HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB/T 7725-2022 PDF English

US$1280.00 · In stock · Download in 9 seconds
GB/T 7725-2022: Room air conditioner
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 7725: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB/T 7725-2022English1280 Add to Cart 0-9 seconds. Auto-delivery Room air conditioner Valid
GB/T 7725-2004EnglishRFQ ASK 9 days Room air conditioners Obsolete
GB/T 7725-1996EnglishRFQ ASK 9 days Room air conditioners Obsolete
GB/T 7725-1987EnglishRFQ ASK 3 days Room air conditioners Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB/T 7725-2022
      

Similar standards

GB 4706.32   GB/T 8059.1   GB/T 4706.74   

GB/T 7725-2022: Room air conditioner

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT7725-2022
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 91.140.30 CCS Y 61 Replacing GB/T 7725-2004 Room air conditioner (ISO 5151.2017, Non-ducted air conditioners and heat pumps - Testing and rating for performance, NEQ) Issued on. OCTOBER 12, 2022 Implemented on. MAY 01, 2023 Issued by. State Administration for Market Regulation; Standardization Administration of the People's Republic of China.

Table of Contents

Foreword... 3 1 Scope... 6 2 Normative references... 6 3 Terms and definitions, symbols... 7 4 Product classification... 24 5 Technical requirements... 27 6 Tests... 33 7 Inspection rules... 51 8 Marks, packaging, transportation and storage... 56 Annex A (normative) Multi-split room air conditioners... 60 Annex B (normative) Calculation of seasonal energy consumption efficiency of room air conditioners... 66 Annex C (informative) Occurrence time of each temperature calculated based on the meteorological data of a typical city (taking Nanjing as an example)... 95 Annex D (normative) Tests and calculation methods for cooling capacity and heating capacity... 97 Annex E (informative) Measuring instruments... 120 Annex F (informative) Air volume measurement... 123 Annex G (informative) Cooling condensed water measurement... 130 Annex H (informative) Diagram of heating capacity test procedure in D.4... 131 Annex I (normative) Measurement of noise... 136 Annex J (normative) Standby power test... 143 Annex K (informative) Grading of some performances... 144 Annex L (informative) Test method for temperature control fluctuation... 147 Annex M (informative) Refrigerant enthalpy method... 149 Annex N (informative) Enthalpy method of outdoor side air... 152 Annex O (informative) Verification test method for indoor side calorimeters... 156 Annex P (informative) Verification test method for outdoor side calorimeters... 158 Annex Q (informative) Verification test method for balance calorimeter... 160 Bibliography... 161

1 Scope

This document specifies the terms and definitions, product classification, technical requirements, tests, inspection rules, marks, packaging, transportation and storage for room air conditioners. This document applies to household and similar free-supply room air conditioners (hereinafter referred to as air conditioners) that use air-cooled or water-cooled condensers, fully enclosed motor-compressors, and whose rated cooling capacity is below 14000W for the purpose of creating a comfortable indoor environment), as well as ducted air conditioners whose rated cooling capacity is less than 8kW and external static pressure is less than 25Pa. This document does not apply to the following products and systems. - portable air conditioners; - individual components that cannot form a complete cooling system; - air conditioners using absorption cooling cycle; - other ducted air conditioners.

2 Normative references

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 191, Packaging and storage marks GB/T 1766, Paints and varnishes - Rating schemes of degradation of coats (ISO 4628.2003, NEQ) GB/T 2423.3, Environmental testing - Part 2.Testing method - Test Cab. Damp heat, steady state (GB/T 2423.3-2016, IEC 60068-2-78.2012, IDT) GB/T 2423.17, Environmental testing for electric and electronic products - Part 2. Test method - Test Ka. Salt mist (GB/T 2423.17-2008, IEC 60068-2-11.1981, IDT) GB/T 2828.1, Sampling procedures for inspection by attributes - Part 1.Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection (GB/T 2828.1-2012, ISO 2859-1.1999, IDT) GB/T 2829, Sampling procedures and tables for periodic inspection by attributes (apply to inspection of process stability) GB/T 4214.1, Test method for noise of household and similar electrical appliances - General requirements (GB/T 4214.1-2017, IEC 60704-1.2010, MOD) GB/T 4798.1, Classification of environmental conditions - Classification of groups of environmental parameters and their severities - Part 1.Storage (GB/T 4798.1- 2005, IEC 60721-3-1.1997, MOD) GB/T 5296.2, Instructions for use of products of consumer interest - Part 2. Household and similar electrical appliances

