QC/T 658-2009 PDF English
US$145.00 · In stock · Download in 9 secondsQC/T 658-2009: Air-conditioning refrigeration system performances road test method for motor vehicles Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid QC/T 658: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
QC/T 658-2009 | English | 145 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Air-conditioning refrigeration system performances road test method for motor vehicles
| Valid |
QC/T 658-2000 | English | 365 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Automobile Air-Conditioned Vehicle Cooling Performance Test Method
| Obsolete |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: QC/T 658-2009
QC/T 658-2009: Air-conditioning refrigeration system performances road test method for motor vehicles ---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/QCT658-2009
QC
AUTOMOTIVE INDUSTRY STANDARD
ICS 43.040
T 26
Partly replacing QC/T 658-2000
Air-conditioning refrigeration system performances
road test method for motor vehicles
Issued on. NOVEMBER 17, 2009
Implemented on. APRIL 1, 2010
Issued by. Ministry of Industry and Information Technology
Ministry of Industry and Information Technology of the
People’s Republic of China
Table of Contents
Foreword... 6
1 Scope... 7
2 Normative references... 7
3 Terms and definitions... 8
4 Test conditions... 9
5 Test methods... 10
6 Recording of measured data... 13
Annex A (Informative) Diagram of the structure of cross-shaped wind break
wall... 14
Annex B (Normative) Measuring positions for all kinds of parameters... 15
Annex C (Informative) Log sheets... 18
Foreword
This Standard is an amendment to the methods for outdoor static and outdoor running
tests of QC/T 658-2000, Air-conditioning complete vehicle refrigeration performances
road test method for motor vehicles.
The main contents of amendment are as follows.
-- it amends the scope of application;
-- it amends the normative references;
-- it amends the term of solar radiation intensity;
-- it adds the concept of maximum refrigeration;
-- it amends the contents of 4.1 ~ 4.4 and 5.1.1.1;
-- it adds four test methods (5.1.2, 5.2, 5.3, 5.4);
-- it amends Annexes A and B and adds Annex C.
This Standard was proposed by the National Technical Committee of Auto
Standardization.
This Standard shall be under the jurisdiction of the National Technical Committee of
Auto Standardization.
The drafting organization of this Standard. Hainan Auto Test Research Institute.
The main drafters of this Standard. Chen Xunxiao, Mai Ruili.
Air-conditioning refrigeration system performances
road test method for motor vehicles
1 Scope
This Standard of GB/T 5591 contains the definitions related to and the general
requirements to be fulfilled by combined flexible materials for electrical insulation.
This Standard applies to combined flexible materials for electrical insulation, but it does
not apply to those which are made using mica paper as the primary component.
2 Normative references
The following referenced documents are indispensable for the application of this
document. For dated references, only the edition dated applies to this document. For
undated references, the latest edition of the referenced documents (including all
amendments) applies to this document.
GB/T 5591.3, Combined flexible materials for electrical insulation – Part 3.
Specifications for individual materials (GB/T 5591.3-2008, IEC 60626-3.2002,
MOD)
GB/T 13542.4-2009, Film for electrical insulation – Part 4.Polythylene
terephthalate film used for electrical insulation (IEC 60674-3-2.1992, MOD)
GB/T 13542.6-2006, Film for electrical insulation - Part 6.Polyimide films for
electrical insulation (IEC 60674-3-4/6.1993, MOD)
JB/T 12169-2015, Pressboard and presspaper for electrical purposes –
Presspaper (IEC 60641-3-2.2007, MOD)
IEC 60554-3-1.1979, Specification for cellulosic papers for electrical purposes –
Part 3.Specifications for individual materials – Sheet 1.General purpose electrical
paper
3 Terms and definitions
For the purposes of this Standard, the following terms and definitions apply.
3.1
air-conditioning refrigeration system
An air system which consists of one or more of the components, including refrigeration
equipment, ventilation equipment, air purification equipment and humidification
equipment, and necessary control units; it is used to adjust the temperature, humidity
and cleanliness of the air inside the passenger compartment, make it flow and
distribute in certain directions in the passenger compartment at a certain speed and
thus provide comfortable environment for drivers and passengers.
