|
US$209.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 39264-2020: Technical specification for unified management and control platform of smart hydropower plant Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 39264-2020 | English | 209 |
Add to Cart
|
3 days [Need to translate]
|
Technical specification for unified management and control platform of smart hydropower plant
| Valid |
GB/T 39264-2020
|
PDF similar to GB/T 39264-2020
Basic data | Standard ID | GB/T 39264-2020 (GB/T39264-2020) | | Description (Translated English) | Technical specification for unified management and control platform of smart hydropower plant | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F07 | | Classification of International Standard | 27.100 | | Word Count Estimation | 11,180 | | Date of Issue | 2020-11-19 | | Date of Implementation | 2021-06-01 | | Quoted Standard | GB/T 20273; DL/T 476; DL/T 578; DL/T 634.5104; DL/T 822; DL/T 860.81; DL/T 1085; DL/T 1547; NB/T 35001 | | Regulation (derived from) | National Standard Announcement No. 26 of 2020 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration | | Summary | This standard specifies the basic requirements, platform architecture, functional requirements, interface requirements and main technical indicators of an integrated management and control platform for smart hydropower plants (hereinafter referred to as: platform). This standard applies to smart hydropower plants. |
GB/T 39264-2020: Technical specification for unified management and control platform of smart hydropower plant ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for unified management and control platform of smart hydropower plant
ICS 27.100
F07
National Standards of People's Republic of China
Technical specifications for integrated management and control platform for smart hydropower plants
2020-11-19 released
2021-06-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Preface Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Basic requirements 1
5 Platform Architecture 2
6 Functional requirements 2
7 Interface requirements 5
8 Main technical indicators 5
Appendix A (Normative Appendix) Software and hardware architecture diagram of integrated management and control platform for hydropower plants 7
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that certain contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents.
This standard was proposed and managed by the China Electricity Council.
Drafting organizations of this standard. NARI Group Co., Ltd., Guodian NARI Technology Co., Ltd., State Grid Xinyuan Holdings Co., Ltd., China
Jiang Sanxia Group Co., Ltd., China Southern Power Grid Peak and Frequency Modulation Power Generation Co., Ltd., Beijing Zhongshui Ke Hydropower Technology Development Co., Ltd., Guangxi Laurel
Electric Power Co., Ltd., Wuling Electric Power Co., Ltd., Yalong River Basin Hydropower Development Co., Ltd., Guangzhou Jianxin Technology Co., Ltd.
The main drafters of this standard. Xu Jie, Zheng Jianbing, Wang Yongtan, Li Dinglin, Huang Jiazhi, Wang Pengyu, Rui Jun, Luo Wei, Zeng Guangyi, Yang Lin, Yan Jun,
Xu Qing, Zhang Yi, Yao Xiaoyan, Lu Zhijuan, Zhou Pan, Gong Yu, Cai Jie, Zeng Zaixiang, Zhang Liang, Zheng Huijuan, Wang Meizhi, Zhang Zhenhua, Luo Zhongqi.
Technical specifications for integrated management and control platform for smart hydropower plants
1 Scope
This standard specifies the basic requirements, platform architecture, functional requirements, and interfaces of an integrated management and control platform for smart hydropower plants (hereinafter referred to as the platform)
Requirements and main technical indicators.
This standard applies to smart hydropower plants.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this document.
For undated references, the latest version (including all amendments) applies to this document.
GB/T 20273 Information Security Technology Database Management System Security Technical Requirements
DL/T 476 Power system real-time data communication application layer protocol
DL/T 578 Basic technical conditions of computer monitoring system for hydropower plants
DL/T 634.5104 Telecontrol equipment and system Part 5-104.Transmission protocol adopts IEC 60870- standard transmission protocol set
5-101 network access
DL/T 822 Test Acceptance Regulations for Computer Monitoring System of Hydropower Plant
DL/T 860.81 Power Automation Communication Network and System Part 8-1.Specific Communication Service Mapping (SCSM)-Mapping to
MMS (ISO 9506-1 and ISO 9506-2) and ISO /IEC 8802-3
DL/T 1085 Technical conditions of automatic hydrological data measuring and reporting system
DL/T 1547 Technical Guidelines for Smart Hydropower Plants
NB/T 35001 Cascade Hydropower Station Water Dispatching Automation System Design Specification
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Integrated management and control platform
Provide unified data management, service and interface customization for the operation and management of hydropower plants, realize data sharing, centralized management and control, and collaborative interaction
Dynamic software and hardware platform.
Note. Equipment and function modeling based on the control, protection and monitoring information model of smart hydropower plants, consisting of data services, basic services, and basic applications.
The application can be configured as required. It can be distributed and deployed in safety zone I, safety zone II and management information area for equipment or system access and application component operation
The line provides a standard interface.
3.2
Application components
An independent function module that completes specific application functions and supports plug-in configuration.
Note. Components can be maintained and upgraded separately without affecting other components.
4 Basic requirements
4.1 The platform should be incorporated into the unified planning and synchronous design of smart hydropower plants, and comply with DL/T 1547.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 39264-2020_English be delivered?Answer: Upon your order, we will start to translate GB/T 39264-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 39264-2020_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 39264-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|