|
US$169.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. SN/T 2375-2009: Code of biosafety insectray Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| SN/T 2375-2009 | English | 169 |
Add to Cart
|
3 days [Need to translate]
|
Code of biosafety insectray
| Valid |
SN/T 2375-2009
|
PDF similar to SN/T 2375-2009
Standard similar to SN/T 2375-2009 WS/T 655 GB 18469 SN/T 5800.3
Basic data | Standard ID | SN/T 2375-2009 (SN/T2375-2009) | | Description (Translated English) | Code of biosafety insectray | | Sector / Industry | Commodity Inspection Standard (Recommended) | | Classification of Chinese Standard | C00 | | Classification of International Standard | 03.100 | | Word Count Estimation | 6,689 | | Date of Issue | 2009-09-02 | | Date of Implementation | 2010-03-16 | | Regulation (derived from) | Entry-Exit Inspection and Quarantine circular industry standards (2009. 09. 02) | | Issuing agency(ies) | General Administration of Customs | | Summary | This standard specifies the breeding room biosafety protection basic requirements, building requirements, operational requirements and management requirements. This standard applies to the entry of terrestrial arthropods feeding. |
SN/T 2375-2009: Code of biosafety insectray---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Code of biosafety insectray
Exit inspection and quarantine industry standard book People's Republic of China
Biosafety guidelines for rearing room
Posted 2009-09-02
2010-03-16 implementation
People's Republic of China
The State Administration of Quality Supervision, Inspection and Quarantine released
Foreword
This standard is proposed and managed by the National Certification and Accreditation Administration Committee.
This standard by the People's Republic of China Guangxi Exit Inspection and Quarantine is responsible for drafting.
The main drafters of this standard. Wang Zhan Jun, Li Weifeng, Li Shuqing, Moqiao Lin, Zhao on behalf of the dragon, Jiangqi Fu.
This is the first issue
Entry-exit inspection and quarantine industry standards.
Biosafety guidelines for rearing room
1 Scope
This standard specifies the breeding room biosafety protection basic requirements, building requirements, operational and administrative requirements.
This standard applies to the entry of terrestrial arthropod rearing.
2 Terms and definitions
The following terms and definitions apply to this standard.
2.1
Entry for terrestrial arthropod rearing facilities.
2.2
Animal Taxonomy Arthropoda terrestrial invertebrates, such as insects, ticks and mites.
2.3
Keeping room staff in feeding arthropods, in order to ensure keeping the object does not cause biological harm to humans and animals, making sure that the environment is not
To influence in the breeding room design and construction, personal protective equipment, standardization of work procedures and operational procedures and other aspects taken comprehensive
Protective measures.
2.4
Avoid the risk of laboratory personnel injury caused by biological factors, outside the laboratory to spread and cause harm to the comprehensive measures.
2.5
Designed to prevent individuals being harmful chemical and biological factors damage equipment and supplies.
2.6
Provided in the cleaning and working area adjacent buffer zone between the two closed chamber, which has two doors interlock function and can not be simultaneously in the open
status.
3 basic requirements of protection keeping room
3.1 breeding room includes protection of breeding room siting, design and construction, safety equipment, personal protective equipment and measures, standardized operating
Procedures and regulations and strict management system.
3.2 In addition to breeding room should take appropriate measures to prevent arthropod escape, but also to prevent arthropod rearing room staff injuries.
3.3 breeding room should formulate a comprehensive bio-security measures, the preparation of bio-safety management manual feeding chamber, and a person responsible for biological
Security.
4 breeding room building requirements
4.1 Layout
4.1.1 Location feeding chamber design and construction should consider the impact on the surrounding environment and the surrounding environment may cause them insecurity
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of SN/T 2375-2009_English be delivered?Answer: Upon your order, we will start to translate SN/T 2375-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of SN/T 2375-2009_English with my colleagues?Answer: Yes. The purchased PDF of SN/T 2375-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|