QC/T 945-2013 PDF English
US$135.00 · In stock · Download in 9 secondsQC/T 945-2013: Passenger vehicle air-conditioning unit Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
QC/T 945-2013 | English | 135 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Passenger vehicle air-conditioning unit
| Valid |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: QC/T 945-2013
QC/T 945-2013: Passenger vehicle air-conditioning unit---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/QCT945-2013
QC
NATIONAL AUTOMOBILE STANDARD
OF THE PEOPLE’S REPUBLIC OF CHINA
ICS 43.040.60
T 26
Passenger vehicle air conditioning unit
ISSUED ON: OCTOBER 17, 2013
IMPLEMENTED ON: MARCH 01, 2014
Issued by: Ministry of Industry and Information Technology of the People's
Republic of China
Passenger vehicle air conditioning unit
1 Scope
This Standard specifies the requirements, test methods, inspection rules, marking,
packaging, transportation and storage requirements for passenger vehicle air
conditioning units using HFC-134a as refrigerant.
This Standard applies to the production, testing and inspection of passenger vehicle air
conditioning units.
2 Normative references
The following referenced documents are indispensable for the application of this
document. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
GB/T 191-2008, Packaging and storage marks
GB 4706.32, Safety of household and similar electrical appliances - Part 32:
Particular requirements for electrical heat pumps, air-conditioners and
dehumidifiers (IEC 60335-2-40:1995, IDT)
GB 5226.1, Electrical safety of machinery -- Electrical equipment of machines --
Part 1: General requirements (IEC 60204-1:2000, IDT)
GB 8410, Flammability of automotive interior materials
GB/T 10125, Corrosion tests in artificial atmospheres -- Salt spray tests
GB 11555, Motor vehicles-windshield demisting and defrosting systems --
Performance requirements and test methods
GB/T 12782-2007, Requirement and test method of heating performance for motor
vehicle
GB/T 21361-2008, Motor vehicle air conditioning unit
QC/T 657, Automotive air conditioning and refrigeration unit test method
QC/T 658, Air conditioning refrigeration system performances road test method for
motor vehicles
QC/T 664, Automotive air conditioning refrigerant hose
3 Terms and definitions
For the purposes of this document, the terms and definitions defined in GB/T 21361-
2008 as well as the followings apply.
3.1 heating, ventilation and air conditioning assembly
It is composed of a blower, evaporator, heater core and air door control mechanism. It
regulates the temperature of the air delivered to the vehicle and controls the air intake,
air supply mode and air volume.
3.2 air enthalpy difference
A method for determining the heat exchange capacity of an air conditioning unit. By
measuring the air inlet parameters, air outlet parameters and air volume of the air
conditioning unit, the heat exchange capacity of the air conditioning unit is determined
by multiplying the specific melting difference between the inlet and outlet air by the air
volume.
4 Requirements
4.1 General requirements
4.1.1 Manufacturing
Air conditioning units shall comply with the provisions of this Standard and be
manufactured according to drawings and technical documents approved through
prescribed procedures.
4.1.2 Appearance and installation dimensions
The appearance of the product shall be flat and smooth without dents or scratches. The
installation dimensions shall comply with the requirements of the drawings.
4.1.3 Requirements for parts, components and materials
All parts, components and materials in the air conditioning unit shall comply with the
relevant standards, meet the performance requirements and ensure safety. The
combustion characteristics of interior materials shall meet the requirements of GB 8410.
The selection and installation of electrical components shall comply with the
requirements of GB 4706.32 and GB 5226.1.
4.1.4 Refrigerant filling
Refrigerant filling shall be carried out quantitatively on the automobile factory
assembly line according to the design requirements. When filling, the system must be
evacuated to an absolute pressure of less than 500 Pa. The quantitative filling device
shall pass the metrological verification. The accuracy of the device shall not be less
than ± 15 g.
4.2 Thermal performance
4.2.1 Refrigeration performance
The cooling capacity and air volume of the air conditioning unit shall meet the design
requirements. The energy efficiency ratio shall be greater than 2.1 W/W.