3 Terms and definitions, symbols

3.1 Terms and definitions The following terms and definitions apply to this document. 3.1.1 room air conditioner A device that supplies conditioned air to a room. 3.1.2 heat pump A cooling system that heats up the indoor air by converting the flow direction of the refrigerant in the cooling system, absorbing heat from the low temperature outdoor air and releasing heat to the room. NOTE. Air conditioners with heat pump heating capabilities are called heat pump air conditioners. 3.1.3 supplementary electrical heating devices An electric heating device used with a heat pump for heating. 3.1.6 heating capacity When the air conditioner is in heating operation under any given working conditions and conditions, the sum of the heat sent into the room per unit time. 3.1.7 heating power input The power consumed by the air conditioner during the heating capacity test. NOTE. The unit is watts (W). The rated value of heating power input includes rated heating power input, rated intermediate heating power input and rated low temperature heating power input. 3.1.8 effective power input The average electric power input into the air conditioner within the specified time, including. 3.1.9 energy efficiency ratio; EER Under any given working condition and specified conditions, when the air conditioner is in cooling operation, the ratio of cooling capacity to effective power input. NOTE. The unit is watts per watt (W/W). 3.1.10 coefficient of performance; COP Under any given working condition and specified conditions, when the air conditioner is in heating operation, the ratio of the heating capacity to the effective power input. NOTE. The unit is watts per watt (W/W). 3.1.11 standard air Dry air at 20°C and at a standard barometric pressure of 101.325 kPa, having a mass density of 1.204 kg/m3.

4 Product classification

4.1 Type 4.1.1 Air conditioners are divided into. 4.1.2 According to the structural form, air conditioners are divided into. 4.1.3 According to the main function, air conditioners are divided into. 4.1.4 According to the cooling method, air conditioners are divided into. 4.1.5 According to the compressor control mode, air conditioners are divided into. 4.2 Basic parameters 4.2.1 The preferred series of rated cooling capacity (in kW) of the air conditioner are. 4.3 Model naming 4.3.1 The product model and its meaning are as follows. 4.3.2 Model examples are as follows. Example 1.KT3C-35/A, means T3 climate type, overall (window type) cold air-cooled room air conditioner. Its rated cooling capacity is 3500 W. It is first redesigned. Example 2.KFR-28GW, means T1 climate type, split heat-pumped wall-mounted room air conditioner (including indoor unit and outdoor unit). The rated cooling capacity is 2800 W.

