fire water supply equipment and pressure maintenance pump ... 19 4.5 Installation of fire department connection ... 20 5 Installation of pipeline network and system components ... 23 5.1 Installation of pipeline network ... 23 5.2 Installation of sprinklers ... 32 5.3 Installation of alarm valve set ... 40 5.4 Installation of other system components ... 43 6 System pressure testing and flush washing ... 50 6.1 General requirements ... 50 6.2 Water pressure testing ... 52 6.3 Gas pressure testing ... 53 6.4 Flush washing ... 53 7 System commissioning ... 55 7.1 General requirements ... 55 7.2 Contents and requirements ... 55 8 System acceptance ... 59 9 Maintenance ... 66 Appendix A -- Classification for subprojects and subunits of sprinkler systems ... 70 Appendix B -- Construction site quality management inspection records ... 71 Appendix C -- Quality inspection records for sprinkler systems installation processes ... 72 Appendix D -- Inspection records for quality control documentation of sprinkler systems ... 76 Appendix E -- Records of acceptance for sprinkler system projects ... 78 Appendix F -- Classifications for deficiencies in sprinkler system acceptance ... 81 Appendix G -- Inspection items for maintenance and supervision of sprinkler systems ... 82 Explanation of wording in this Code ... 83 List of quoted standards ... 84 1 General provisions 1.0.1 This Code is formulated with view to ensuring the construction quality and use function of sprinkler system (hereinafter referred to as system), reducing fire hazard and protecting personal and property safety. 1.0.2 This Code is applicable to the construction, acceptance, maintenance and management of sprinkler system arranged in industrial and civil buildings. 1.0.3 The construction, acceptance, maintenance and management of sprinkler system shall not only meet those specified in this Code, shall also comply with the requirements of relevant national current standards and codes. 3 Basic requirements 3.1 Quality management 3.1.1 The subproject and subunit of sprinkler system shall be classified according to Appendix A. 3.1.2 Construction scheme for system construction shall be prepared according to the design requirements. Necessary technical standard for construction, sound construction quality management system and work quality inspection system shall be provided on construction site, and relevant records shall be filled in according to the requirements of Appendix B. 3.1.3 The following conditions shall be provided prior to sprinkler system construction: 1 The construction drawing shall be examined and approved or recorded before construction. Drawings such as plan drawing, system drawing (axonometric drawing and schematic diagram of development system) and detail drawing for construction as well as technical documents such as instructions, equipment list, material and equipment list shall be complete. 2 The design organization shall make technical disclosure to the construction, development and supervision organizations. 3 The system components and pipe fittings as well as other equipment and materials shall be able to ensure the normal construction. 4 The construction site and the water, electricity and gas used during construction shall meet the construction requirements and shall ensure continuous construction. 3.1.4 The construction of sprinkler system project shall be in accordance with the approved project design documents and technical standard for construction. 3.1.5 The construction process quality control of sprinkler system project shall be carried out in accordance with the following requirements: 1 As for the procedures, quality control shall be carried out according to technical standard for construction. After completion of each procedure, inspection shall be carried out, and the next procedure may be started only after passing such inspection. 2 Handing-over inspection shall be carried out among work types of various switch, water flow indicator, fire pump and pump adapter shall pass the testing by the National Quality Supervision and Inspection Center of Fire Products; the pressure maintenance pump, automatic exhaust valve, signal valve, multi- function pump control valve, check valve, relief valve, reducing valve, butterfly valve, gate valve, pressure gauge, etc. shall pass the testing of corresponding national product quality supervision and inspection center. Inspection quantity: 100 % inspection. Inspection method: inspecting relevant data. 3.2.2 Galvanized steel pipes and pipe fittings shall be subject to site appearance inspection, and shall meet the following requirements: 1 The galvanized steel pipe shall be hot-dip galvanized on both internal and external walls, and the galvanized layer on internal and external surfaces of steel pipe shall be free from phenomena like shedding and corrosion; both inside and outside diameters of steel pipe shall meet the requirements of the current national standard GB/ T 3091 Welded Steel Pipes for Low Pressure Liquid Delivery or GB/T 8163 Seamless Steel Tubes for Liquid Service. 