4.2.2 Heating performance
The heating capacity and air volume of the air conditioning unit shall meet the design
requirements.
4.3 Environment simulation test
The air conditioning unit is installed on the vehicle according to the design requirements
and subjected to environment simulation tests. The test results of its temperature rise
and temperature drop performance shall meet the design requirements.
4.4 Defrosting and defogging performance
The defrosting and defogging performance shall comply with the requirements of
standard GB 11555.
4.5 Heating, ventilation and air conditioning assembly
4.5.1 Power-on performance
4.5.1.1 For heating, ventilation and air conditioning assembly without speed regulating
devices, the minimum starting voltage of the blower assembly shall meet the design
requirements. After the assembly is powered on, it shall run smoothly without
scratching or abnormal noise.
4.5.1.2 For heating, ventilation and air conditioning assembly with speed control
devices, the blower assembly shall have clear gears after power is turned on. Each wind
speed shall run smoothly without scratching or abnormal noise.
4.5.1.3 The blower assembly shall be able to operate normally at rated voltage. The
current shall meet the design requirements.
4.5.1.4 The damper drive motor assembly shall run smoothly when the terminal voltage
is 70% of the rated voltage. The damper shall not shake, make scraping sounds, creaking
sounds or similar sounds, and shall be able to reach the designated position smoothly.
The adjustment time shall meet the design requirements.
4.5.2 Impedance of thermistor
conditioning assembly shall be able to operate normally when powered on; the damper
can operate normally; the assembly has no deformation or damage and meets the
requirements of 4.5.7 of this Standard.
4.5.11 Water content
The total water content in the evaporator core shall not exceed 30 mg.
4.5.12 Residual impurities content
The total weight of residual impurities in the evaporator core shall not exceed 20 mg.
The maximum particle diameter shall not exceed 0.2 mm.
4.5.13 Burst pressure
The minimum hydraulic bursting pressure of the evaporator core is 2.8 MPa (gauge
pressure). No permanent deformation shall occur when the pressure reaches 1.4 MPa
(gauge pressure).
4.6 Condenser assembly
4.6.1 Airtight performance
The leakage of HFC-134a of the condenser core assembly at 0.7 MPa shall not exceed
2 g/a.
4.6.2 Vibration resistance
After the product has completed the vibration resistance test as required, it shall comply
with the requirements of 4.6.1 of this Standard.
4.6.3 Corrosion resistance
After the assembly is subjected to a 168h neutral salt spray test in accordance with
standard GB/T 10125, there shall be no bubbling, paint peeling or surface pitting on the
outer surface of the metal parts. Its air tightness shall still meet the requirements of 4.6.1
of this Standard.
4.6.4 Water content
The residual water content in the condenser core cavity shall not exceed 30 mg.
4.6.5 Residual impurities content
The residual impurity content in the inner cavity of the condenser core shall not exceed
20 mg. The maximum particle diameter shall not exceed 0.2 mm.
4.6.6 Burst pressure
The minimum hydraulic bursting pressure of the condenser core shall be able to reach
9 MPa (gauge pressure).
4.7 Pipeline assembly
4.7.1 Residual impurities content
The impurity content inside the pipeline assembly shall not exceed 250 mg/m2. The
maximum particle diameter shall not exceed 0.2 mm.
4.7.2 Airtight performance
The pipeline assembly shall be able to withstand an air pressure of 3.53 MPa (gauge
pressure) and remain leak-free in water for 3 min.
4.7.3 Burst pressure
The minimum burst pressure of the pipeline is 12 MPa.
4.7.4 Pulse pressure cycle resistance
The pressure applied in the pipeline is (0~3.53) MPa. After 150000 cycles of testing,
the pipeline shall be able to meet the requirements of 4.7.2 of this Standard.
4.7.5 Corrosion resistance
After the corrosion resistance test is completed, the pipeline shall be able to meet the
requirements of 4.7.2 of this Standard.