5 Technical requirements

5.1 General requirements 5.1.1 Air conditioners shall comply with the provisions of this document and other relevant mandatory national standards. They shall be designed and manufactured according to the drawings and technical documents approved by the prescribed procedures. 5.2 Performance requirements 5.2.1 Sealing performance of cooling system Test according to 6.3.1.Refrigerant leakage shall not be detected in each part of the cooling system. 5.2.2 Cooling capacity 5.2.3 Cooling power input 5.2.3.1 Rated cooling power input Test according to 6.3.3.The measured cooling power input of fixed speed and variable speed air conditioners shall not exceed 110% of the rated cooling power input. For every 300 W cooling capacity of the water-cooled air conditioner, add 10 W as the rated power input of the cooling system water pump and cooling water tower fan. 5.2.4 Heating capacity 5.2.5 Heating power input 5.2.7 Maximum operating cooling The requirements for testing according to the test method in 6.3.7 are as follows. 5.2.9 Freeze dripping Test according to 6.3.9.There shall be no visible ice falling, water dripping or blowing out at the indoor side of the air conditioner. 5.2.10 Maximum operating heating The requirements for testing according to the test method of 6.3.10 are as follows. 5.2.11 Minimum operating heating When the test is carried out according to 6.3.11, the safety device shall not trip off during the 1h test run of the air conditioner. 5.2.12 Condensation and condensed water removal capacity The requirements for testing according to 6.3.12 are as follows. 5.2.13 Automatic defrosting The requirements for testing according to 6.3.13 are as follows. 5.2.14 Noise The requirements for testing according to 6.3.14 are as follows. 5.2.16 Seasonal total energy Calculation of seasonal energy consumption efficiency is according to Annex B. The calculated seasonal total energy shall not be greater than 110% of the indicated value. 5.2.17 Standby power The standby power shall not be higher than 110% of the indicated value. 5.2.18 Indoor discharge air-flow The indoor discharge air-flow shall not be less than 90% of the indicated value. 5.2.19 Weather resistance The requirements for testing according to 6.3.17 are as follows.

6 Tests

6.1 Test conditions 6.2 Test requirements 6.2.5 No changes shall be made to the air conditioner except for the connection of devices and instruments required for the test in the prescribed manner. 6.2.6 The air conditioner fan speed and air resistance shall not be changed during the test. The test results shall adopt the values corrected according to the standard atmospheric pressure. 6.2.7 When using the indoor air-enthalpy test method to carry out the cooling capacity and heating capacity tests, see the measurement method for air volume in Annex F. The test shall be carried out under the condition that the external static pressure is 0Pa. 6.2.8 The installation of air conditioners shall meet the following requirements. 6.2.9 For working conditions where the wet bulb temperature is below 0°C, the wet bulb temperature can be controlled by controlling the relative humidity or dew point temperature. 6.2.10 When the cooling capacity test is carried out by the room-type calorimeter method or the indoor air-enthalpy test method, the latent cooling capacity of the air conditioner shall be determined according to the measurement method for condensed water (see Annex G). 6.3 Test methods 6.3.2 Cooling capacity 6.3.3 Cooling power input Measure the power input and current of the air conditioner while performing the rated cooling capacity, rated intermediate cooling capacity, rated minimum cooling operation, and rated maximum cooling capacity operation according to the method given in Annex D. 6.3.4 Heating capacity 6.3.6 Heating power input of supplementary electric heating device Heat-pumped air conditioner operates under rated heating (high temperature) conditions. The heat-pumped air conditioner equipped with supplementary electric heating device shall be tested by the method in 6.3.4.1. 6.3.8 Minimum operating cooling and freezing The ventilation door and exhaust door (if any) for exchanging indoor and outdoor air of the air conditioner are completely closed. 6.3.9 Freeze dripping The freeze dripping test shall be performed immediately after the minimum operating cooling and freeze tests have been completed. After reaching the freezing test conditions specified in Table 2, carry out the following tests. Cover the air return vent in the air conditioner. Run for 4 h after completely blocking air circulation. The air path of the evaporator coil is completely blocked by frost. Remove the cover after shutdown until the frost has completely melted. Then make the fan run continuously at the highest speed for 5 min. 6.3.11 Minimum operating heating Fully close the vent and exhaust doors (if any) of the air conditioner. The set temperature, fan speed and guide grill are adjusted to the maximum heating state without violating the manufacturer's regulations. According to the minimum operating heating conditions specified in Table 2, make the air conditioner start and run until the working conditions are stable and then run for 1 h. 6.3.13 Automatic defrost If the air conditioner has special measures to ensure that no cold air (below 18°C) will be blown into the room during the defrosting process, this test is not required. For an air conditioner equipped with an automatic defrosting device, adjust the temperature controller, fan speed (indoor fan at high speed and outdoor fan at low speed if they can be adjusted separately), damper and guide grille to the normal use state specified by the manufacturer. 6.3.14 Noise According to the requirements of Annex I, carry out the noise test under the conditions of rated cooling working conditions and rated (high temperature) heating working conditions. 6.3.18 Additional tests for calculation of seasonal energy consumption efficiency 6.3.18.1 Low temperature cooling Carry out the test according to the method given in Annex D. The air conditioner is tested after continuous and stable operation for 1 h under low temperature cooling conditions and specified conditions. 6.3.18.2 Low humidity cooling Carry out the test according to the method given in Annex D. The air conditioner is tested after 1 h of continuous and stable operation under low humidity cooling conditions and specified conditions. 6.3.18.3 Intermittent cooling Carry out the test according to the method given in Annex D. The air conditioner is tested by the indoor air-enthalpy test method under intermittent cooling conditions and the following conditions. 6.3.18.4 Intermittent heating 6.3.19 Other test methods 6.4 Measurement requirements 6.4.4 When the air conditioner is subjected to cooling capacity and steady-state heating capacity tests, the reading tolerances of each parameter under test conditions shall comply with the provisions in Table 6.When carrying out additional tests of seasonal energy consumption, the reading tolerances of each parameter under the test conditions shall comply with the provisions in Table 7.

