QB/T 4108-2010 PDF English
US$70.00 · In stock · Download in 9 secondsQB/T 4108-2010: Metal accessories for footwear Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
QB/T 4108-2010 | English | 70 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Metal accessories for footwear
| Valid |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: QB/T 4108-2010
QB/T 4108-2010: Metal accessories for footwear---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/QBT4108-2010
ICS 61.060
Classification Number. Y 78
Record Number. 30270-2011
LIGHT INDUSTRY STANDARD
OF THE PEOPLE'S REPUBLIC OF CHINA
Metal accessories for footwear
Issued on: NOVEMBER 22, 2010
Implemented on: MARCH 1, 2011
Issued by. Ministry of Industry and Information Technology
QB
Table of Contents
Forward... 3
1 Scope... 4
2 Normative references... 4
3 Requirements... 4
4 Sampling... 5
5 Test methods... 5
6 Inspection rules... 5
7 Signs, packaging, transportation, and storage... 6
References... 7
Forward
This standard was proposed by China Light Industry Federation.
This standard shall be centralized by the National Footwear Standardization
Technical Committee.
Drafting organizations of this standard. China Leather and Footwear Industry
Research Institute, Wenzhou America Rita decorative buckle Ltd., and Jiaxing Fur
and Footwear Industry Research Institute.
The main drafters of this standard. Yan Hongwei, Tian Wang, Huang Meiyong, Lin
Li, Zhuang Li, and Mao Minghua.
This standard is the first-time release.
b) When the production is resumed after long-term of shut-down (3 months);
c) When the National Quality Supervision and Inspection Agency requires to
perform type inspection;
d) When normal production, type inspection shall be performed at least once
every 6 months.
6.3 Determination
If 2 sets of samples meet the requirements of Table 1, the batch of the products is
determined as qualified. If one or more items do not meet the requirements, then
conduct double-sampling. Re-inspect the non-conformance items. If all items
meet the requirements, then the batch of the products is determined as qualified.
If there is one or more items not meeting the requirements, the batch of the
products is determined as unqualified.
7 Signs, packaging, transportation, and storage
7.1 Signs
On the product packaging, it shall be marked with. This standard number, product
name, quantity, specifications and model, manufacturer name and address, date
of production and so on.
7.2 Packaging
It should contain soft pack, moisture agent and the like.
7.3 Transportation and storage
During transportation and storage, it must avoid pressure, moisture, rain,
sun-exposure. And it must not stored together with oil, acid, alkali and other
corrosive substances. In handling, loading and unloading, it is prohibited from
tossing. It must prevent the mutual friction and damage between the metal
accessories. Those without coating should be applied with rust-inhibitor.
Warehouse shall be maintained with good ventilation, dry, without corrosive
substance (gas). Products shall be placed 0.2m above ground and away walls.
If there are other requirements related to packaging, transportation and storage, it
shall be agreed upon by both purchaser and supplier.
References
SJ 1282-1977 Test methods for adhesion of metallic coatings
ISO/TR 20572.2007 Footwear - Performance requirements for components for
footwear - Accessories
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of QB/T 4108-2010 be delivered?Answer: The full copy PDF of English version of QB/T 4108-2010 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of QB/T 4108-2010_English with my colleagues?Answer: Yes. The purchased PDF of QB/T 4108-2010_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- QB/T 4108-2010 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of QB/T 4108-2010?A step-by-step guide to download PDF of QB/T 4108-2010_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "QB/T 4108-2010". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|