|
US$669.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. LY/T 1728-2008: Feeding technical criterion of ring-necked pheasant
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| LY/T 1728-2008 | English | 669 |
Add to Cart
|
4 days [Need to translate]
|
Feeding technical criterion of ring-necked pheasant
| |
LY/T 1728-2008
|
PDF similar to LY/T 1728-2008
Basic data | Standard ID | LY/T 1728-2008 (LY/T1728-2008) | | Description (Translated English) | Feeding technical criterion of ring-necked pheasant | | Sector / Industry | Forestry Industry Standard (Recommended) | | Classification of Chinese Standard | B44 | | Classification of International Standard | 65.020.30 | | Word Count Estimation | 19,110 | | Date of Issue | 2008-03-31 | | Date of Implementation | 2008-05-01 | | Quoted Standard | GB 5749; GB 13078; GB 18596; HJ/T 81-2001 | | Regulation (derived from) | State Forestry Administration Announcement (Website) | | Issuing agency(ies) | State Forestry Administration | | Summary | This standard specifies the ring-necked pheasant (Phasianus colchicus) farm construction, feeding and management, artificial incubation, health and epidemic prevention, population structure and file management turnover technical content. This standard applies to ring-necked pheasant farms. |
LY/T 1728-2008: Feeding technical criterion of ring-necked pheasant---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Feeding technical criterion of ring-necked pheasant
ICS 65.020.30
B44
People's Republic of China forestry industry standards
Ring-necked pheasant breeding technical regulations
Posted.2008-03-31
2008-05-01 implementation
State Forestry Administration released
Foreword
Appendix A of this standard is an informative annex.
This standard proposed by the State Forestry Administration.
This standard is drafted by Heilongjiang Institute of Wildlife.
The main drafters of this standard. Sun Hongyu, Jin Yuwen, Ge Dongning, Yang Yang, Yang Jiao, Wang Aiqin.
Ring-necked pheasant breeding technical regulations
1 Scope
Construction turnover and file management and other technical content.
This standard applies to Central Pheasant breeding farms.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. All dated references, which are subsequently owned
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to reach an agreement based on this standard research
Whether you can use the latest versions of these files. For undated references, the latest version applies to this standard.
GB 5749 drinking water health standards
GB 13078 feed hygiene standards
GB 18596 livestock and poultry breeding pollutant discharge standards
Technical Code for Pollution Prevention and Control of Livestock and Poultry Farms
3 farms construction
3.1 site selection
Plain areas should choose a high-lying, slightly south or southeast tilt built place; mountainous, hilly areas should choose the south or east slope
South built field.
Should choose sandy soil, adequate water, good water quality, transportation and power supply more convenient place to build. Farms should be located in residential areas
Above 500m, the distance to the general road should be above 150m and the distance to the traffic artery should be above.2000m.
3.2 farms layout
a) Administrative regions. parallel to the side of the supply area or the other side of the main wind direction of the production area, and the production area should be.200m ~ 250m
distance;
b) Production areas. should be built in the highest areas, according to the prevailing wind hatching room, brooding room, breeding pheasant house and adult pheasant house
The order of the hatching room and the brood room should be 150m ~ 180m, the brood room should be
30m ~ 35m, Yicheng pheasant house and the adult pheasant house the distance should be 20m ~ 25m;
c) living area. with the production area should be.200m ~ 250m distance;
d) Supply Area. Located on the side of the production area is more convenient;
e) Venue access. divided into net and dirty;
f) sick pheasant isolation area and pile yard. in accordance with HJ/T 81-2001 Chapter 5 implementation.
3.3 farm buildings
3.3.1 adult pheasant house building
a) North-south should be sitting, the length of each house × 45m × 5m, north wall high 2.5m, South wall high 2m, equipped with 9, South side
Built with pheasant house connected to the stadium, the stadium length × width × height of 50m × 10m × 2m, and cover the net (nylon mesh or iron
Mesh), mesh size of 2cm × 2cm;
b) Shenery, outside should be set according to the size of the breeding grounds of many groups of perches, habitat diameter width should be about 6cm, each pitch
60cm, height from the ground should be 50cm ~ 80cm;
c) outdoor playground covered with 3cm ~ 5cm thick gravel.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of LY/T 1728-2008_English be delivered?Answer: Upon your order, we will start to translate LY/T 1728-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of LY/T 1728-2008_English with my colleagues?Answer: Yes. The purchased PDF of LY/T 1728-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|