2 The surface shall be free from crack, shrinkage cavity, slag inclusion, fold and double skin. 3 The sealing face of thread shall be complete and free from damage and burr. 4 The non-metallic sealing gasket shall have flexible texture, and be free from aging deterioration or layering, and its surface shall be free from defects like depreciation and wrinkle. 5 The flange sealing face shall be complete, smooth and clean and shall be free from burrs and radial groove; the thread of threaded flange shall be complete without damage. Inspection quantity: 100 % inspection. Inspection method: observing and inspecting with ruler. 3.2.3 Stainless steel pipes and pipe fittings shall be subject to site appearance inspection, and shall meet the following requirements: 1 Both the inside and outside diameters of stainless steel pipe shall meet the requirements of the current national standard GB/T 12771 Welded Stainless Steel Pipes for Liquid Delivery or GB/T 19228.2 Stainless Steel Press-fitting Assemblies - Part 2: Light Gauge Stainless Steel Tubes for Press-fittings. 2 The surface shall be free of crack and damage. 5 Pipes and pipe fittings shall be light-tight. Inspection quantity: 100 % inspection. Inspection method: observing and inspecting with ruler. 3.2.7 Site inspection of sprinkler must comply with the following requirements: 1 Marks such as the trademark, type, nominal operating temperature, response time index (RTI), manufacturer and production date of sprinkler shall be complete. 2 Type, specification, etc. of sprinkler shall meet the design requirements. 3 The sprinkler appearance shall be free of processing defect and mechanical damage. 4 The sealing face of sprinkler thread shall be free from scar, burr, wire shortage or break. 5 Close-type sprinkler shall be subject to sealing performance test, and that without leakage and damage shall be regarded as acceptable. Test quantity shall be 1 % from each batch through random sampling, and shall not be less than 5; the test pressure shall be 3.0 MPa, and the pressure holding time shall not be less than 3 min. Where two or more pieces are rejected, sprinklers of this batch cannot be used. Where there is only one piece rejected, 2 % (not less than 10 pieces) shall be randomly taken for sealing performance test; if there are still rejected ones, sprinklers of this batch shall not be used. Inspection quantity: complying with Item 5 of this clause. Inspection method: observing and testing on special test device; the main testing equipment includes pressure test pump, pressure gauge and stopwatch. 3.2.8 Site inspection of valve and its accessories shall meet the following requirements: 1 The marks like trademark, type and specification of valve shall be complete, and the type and specification of valve shall meet the design requirements. 2 The valve and its accessories shall be complete and free from processing defect and mechanical damage. 3 In addition to such marks as trademark, type and specification, the alarm valve shall also be provided with permanent mark of flow direction. 4 The disc and operating mechanism of alarm valve and control valve shall be 4 Installation and construction of water supply facilities 4.1 General requirements 4.1.1 As for installation of such water supply facilities as fire pump, fire tank, fire reservoir, pressure fire water supply equipment and fire department connection as well as their auxiliary pipelines, the dirt and sundries inside shall be cleaned. In case that the installation is interrupted, the opening shall be sealed. 4.1.2 Safe and reliable protective measures shall be taken for the fire water supply facility, and the installation position shall be convenient for the routine operation, maintenance and management. 4.1.3 Where fire water pipe is directly connected with municipal water supply pipe and domestic water supply pipe, the connection shall be equipped with backflow preventer. 4.1.4 During installation of water supply facility, the ambient temperature shall not be lower than 5 °C; anti-freezing measures shall be taken where the ambient temperature is lower than 5 °C. 4.2 Installation of fire pump Dominant item 4.2.1 The specification and type of fire pump shall meet the design requirements and shall be provided with product qualification certificate and installation and operation instruction. Inspection quantity: 100 % inspection. Inspection method: observing according to drawing. 4.2.2 Installation of fire pump shall meet the requirements of the current national standards GB 50231 General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering and GB 50275 Code for Construction and Acceptance of Computer, Fan and Pump Installation Engineering. Inspection quantity: 100 % inspection. Inspection method: inspecting with ruler and observing. 4.2.3 Installation of inlet pipe and its fittings shall meet the following requirements: Inspection quantity: 100 % inspection. Inspection method: observing. 4.3 Installation of fire tank and construction of fire reservoir I Dominant item 4.3.1 Construction and installation of fire reservoir and fire tank shall meet the requirements of the current national standards GB 50141 Code for Construction and Acceptance of Water and Sewerage Structures and GB 50242 Code for Acceptance of Construction Quality of Water Supply Drainage and Heating Works. Arrangement mode and position of water level display device of fire reservoir and elevated fire tank shall meet the requirements of the design document. Inspection quantity: 100 % inspection. Inspection method: inspecting with ruler and observing. 