Code for acceptance of construction quality of industrial equipment and pipeline insulation engineering
| Valid |
GB/T 50185-2019
|
GB 50185-2010 | English | RFQ |
ASK
|
3 days [Need to translate]
|
Code for acceptance of construction quality of industrial equipment and pipeline insulation engineering
| Obsolete |
GB 50185-2010
|
GB 50185-1993 | English | RFQ |
ASK
|
9 days [Need to translate]
|
Standard for inspection and evaluation of thermal insulating work of industrial equipment and pipeline
| Obsolete |
GB 50185-1993
|
Standard ID | GB/T 50185-2019 (GB/T50185-2019) | Description (Translated English) | Code for acceptance of construction quality of industrial equipment and pipeline insulation engineering | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | P94 | Classification of International Standard | 13.220.20 | Word Count Estimation | 73,797 | Date of Issue | 2019 | Date of Implementation | 2020-03-01 | Standard ID | GB 50185-2010 (GB50185-2010) | Description (Translated English) | Code for acceptance of construction quality of industrial equipment and pipeline insulation engineering [Quasi-Official / Academic version - scanned PDF, translated by Standard Committee / Research Institute in China] | Sector / Industry | National Standard | Classification of Chinese Standard | P94 | Word Count Estimation | 75,711 | Date of Issue | 2010-05-31 | Date of Implementation | 2010-12-01 | Older Standard (superseded by this standard) | GB 50185-1993 | Quoted Standard | GB 50126; GB 50252; GB/T 17393 | Drafting Organization | China Petroleum & Chemical Engineering Survey and Design Association | Administrative Organization | National Chemical Construction Standardization Management Center Station | Regulation (derived from) | Bulletin of the Ministry of Housing and Urban No. 599 | Summary | This Chinese standard is applicable to industrial equipment and piping inside the medium temperature is greater than or equal to -196��C, less than or equal to +850��C insulation construction quality acceptance. | Standard ID | GB 50185-1993 (GB50185-1993) | Description (Translated English) | Standard for inspection and evaluation of thermal insulating work of industrial equipment and pipeline | Sector / Industry | National Standard | Classification of Chinese Standard | P94 | Word Count Estimation | 37,357 | Date of Issue | 1993/8/28 | Date of Implementation | 1994/8/1 | Regulation (derived from) | Construction-Standard No. 104 [2008] |
UDC
NATIONAL STANDARD
OF THE PEOPLE'S REPUBLIC OF CHINA
Code for Acceptance of Construction Quality of
Industrial Equipment and Pipeline Insulation
Engineering
ISSUED ON. MAY 31, 2010
IMPLEMENTED ON. DECEMBER 1, 2010
Jointly Issued by Ministry of Housing and Urban-Rural Construction of the People's
Republic of China
General Administration of Quality Supervision, Inspection and
Quarantine of the People's Republic of China
NATIONAL STANDARD
OF THE PEOPLE'S REPUBLIC OF CHINA
Code for Acceptance of Construction Quality of Industrial Equipment
and Pipeline Insulation Engineering
Chief Development Department. Branch on Chemical Industry, China Association for Engineering
Construction Standardization
Approval Depatiment. Ministry of Housing and Urban-Rural Development of the People 's Republic
of China
Implementation Date. December 1, 2010
Beijing 2010
NOTICE
This code is written in Chinese and English. The Chinese text shall be taken as the ruling one in
the event of any inconsistency between the Chinese text and the English text.
Announcement of Ministry of Housing and Urban-Rural
Development of the People's Republic of China
No. 599
Announcement on Publishing the National Standard "Code for Acceptance of
Construction Quality of Industrial Equipment and Pipeline Insulation
Engineering"
"Code for Acceptance of Construction Quality of Industrial Equipment and Pipeline Insulation
Engineering" has been approved as a national standard with a serial number of GB 50185 - 2010 and
shall be implemented from December 1, 2010. Therein, Articles (Items) 3.2.6 (5), 5.0.4, 6.1.2, 6.2.2
(1), 6.2.5 (2), 6.2.8 (3), 7.0.2, 8.1.2, 8.1.3, 8.1.4, 8.2.2 and 9.0.4 are compulsory provisions and must
be enforced strictly.
Authorized by the Standard Rating Research Institute, this code is published and distributed by
China Planning Press .
Ministry ofHousing and Urban-Rural Development ofthe People 's Republic of China
May 31 , 2010
Foreword
This code was revised based on "Standard for Inspection and Evaluation of Thermal Insulating
Work of Industrial Equipment and Pipeline" GB 50185-93 by the China Petroleum & Chemical
Engineering Survey and Design Association and National Administrative Center of Standardization of
Chemical Construction in conjunction with the departments concerned according to the requirements
of "Notice on Printing the Development and Revision Plan of Engineering Construction Standards
and Codes in 2006" issued by the former Ministry of Construction.
During the process of revising this code, the code development team revised, examined and
finalized based this code on extensively soliciting for opinions by wide investigation and study,
earnestly summarizing the practical experiences and making reference to the relevant international
standards and foreign advanced standards.
This code comprises nine chapters and five appendixes, which mainly covers. general provisions,
terms, basic requirement, material, attachment installation, construction quality acceptance of heat
insulating layer, construction quality acceptance of dampproof course, construction quality acceptance
check of protective course, and acceptance of project, etc ..
There have been some significant changes in this code in the following technical aspects.
Provision on term of"inspection lot" was added.
2 Provisions on the quality acceptance of "inspection lot" were added and requirements on the
measured values at the random inspection points of allowable deviation among the inspection lot were
increased.