4.7.6 Vibration resistance
After the vibration resistance test, the pipeline shall not have any abnormal deformation
or breakage and meet the requirements of 4.7.2 of this Standard.
4.7.7 Hose assembly
Other properties of the hose assembly shall comply with the requirements of QC/T 664.
5 Test methods
5.1 Appearance, installation dimensions and materials
5.1.1 Appearance and installation dimensions
The appearance shall be visually inspected. The installation dimensions shall be
measured using universal measuring tools. The results shall meet the requirements of
4.1.2 of this Standard.
e) Blower terminal voltage: rated voltage of the vehicle;
f) Air door conditions of heating, ventilation and air conditioning assembly: full
heating, external circulation, foot blowing.
5.2.3 Tests
The air conditioning unit is installed on the air enthalpy difference automobile air
conditioning special performance test device. Adjust the test bench parameters. Perform
the measurement according to the requirements of QC/T 657. The results shall meet the
requirements of 4.2 of this Standard.
5.3 Environment simulation test
The heating shall be carried out in accordance with the provisions of GB/T 12782-2007.
The cooling shall be carried out in accordance with the provisions of QC/T 658. The
results shall meet the requirements of 4.3 of this Standard.
5.4 Defrosting and defogging performance
Carry out in accordance with the provisions of GB 11555. The test results shall meet
the requirements of 4.4 of this Standard.
5.5 Heating, ventilation and air conditioning assembly
5.5.1 Power-on performance
Connect the heating, ventilation and air conditioning assembly to the test device.
After all the circuits are connected, first provide the minimum starting voltage required
by the design to the pins, and then provide the rated voltage. The blower impeller shall
be able to start rotating at the minimum starting voltage. The assembly shall be able to
operate normally at the rated voltage. Feel whether the air volume of each gear changes
significantly. Listen carefully for any abnormal sound during operation. At the same
time, use a stopwatch to record the adjustment time. The test results shall meet the
requirements of 4.5.1 of this Standard.
5.5.2 Impedance of thermistor
After the heating, ventilation and air conditioning assembly is assembled, when the
ambient temperature t≥0°C, use a multimeter to check the impedance at the current
temperature. The result shall meet the requirements of 4.5.2 of this Standard.
5.5.3 Thermal insulation performance of the shell
5.5.3.1 Test phase 1: Fix the heating, ventilation and air conditioning assembly on the
air enthalpy difference test bench according to the actual vehicle installation status. Test
for 1 h under the following conditions. Visually check whether there are any water
droplets on the surface of the assembly:
a) Air dry bulb temperature at the blower inlet: 27°C±1°C, wet bulb temperature:
19.5°C±0.5°C;
b) Evaporator outlet pressure: 0.179 MPa (gauge pressure) ±0.01 MPa;
c) Expansion valve inlet pressure: 1.636 MPa (gauge pressure) ±0.02 MPa;
d) Refrigerant: HFC-134a; Subcooling: 5°C;
e) Blower terminal voltage: vehicle rated voltage;
f) Air door conditions: internal circulation, full cooling, blowing on face.
5.5.3.2 Test phase 2: Continue to adjust the air volume to the minimum setting required
by the design. After running for 1 h, visually inspect whether there are water drops on
the surface of the assembly. The results shall meet the requirements of 4.5.3 of this
Standard.
5.5.4 Shell sealing performance
Fix the heating, ventilation and air conditioning assembly on the test stand according to
the in-vehicle installation method. Connect the air inlet of the blower to the test device.
Air door position: internal circulation, blowing face, full cooling. Make sure all air (face,
face and defrost) are sealed intact. Maintain the specified pressure in the shell and
record the amount of air that leaks out of the shell as displayed by the instrument. The
results shall meet the requirements of 4.5.4 of this Standard.
5.5.5 Operating torque
5.5.5.1 Fix the air conditioning unit on the test stand in the same way as in the vehicle.
Keep the traction on the cable to a minimum, i.e., keep the cable short and not twisted.
5.5.5.2 Supply rated voltage to the blower motor. Adjust the resistance of the air outlet
to the same value as the resistance of the actual air grille or the actual air duct and nozzle
in the vehicle. Adjust the damper to change the air conditioning working condition as
required.