4.3.2 Water-proof sleeve shall be arranged on the inlet and outlet pipes of reinforced concrete fire reservoir or fire tank, and flexible joint shall be arranged for pipeline with vibration. The inlet and outlet pipe joints of combined fire reservoir or fire tank should be connected with flange; in case that other connection is adopted, rust-proof treatment shall be carried out. Inspection quantity: 100 % inspection. Inspection method: observing. II General item 4.3.3 The volume and installation position of elevated fire tank and fire reservoir shall meet the design requirements. During installation, the clear distance between the external wall of the reservoir (tank) and the wall surface of building structure or other reservoir wall shall meet the requirements of construction or assembly. The clear distance on the side surface without pipeline should not be less than 0.7 m while that on the side surface with pipeline should not be less than 1.0 m; the width of passage between external wall of pipeline and wall surface of building should not be less than 0.6 m; for the reservoir top with manhole, the clearance between top slab surface and the upper building slab bottom shall not be less than 0.8 m; the distance from assembled elevated fire tank bottom to the floor should not be less than 0.5 m. Inspection quantity: 100 % inspection. Inspection method: inspecting with ruler according to drawing. Inspection quantity: 100 % inspection. Inspection method: observing according to drawing. 4.4.2 The installation position as well as the directions of inlet pipe and outlet pipe of pressure fire water supply equipment shall meet the design requirements; check valve shall be installed for outlet pipe with an overhaul passage, which should not be less than 0.7 m in width, arranged around it; the distance from the top of pressure fire water supply equipment to the floor slab or beam bottom should not be less than 0.6 m. Inspection quantity: 100 % inspection. Inspection method: inspecting with ruler and observing according to drawing. II General item 4.4.3 Installation of safety valve, pressure gauge, drain pipe, water level indicator and pressure control instrument etc. on pressure fire water supply equipment shall meet the requirements of product instructions. Inspection quantity: 100 % inspection. Inspection method: observing according to drawing. 4.4.4 The specification and type of pressure maintenance pump shall meet the design requirements; product certificate and installation and operation instructions shall be provided. Inspection quantity: 100 % inspection. Inspection method: observing according to drawing. 4.4.5 The installation of pressure maintenance pump shall meet the relevant requirements of the current national standards GB 50231 General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering and GB 50275 Code for Construction and Acceptance of Fan, Compressor and Pump Installation. Inspection quantity: 100 % inspection. Inspection method: inspecting with ruler and observing. 4.5 Installation of fire department connection I Dominant item 4.5.1 Assembly-type fire department connection shall be installed in the 5 Installation of pipeline network and system components 5.1 Installation of pipeline network I Dominant item 5.1.1 Where steel pipes are adopted for pipeline network, the material shall meet the requirements of the current national standards GB/T 8163 Seamless Steel Tubes for Liquid Service and GB/T 3091 Welded Steel Pipes for Low Pressure Liquid Delivery. Inspection quantity: 100 % inspection. Inspection method: checking material quality qualification document and performance detection report, inspecting with ruler and observing. 5.1.2 Where stainless steel pipes are adopted for pipeline network, the material shall meet the requirements of the current national standards GB/T 12771 Welded Stainless Steel Pipes for Liquid Delivery and GB/T 19228.2 Light Gauge Stainless Steel Pipes for Stainless Steel Press-fittings. Inspection quantity: 100 % inspection. Inspection method: checking material quality qualification document and performance detection report, inspecting with ruler and observing. 5.1.3 Where copper pipelines are adopted for pipeline network, the material shall meet the requirements of the current national standards GB/T 18033 Seamless Copper Tubes for Water and Gas, GB/T 11618.1 Pipe Fittings of Copper and Copper Alloys - Part 1: Fittings of Braze Welding Type and GB/T 11618.2 Pipe Fittings of Copper and Copper Alloys - Part 2: Fittings of Press Type. Inspection quantity: 100 % inspection. Inspection method: checking material quality qualification document and performance detection report, inspecting with ruler and observing. 5.1.4 Where coating steel pipes are adopted for pipeline network, the material shall meet the requirements of the current national standard GB 5135.20 Automatic Sprinkler System - Part 20: Coating Steel Pipe. Inspection method: observing and inspecting with level ruler. 