3.2
refrigerated installation
The equipment which consists of compressor, condenser, liquid dryer or liquid-gas
separator, restricting element, evaporator, refrigerator pipelines and so on, and
transfers interior heat to the outside environment.
3.3
intensity of solar radiation
A physical quantity which represents the intensity of radiation of the sun, i.e. the solar
radiation energy projected on unit area vertically within unit time.
4 Test conditions
4.1 Test apparatus
For the apparatus for test see Table 1.
4.2.3 Confirm that the tire pressure is as specified in the instructions for use of vehicle;
4.2.4 Confirm that the assembly of air-conditioning system meets the design
requirements and works normally;
4.2.5 Install engine tachometer;
4.2.6 Arrange measuring points as required in Annex A to this Standard and install
sensors;
4.2.7 Confirm that the air outlet of air-conditioning system is set the maximum position
as designed;
4.2.8 The vehicle is under the curb weight.
4.3 Requirements for number of tester operators in the vehicle
4.4 Test facilities
4.4.1 Cross-shaped wind break wall. there shall be a cross-shaped wind break wall to
keep out the wind, which is 4 m long and 2.5 m high; for its diagram of structure see
Annex A.
4.4.2 Test road. a high-speed track or flat, solid pavement which shall have sufficient
length to ensure that the vehicle can travel at a specified speed.
4.5 Environmental conditions
4.5.1 Frosting test for air-conditioning refrigeration system. the environmental
temperature is less than or equal to 22°C; the relative humidity is greater than or equal
to 70%; the wind speed is less than or equal to 5 m/s; there is no sunlight.
5 Test methods
5.1 Method for testing refrigeration performance and comfortability of air-conditioning
refrigeration system under steady working conditions
5.1.1 Refrigeration performance test.
5.1.1.1 At the preheating temperature rise stage, the vehicle is parked at the test site
with all doors and windows closed; it is exposed to direct sunlight for 90 min under the
conditions of 4.5.2.
5.1.1.6 If the maximum speed of test vehicle cannot achieve 100 km/h, it is allowed to
carry out the test of sequence number 3 in Table 2 at a speed 8 km/h ~ 10 km/h lower
than its maximum speed.
5.1.2 Comfortability test.
5.1.2.1 Measurement of interior air speed. when the vehicle is stabilized under all test
working conditions as specified in Table 2, measure twice the air speed at the
measuring point as specified in B.3 of Annex B and take their mean value as the air
speed of the measuring point.
5.2 Method for testing refrigeration performance of air-conditioning refrigeration
system under variable working conditions
5.2.1 At the preheating temperature rise stage, the vehicle is parked in the test site
with all doors and windows closed; it is exposed to direct sunlight for 90 min under the
conditions of 4.5.2.
5.2.2 Test participants enter the vehicle, start the engine, start the vehicle, record the
initial readings at all measuring points and set the vehicle at maximum refrigeration.
5.2.3 The working conditions shall include starting, acceleration, gear shifting, braking,
stopping, idling and so on; the vehicle is operated by reference to the cyclic working
conditions for urban operation as specified in GB 18352.3-2005, with the test duration
of 45 min; record data as required in 5.1.1.4.
5.3 Frosting test method for air-conditioning system
5.3.1 Test participants (at least 2) enter the vehicle; set the temperature switch to the
maximum refrigeration mode position, the air circulation switch at the outer circulation
position and the air volume switch at the maximum gear;
5.3.2 During the whole test process, observe from time to time whether the
temperature at the air outlet rises; if it rises, stop the vehicle rapidly and check whether
frost forms on evaporator and low pressure pipe lines.
5.4 Pressure test method for air-conditioning refrigeration system
5.4.1 Run the vehicle for preheating.
6 Recording of measured data
All data measured shall be recorded in log sheets which is as specified in or similar to
those specified in Annex C.