5.5.5.3 Use a torque measuring instrument with an accuracy of ±0.01 N • cm to measure
the magnitude of the operating torque when the damper rotates. Repeat the above
process twice. Calculate the average value.
5.5.5.4 While measuring the operating torque, listen to see if there is any abnormal
sound during the operation of the damper. The result shall meet the requirements of
4.5.5 of this Standard.
5.5.6 Noise
5.5.9 Corrosion resistance
Place the assembly in a salt spray chamber. After conducting a 144h neutral salt spray
test according to GB/T 10125, take out the assembly. Wash it with clean water at about
35°C. Dry it immediately. Observe whether there are bubbles and surface pitting on the
outer surface of the metal parts. The results shall meet the requirements of 4.5.9 of this
Standard.
5.5.10 Vibration resistance
The assembly is fixed on the vibration table by the vibration test fixture according to
the actual installation state. The vibration measurement point shall be near the junction
of the tested product and the test table. The vibration test in the up and down, front and
back, left and right directions is carried out according to the following test conditions:
a) Product status: 50% volume of HFC-134a or CFC-113 is injected into the
evaporator cavity;
b) Air door conditions: internal circulation, full cooling, blowing on face;
c) Blower voltage: rated voltage;
d) Test acceleration: 29.4 m/s2;
e) Test frequency: 33.3 Hz;
f) Test time: 8 h, including 4 h of up and down vibration, 2 h of front and back
vibration and 2 h of left and right vibration;
g) Test temperature: room temperature.
After the test, visually inspect the product for looseness or damage and conduct
performance tests. The results shall meet the requirements of 4.5.10 of this Standard.
5.5.11 Water content
Place the evaporator core in an oven. The oven temperature is 120°C ± 2°C. The core
inlet and outlet are connected with a three-way connection and connected to the
measurement system. The end of the system is connected to a vacuum pump. The
condenser of the moisture test device is placed in alcohol and dry ice at -60°C. Before
the test, the mass of the condenser is weighed as g1. Vacuum it to below 9.81 × 10-2 Pa
and continue for 2 h. Then weigh the mass of the condenser as g2. The difference (g2-
g1) is the water content inside the evaporator core. The result shall meet the
requirements of 4.5.11 of this Standard.
5.5.12 Residual impurities content
Pour 60% of the internal volume of isooctane or CFC-113 into the evaporator core.
Then place it on an oscillating table and vibrate at a frequency of 275 times/min for 3
min. Pour out the contents and filter and dry them. The weight is the internal impurity
content. The result shall meet the requirements of 4.5.12 of this Standard.
5.5.13 Burst pressure
Block one end of the evaporator inlet and outlet. Feed water pressure at the other end
at a rate of 241 kPa/min until the pressure reaches 1.4 MPa (gauge pressure). Observe
whether the evaporator is deformed. Continue to increase the pressure until the product
is severely deformed or leaks. Record the pressure at this time, which shall meet the
requirements of 4.5.13 of this Standard.
5.6 Condenser assembly
5.6.1 Airtight performance
Any of the following methods can be used to test the air tightness of the condenser.
5.6.1.1 Helium test: Use a special helium leak detector for testing. The leak detection
accuracy of the helium leak detector shall be ±0.2 g/a higher than the leakage of HFC-
134a at 0.7 MPa.
5.6.1.2 Water test: Block one end of the condenser inlet and outlet, and pass nitrogen
into the other end. Maintain the pressure at 3.53 MPa (gauge pressure). Place the
product in water and keep it for 3 min. No bubbles shall be generated.
5.6.2 Vibration resistance
The assembly is fixed on the vibration table by the vibration test fixture according to
the actual installation state. The vibration measurement point shall be near the junction
of the tested product and the test table. The vibration test in all directions of up and
down, front and back, left and right is carried out according to the following test
conditions:
a) Product status: The inner cavity is injected with 50% volume of HFC-134a or
CFC-113;
b) Test acceleration: 43.1 m/s2;
c) Test frequency: 33.3 Hz;
d) Test time: 8 h, including 4 h of up and down vibration, 2 h of front and back
vibration and 2 h of left and right vibration;
e) Test temperature: room temperature.