5.1.11 Connection of grooved pipe fittings shall meet the following requirements: 1 The selected grooved pipe fittings shall meet the requirements of the current national standard GB 5135.11 Automatic Sprinkler System - Part 11: Grooved Couplings and Fittings, the material shall be ductile cast iron and shall meet the requirements of the current national standard GB/T 1348 Spheroidal Graphite Iron Castings; the material of rubber sealing ring shall be EPDM (ethylene propylene diene monomer) and meet the requirements of ISO 6182-12 Performance Requirements and Test Methods for Quick Coupling of Metal Pipeline System. 2 During connection of grooved pipe fittings, the groove and opening for pipeline connection shall be processed with special channeling machine and tapping machine, and corrosion-proof treatment shall be conducted; before connection, groove and hole dimension shall be inspected and processing quality shall meet the technical requirements; groove and hole shall be free from any burr, damaging crack and dirt. Inspection quantity: randomly inspecting 20 % and not less than 5. Inspection method: observing and inspecting with ruler. 3 Rubber sealing ring shall be free from damage and deformation. Inspection quantity: randomly inspecting 20 % and not less than 5. Inspection method: observing. 4 After the convex edge of grooved pipe fitting is clipped into the groove, the bolt shall be fastened, both sides shall be simultaneously fixed; in case of any wrinkled rubber ring, it shall be replaced by a new one. Inspection quantity: randomly inspecting 20 % and not less than 5. Inspection method: observing. 5 Where mechanical tee connection is adopted, the clearance between mechanical tee and hole shall be inspected; each part shall be uniform and fixed to the right position; the hole spacing of mechanical tee shall not be less than 500 mm and that of mechanical cross shall not be less than 1000 mm; where mechanical tee and cross are connected, the aperture of branch pipe shall meet those specified in Table 5.1.11. Table 5.1.11 -- Maximum permissible diameter of branch pipe used for connection (mechanical tee and mechanical cross) (mm) 2 It shall not be supported on joint. Inspection quantity: randomly inspecting 20 % and not less than 5. Inspection method: inspecting with ruler. 2 The type, material, processing dimension and welding quality of pipeline support, hanger and restraining rack shall meet the design requirements and the requirements of relevant current national standard. 3 The installation positions of pipeline support and hanger shall not interfere with the sprinkling effect of sprinkler; the distance between pipeline support/hanger and sprinkler should not be less than 300 mm and that between pipeline support/hanger and end sprinkler should not be greater than 750 mm. Inspection quantity: randomly inspecting 20 % and not less than 5. Inspection method: inspecting with ruler. 4 The quantity of hanger set on each straight pipe section of distributing branch and pipe section between two adjacent sprinklers should not be less than 1, and the spacing between hangers should not be greater than 3.6 m. Inspection quantity: randomly inspecting 20 % and not less than 5. Inspection method: observing and inspecting with ruler. 5 Where the nominal diameter of pipeline is greater than or equal to 50 mm, the quantity of restraining racks set on each section of distributing main and distributing pipe shall not be less than 1 and the spacing between restraining racks should not be greater than 15 m; where the direction of pipeline changes, restraining rack shall be added. Inspection quantity: 100 % inspection. Inspection method: observing and inspecting with ruler. 6 As for distributing main installed vertically, it shall be fixed with pipe clamp at the center, restraining racks shall be arranged at its initial and terminal ends or its initial and terminal ends shall be fixed with pipe clamp; the distance from installation position to the ground or the floor should be 1.5 ~ 1.8 m. Inspection quantity: 100 % inspection. Inspection method: observing and inspecting with ruler. 5.1.16 Anti-deformation measures shall be taken if pipeline passes through the deformation joint of building. Where the pipeline passes through wall or floor steel pipe and copper pipe and chlorinated polyvinyl chloride (PVC-C) pipe. 5.1.21 Installation of stainless steel pipe shall meet the following relevant requirements: 1 Where thin-walled stainless steel pipe is connected with other pipes, pipe fittings and accessories, measures shall be taken to avoid electrochemical corrosion. 2 Where the thin-wall stainless steel pipeline with nominal diameter of DN25 ~ 50 is connected with other pipelines, special thread switching connector (such as GTHY or entrapment stainless steel pipe) shall be adopted for connection. 3 Where the thin-wall stainless steel pipeline with nominal diameter of DN65 ~ 100 is connected with other pipelines, special flange switching connector should be adopted for connection. 4 Where the thin-wall stainless steel pipeline with nominal diameter DN greater than or equal to 125 is connected with other pipelines, grooved pipe fitting connection or flange connection should be adopted. 