Annex A
(Informative)
Diagram of the structure of cross-shaped wind break wall
QC/T 658-2009
QC
AUTOMOTIVE INDUSTRY STANDARD
ICS 43.040
T 26
Partly replacing QC/T 658-2000
Air-conditioning refrigeration system performances
road test method for motor vehicles
Issued on. NOVEMBER 17, 2009
Implemented on. APRIL 1, 2010
Issued by. Ministry of Industry and Information Technology
Ministry of Industry and Information Technology of the
People’s Republic of China
Table of Contents
Foreword... 6
1 Scope... 7
2 Normative references... 7
3 Terms and definitions... 8
4 Test conditions... 9
5 Test methods... 10
6 Recording of measured data... 13
Annex A (Informative) Diagram of the structure of cross-shaped wind break
wall... 14
Annex B (Normative) Measuring positions for all kinds of parameters... 15
Annex C (Informative) Log sheets... 18
Foreword
This Standard is an amendment to the methods for outdoor static and outdoor running
tests of QC/T 658-2000, Air-conditioning complete vehicle refrigeration performances
road test method for motor vehicles.
The main contents of amendment are as follows.
-- it amends the scope of application;
-- it amends the normative references;
-- it amends the term of solar radiation intensity;
-- it adds the concept of maximum refrigeration;
-- it amends the contents of 4.1 ~ 4.4 and 5.1.1.1;
-- it adds four test methods (5.1.2, 5.2, 5.3, 5.4);
-- it amends Annexes A and B and adds Annex C.
This Standard was proposed by the National Technical Committee of Auto
Standardization.
This Standard shall be under the jurisdiction of the National Technical Committee of
Auto Standardization.
The drafting organization of this Standard. Hainan Auto Test Research Institute.
The main drafters of this Standard. Chen Xunxiao, Mai Ruili.
Air-conditioning refrigeration system performances
road test method for motor vehicles
1 Scope
This Standard of GB/T 5591 contains the definitions related to and the general
requirements to be fulfilled by combined flexible materials for electrical insulation.
This Standard applies to combined flexible materials for electrical insulation, but it does
not apply to those which are made using mica paper as the primary component.
2 Normative references
The following referenced documents are indispensable for the application of this
document. For dated references, only the edition dated applies to this document. For
undated references, the latest edition of the referenced documents (including all
amendments) applies to this document.
GB/T 5591.3, Combined flexible materials for electrical insulation – Part 3.
Specifications for individual materials (GB/T 5591.3-2008, IEC 60626-3.2002,
MOD)
GB/T 13542.4-2009, Film for electrical insulation – Part 4.Polythylene
terephthalate film used for electrical insulation (IEC 60674-3-2.1992, MOD)
GB/T 13542.6-2006, Film for electrical insulation - Part 6.Polyimide films for
electrical insulation (IEC 60674-3-4/6.1993, MOD)
JB/T 12169-2015, Pressboard and presspaper for electrical purposes –
Presspaper (IEC 60641-3-2.2007, MOD)
IEC 60554-3-1.1979, Specification for cellulosic papers for electrical purposes –
Part 3.Specifications for individual materials – Sheet 1.General purpose electrical
paper
3 Terms and definitions
For the purposes of this Standard, the following terms and definitions apply.
3.1
air-conditioning refrigeration system
An air system which consists of one or more of the components, including refrigeration
equipment, ventilation equipment, air purification equipment and humidification
equipment, and necessary control units; it is used to adjust the temperature, humidity
and cleanliness of the air inside the passenger compartment, make it flow and
distribute in certain directions in the passenger compartment at a certain speed and
thus provide comfortable environment for drivers and passengers.
3.2
refrigerated installation
The equipment which consists of compressor, condenser, liquid dryer or liquid-gas
separator, restricting element, evaporator, refrigerator pipelines and so on, and
transfers interior heat to the outside environment.
3.3
intensity of solar radiation
A physical quantity which represents the intensity of radiation of the sun, i.e. the solar
radiation energy projected on unit area vertically within unit time.