After the vibration test, visually inspect the product for looseness or damage. Perform
an airtightness test in accordance with 5.6.1 of this Standard. The result shall meet the
5.7.3 Burst pressure
After injecting water or oil into the pipeline, increase the pressure linearly at a rate of 1
MPa/min until the test product bursts or leaks. Record the pressure value at this time.
The result shall meet the requirements of 4.7.3 of this Standard.
5.7.4 Resistance to pulse pressure cycles
Inject hydraulic oil into the pipeline and apply pressure of (0~3.53) MPa to the pipeline
alternately at a frequency of 1/3 Hz. Perform 150000 pressure cycles. The results shall
meet the requirements of 4.7.4 of this Standard.
5.7.5 Corrosion resistance
The assembly is subjected to a 168-hour neutral salt spray test in accordance with GB/T
10125. After the test, it is cleaned with clean water at about 35°C and dried immediately.
Visually inspect the metal parts for bubbling, paint peeling and surface pitting. The
results shall meet the requirements of 4.7.5 of this Standard.
5.7.6 Vibration resistance
Install the pipeline on the vibration table according to the actual vehicle assembly state
and conduct the test under the following conditions:
a) Internal pressure of pipeline: 3.53 MPa for liquid hard pipe and exhaust hard pipe,
1.08 MPa for air intake hard pipe;
b) Vibration acceleration: 29.4 m/s2;
c) Vibration direction: up, down;
d) Vibration frequency: 33.3 Hz;
e) Vibration time: 100 h;
f) Ambient temperature: normal temperature.
After the test is completed, repeat test 5.7.2 and observe whether the pipeline has
leakage, breakage or other damage. The result shall meet the requirements of 4.7.6 of
this Standard.
5.7.7 Hose assembly
The test of hose assembly shall be carried out in accordance with the provisions of
standard QC/T 664. The results shall meet the requirements of 4.7.7 of this Standard.
6 Inspection categories, inspection rules and inspection items
6.1 Inspection categories
The inspections specified in this Standard are divided into:
a) exit-factory inspection;
b) type inspection.
6.1.1 Exit-factory inspection
The exit-factory inspection items are shown in Table 1. The same product is allowed to
participate in multiple tests that do not affect the purpose of the assessment.
6.1.2 Type inspection
Type inspection is carried out in the following cases:
a) When there are major changes in the product design, process, materials, etc.;
b) When the product is continuously produced for one year;
c) When the product is produced again after an interval of more than half a year;
d) When the quality inspection department or customers have doubts about the
product quality.
Type inspection must be carried out on products that have passed the exit-factory
inspection. The items for type inspection are shown in Table 1. Among them:
environment simulation test and defrosting and defogging performance test are only
carried out when the product is approved during the development stage.
The sample size for type inspection is 2 units. The same product is allowed to participate
in multiple tests that do not affect the purpose of the assessment.
6.2 Inspection rules
6.2.1 The sampling method, sampling quantity and qualification judgment for exit-
factory inspection shall be agreed upon by the supplier and the purchaser.
6.2.2 During type inspection, if the inspection results do not meet the requirements of
this Standard, double the number of products shall be sampled from the same batch and
the unqualified items shall be re-inspected. If they are still unqualified, the type test
shall be judged as unqualified and product production shall be suspended until the cause
is found, the fault is eliminated and it is confirmed to be qualified before production
can be resumed.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of QC/T 945-2013 be delivered?Answer: The full copy PDF of English version of QC/T 945-2013 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of QC/T 945-2013_English with my colleagues?Answer: Yes. The purchased PDF of QC/T 945-2013_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- QC/T 945-2013 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of QC/T 945-2013?A step-by-step guide to download PDF of QC/T 945-2013_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "QC/T 945-2013". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|