3 Chapter 4 "material" was added, and the contents on the site sampling and inspection of all
kinds of materials were adjusted appropriately.
4 Chapter of "attachment installation" was added.
5 Provisions on quality acceptance of the heat insulating layers of "embedded layering method",
"smear method", "metallic reflective insulating structure" and "pipe-in-pipe" were added.
6 Section of "protective course made of felt, foil and cloth" was deleted and section of "nonmetallic
protective course" was added .
Provisions printed in bold type in this code are compulsory and must be enforced strictly.
The Ministry of Housing and Urban-Rural Development of the People 's Republic of China is in
charge of the administration of this code and the explanation of the compulsory provisions, the Branch
on Chemical Industry of China Association for Engineering Construction Standardization is in charge
of the current management of this code, and the National Administrative Center of Standardization of
Chemical Construction is responsible for the explanation of specific technical contents . During the
process of implementing th is code, the relevant opinions and advice, whenever necessary, can be
posted or passed on to National Administrative Center of Standardization of Chemical Construction
(Address. Room 1-1-1107, No. 28, Benevolence Hotel, Huai' an East Road, Qiaodong District,
Shijiazhuang City, Hebei Province, 050020, China) for reference during future update.
Chief Development Organizations, Participating Development Organizations, Participating
Organizations, Chief Drafting Staffs and Chief Examiners ofthis code.
Chief Development Organizations.
China Petroleum & Chemical Engineering Survey and Design Association
National Administrative Center of Standardization of Chemical Construction
Participating Development Organizations.
No. I Engineering Company of Northwest Power Construction
China National Chemical Engineering Third construction Co., Ltd.
Shanghai Huajian Insulation and Corrosion Protection Engineering Co. , Ltd.
The Fourth Construction Company of SINOPEC
Technical Committee on Application of Insulation Engineering, Shanghai
Energy Research Society
Henna Qinyang Huamei Co. , Ltd.
China 20Mcc Group Corporation Ltd.
Participating Organizations. Hangzhou Yanshan Magnesium Steelprotective Coating Co., Ltd.
Jiangsu MingJiang Engineering Co., Ltd.
Zhejiang Zhenshen Cold Insulation Technology Co., Ltd.
Wuxi Mingjiang Heat Insulating Material Co., Ltd.
Shanghai Yueming Insulation Engineering Co., Ltd.
Chief Drafting Staffs. Zhao Yuanyang, Li Xiangren, Shao Zhende, Hu Wei, Lu Tian, Cai Ziming,
Chen Hongzhang, and Li Changliang
Chief Examiners. Ji Fangqi, Weng Zhenjiang, Dai Hongkuan, Gao Yubao, Fang Yongxing,
Li Gongfu, Liu Guanggen, Wang Zhongren, Shen Meiju, Zhang Yongguang,
Chen Tianquan, Zhang Xiang, and Chang Xuli
Contents
General Provisions ... 1
2 Terms ... 2
3 Basic Requirement ... 3
3.1 Division of the Construction Quality Acceptance ... 3
3 .2 Qualified Requirement for Quality Acceptance ... 3
3.3 Procedure and Quantity of the Construction Quality Acceptance ... 4
4 Material ... 6
5 Attach1nent Installation ... 8
6 Construction Quality Acceptance of Heat Insulating Layer ... 1 0
6.1 General Requirement ... 10
6.2 Construction Quality ... 11
7 Construction Quality Acceptance ofDampproofCourse ... 18
8 Construction Quality Acceptance of Protective Course ... 20
8.1 Metallic Protective Course ... 20
8.2 Nonmetallic Protective Course ... 23
9 Acceptance of Project... 25
Appendix A List of Inspection Lot Quality Acceptance ... 26
Appendix B List of Sub-item Project's Quality Acceptance ... 27
Appendix C List of Subsection (Sub-subsection) Project's Quality Acceptance ... 28
Appendix D List of Unit (Sub-unit) Project's Quality Acceptance ... 29
Appendix E Check List of the Quality's Guarantee Materials ... 30
Explanation of Wording in This Code ... 31
List of Quoted Standards ... 32
1 General Provisions
1.0.1 This code was formulated in order to unify the methods of construction quality acceptance of
industrial equipment and pipeline insulation engineering, strengthen the technical management and
ensure the engineering quality.
1.0.2 This code applies to the acceptance of construction quality of industrial equipment and pipeline
engineering with the internal medium temperature greater than or equal to - 196'C but less than or
equal to +850'C.
1.0.3 This code shall be used in conjunction with the current national standards "Unified Standard
for Constructional Quality Acceptance of Industrial Installation Engineering" GB 50252 and "Code
for Construction oflndustrial Equipment and Pipeline Insulation Engineering" GB 50126.
1.0.4 This code specifies the basic requirements for the acceptance of construction quality of
industrial equipment and pipeline insulation engineering, and it shall be enforced according to the
requirements of the national laws and administrative regulations if this code conflicts with the
requirements ofthe national laws and administrative regulations.
1.0.5 The acceptance of construction quality of industrial equipment and pipeline insulation
engineering shall not only comply with this code, but also shall meet those specified in the relevant
current standards of the state.
2 Terms
2.0.1 Inspection lot
An inspection body composed of a certain quantity of samples collected for inspection according
to the same production conditions or the specified mode.
2.0.2 Allowable deviation
Provided that the safety and functions of use of engineering can be met, it is allowed that a small
number of inspection points may be overproof within the proportional range specified in this code
dur...
......
|