4 Test conditions
4.1 Test apparatus
For the apparatus for test see Table 1.
4.2.3 Confirm that the tire pressure is as specified in the instructions for use of vehicle;
4.2.4 Confirm that the assembly of air-conditioning system meets the design
requirements and works normally;
4.2.5 Install engine tachometer;
4.2.6 Arrange measuring points as required in Annex A to this Standard and install
sensors;
4.2.7 Confirm that the air outlet of air-conditioning system is set the maximum position
as designed;
4.2.8 The vehicle is under the curb weight.
4.3 Requirements for number of tester operators in the vehicle
4.4 Test facilities
4.4.1 Cross-shaped wind break wall. there shall be a cross-shaped wind break wall to
keep out the wind, which is 4 m long and 2.5 m high; for its diagram of structure see
Annex A.
4.4.2 Test road. a high-speed track or flat, solid pavement which shall have sufficient
length to ensure that the vehicle can travel at a specified speed.
4.5 Environmental conditions
4.5.1 Frosting test for air-conditioning refrigeration system. the environmental
temperature is less than or equal to 22°C; the relative humidity is greater than or equal
to 70%; the wind speed is less than or equal to 5 m/s; there is no sunlight.
5 Test methods
5.1 Method for testing refrigeration performance and comfortability of air-conditioning
refrigeration system under steady working conditions
5.1.1 Refrigeration performance test.
5.1.1.1 At the preheating temperature rise stage, the vehicle is parked at the test site
with all doors and windows closed; it is exposed to direct sunlight for 90 min under the
conditions of 4.5.2.
5.1.1.6 If the maximum speed of test vehicle cannot achieve 100 km/h, it is allowed to
carry out the test of sequence number 3 in Table 2 at a speed 8 km/h ~ 10 km/h lower
than its maximum speed.
5.1.2 Comfortability test.
5.1.2.1 Measurement of interior air speed. when the vehicle is stabilized under all test
working conditions as specified in Table 2, measure twice the air speed at the
measuring point as specified in B.3 of Annex B and take their mean value as the air
speed of the measuring point.
5.2 Method for testing refrigeration performance of air-conditioning refrigeration
system under variable working conditions
5.2.1 At the preheating temperature rise stage, the vehicle is parked in the test site
with all doors and windows closed; it is exposed to direct sunlight for 90 min under the
conditions of 4.5.2.
5.2.2 Test participants enter the vehicle, start the engine, start the vehicle, record the
initial readings at all measuring points and set the vehicle at maximum refrigeration.
5.2.3 The working conditions shall include starting, acceleration, gear shifting, braking,
stopping, idling and so on; the vehicle is operated by reference to the cyclic working
conditions for urban operation as specified in GB 18352.3-2005, with the test duration
of 45 min; record data as required in 5.1.1.4.
5.3 Frosting test method for air-conditioning system
5.3.1 Test participants (at least 2) enter the vehicle; set the temperature switch to the
maximum refrigeration mode position, the air circulation switch at the outer circulation
position and the air volume switch at the maximum gear;
5.3.2 During the whole test process, observe from time to time whether the
temperature at the air outlet rises; if it rises, stop the vehicle rapidly and check whether
frost forms on evaporator and low pressure pipe lines.
5.4 Pressure test method for air-conditioning refrigeration system
5.4.1 Run the vehicle for preheating.
6 Recording of measured data
All data measured shall be recorded in log sheets which is as specified in or similar to
those specified in Annex C.
Annex A
(Informative)
Diagram of the structure of cross-shaped wind break wall
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of QC/T 658-2009 be delivered?Answer: The full copy PDF of English version of QC/T 658-2009 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of QC/T 658-2009_English with my colleagues?Answer: Yes. The purchased PDF of QC/T 658-2009_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- QC/T 658-2009 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds. Question 5: Should I purchase the latest version QC/T 658-2009?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version QC/T 658-2009 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
How to buy and download a true PDF of English version of QC/T 658-2009?A step-by-step guide to download PDF of QC/T 658-2009_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "QC/T 658-2009". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|