7 Inspection rules

7.1 Inspection requirements The safety requirements of air conditioner products shall meet the requirements of IEC 60335-2-40.2018. 7.2 Product inspection 7.2.1 Exit-factory inspection All air conditioners proposed for delivery shall undergo exit-factory inspection. See Table 10 for the test items, requirements and test methods of the exit-factory inspection. Items with serial numbers (1~7) are mandatory inspection items for the product. 7.2.2 Random inspection For the items of random inspection, see the serial number (8~19) items in Table 10. Sampling of inspection items can be carried out according to GB/T 2828.1.The random inspection items, batch size, sampling plan, inspection level and qualified quality level of the batch-by-batch inspection can be determined by the manufacturer's quality inspection department. 7.2.3 Type inspection 7.3 Determination for inspection 7.3.1 The safety items of the exit-factory inspection items are fatal flaws. As long as one item fails, the batch of products will be rejected. After exit-factory inspection and random inspection, all qualified samples can be delivered to the ordering party as accepted products. 7.3.2 The safety items of the type inspection are fatal flaws. The safety items shall be 100% accepted. If one item is found to be unqualified, it is determined that this cycle of products is rejected. Samples for type inspection shall be randomly selected from the accepted finished products. Samples for type inspection shall not be delivered to the ordering party as accepted products. 7.4 Product acceptance The test items, requirements and test methods of the products leaving the factory and random inspection are in accordance with the requirements in Table 10.The product type test items, requirements and test methods are in accordance with the requirements in Table 11.

8 Marks, packaging, transportation and storage

8.1 Marks 8.1.1 Each air conditioner shall have a durable nameplate fixed on an obvious place. The relevant content stipulated in Chapter 7 of IEC 60335-2-40.2018 shall be marked. The nameplate shall clearly mark the following items. 8.1.2 The air conditioner shall be provided with marks indicating the working conditions, such as the marks indicating the direction of rotation of control switches and knobs. Attach the electrical schematics where appropriate. For air conditioners with health assistance functions such as purification and sterilization, if the health assistance function affects other technical parameters, the relevant situation shall be stated in the instructions for use. 8.1.3 The air conditioner shall have a registered trademark mark. 8.2 Packaging 8.2.1 Air conditioners shall be cleaned and dried before packaging. 8.2.2 The packaging of the air conditioner shall meet the requirements of GB/T 22939.7. 8.2.3 The following documents and accessories shall be attached to the air conditioner packing box. 8.2.4 The accompanying documents shall be sealed against moisture and placed in an appropriate place in the box. 8.3 Transportation and storage ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB/T 7725-2022 be delivered?

Answer: The full copy PDF of English version of GB/T 7725-2022 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 7725-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 7725-2022_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB/T 7725-2022 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB/T 7725-2022?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 7725-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB/T 7725-2022?

A step-by-step guide to download PDF of GB/T 7725-2022_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 7725-2022".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9