5.1.22 Installation of copper pipe shall meet the following relevant requirements: 1 Braze welding may be used for connection between copper pipe and pipe fittings in various specifications; as for the copper pipe with diameter not greater than DN50 and required to be dismantled, ferrule connection may be adopted; as for the copper pipe with diameter not greater than DN50, entrapment connection may be adopted; as for the copper pipe with diameter not less than DN50, grooved connection may be adopted. 2 Copper alloy products should be adopted for pipeline supporting elements. Where steel support is adopted, soft isolation pad shall be arranged between pipeline and support which shall not generate corrosion on pipeline. 3 Where groove connector is non-copper material, necessary corrosion-proof measures shall be taken for its contact surface. 5.1.23 Installation of chlorinated polyvinyl chloride (PVC-C) pipeline shall meet the following relevant requirements: 1 Socket and spigot type bonding connection shall be adopted between chlorinated polyvinyl chloride (PVC-C) pipes and pipe fittings; butt connection of chlorinated polyvinyl chloride (PVC-C) flange and flange of other material shall be adopted among chlorinated polyvinyl chloride (PVC-C) pipes and flanged pipeline, valve and pipe fittings; threaded connection of injection molding pipe fittings of thread coupling shall be adopted among chlorinated polyvinyl chloride (PVC-C) pipes and threaded pipeline, valve and pipe fittings; decorative coating for the decoration cover plate of sprinkler and concealed sprinkler. Inspection quantity: 100 % inspection. Inspection method: observing. 5.2.3 For installation of sprinklers, special spanner shall be adopted, and the frame of sprinkler is strictly forbidden for tightening; in case of any deformation of sprinkler frame and splash box or damage of relief element, the sprinkler shall be replaced by another one of the same specifications and type. Inspection quantity: 100 % inspection. Inspection method: observing. 5.2.4 The sprinkler installed in the place prone to mechanical damage, sprinkler guards and shields shall be arranged. Inspection quantity: 100 % inspection. Inspection method: observing. 5.2.5 In installation of sprinklers, the distance from splash box to ceiling, door, window, opening or obstacle shall meet the design requirements. Inspection quantity: randomly inspecting 20 % and not less than 5. Inspection method: inspecting with ruler according to drawing. 5.2.6 Before installation, the type, specification and operating site of sprinkler shall be inspected and meet the design requirements. Where concealed sprinkler is adopted for the system, the elevation of distributing branch and opening dimension of ceiling shall be exactly controlled. Inspection quantity: 100 % inspection. Inspection method: observing according to drawing. II General item 5.2.7 Where nominal diameter of sprinkler is less than 10 mm, filter shall be installed on distributing mains or distributing pipes. Inspection quantity: 100 % inspection. Inspection method: observing. with alarm valve set shall be provided with a drainage facility, of which drainage capacity shall meet the requirements of alarm valve commissioning, acceptance and emptying system pipeline by water test valve. Inspection quantity: 100 % inspection. Inspection method: inspecting records of system pressure testing and flush washing, observing and inspecting with ruler. 5.3.2 Installation of alarm valve set accessories shall meet the following requirements: 1 Pressure gage shall be installed in the position on alarm valve convenient for observation. Inspection quantity: 100 % inspection. Inspection method: observing. 2 Drainage pipe and test valve shall be installed in the position convenient for operation. Inspection quantity: 100 % inspection. Inspection method: observing. 3 Water supply control valve shall be installed to be convenient for operation, and shall be provided with visible opening/closing mark and reliable locking facilities. Inspection quantity: 100 % inspection. Inspection method: observing. 5.3.3 Installation of wet alarm valve set shall meet the following requirements: 1 Pipelines in front of and behind the alarm valve shall be filled with water smoothly; in case of pressure fluctuation, water powered alarm shall be free from false alarm. Inspection quantity: 100 % inspection. Inspection method: observing and opening valves for water release at the flow rate less than a sprinkler. 2 Filter on alarm flow path shall be installed in the position in front of retarder convenient for slagging operation. (3) Accelerator. Inspection quantity: 100 % inspection. In...... ......

BASIC DATA
Standard ID GB 50261-2017 (GB50261-2017)
Description (Translated English) Code for installation and commissioning of sprinkler systems
Sector / Industry National Standard
Classification of Chinese Standard P16
Word Count Estimation 145,110
Date of Issue 2017-05-27
Date of Implementation 2018-01-01
Older Standard (superseded by this standard) GB 50261-2005
Regulation (derived from) Housing and Urban-Rural Development Bulletin 2017 No. 1577