HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB/T 37911.1-2019 PDF English

US$599.00 · In stock · Download in 9 seconds
GB/T 37911.1-2019: Application interface of BDS timing for power system -- Part 1: Technical specification
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB/T 37911.1-2019English599 Add to Cart 5 days Application interface of BDS timing for power system -- Part 1: Technical specification Valid

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB/T 37911.1-2019
      

Similar standards

JT/T 808   JT/T 1078   GB/T 19392   GB/T 14733.10   

GB/T 37911.1-2019: Application interface of BDS timing for power system -- Part 1: Technical specification


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT37911.1-2019
(Power system Beidou satellite timing application interface Part 1. Technical specifications) ICS 33.200 M50 National Standards of People's Republic of China Power system Beidou satellite timing application interface Part 1. Technical specifications ApplicationinterfaceofBDStimingforpowersystem- Part 1. Technicalspecification Published on.2019-08-30 2020-03-01 implementation State market supervision and administration China National Standardization Administration issued Content Foreword III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Abbreviations 3 5 composition 4 5.1 Overview 4 5.2 Beidou satellite timing time synchronization device composition 4 5.3 Beidou satellite timing application interface composition 5 6 Technical requirements 5 6.1 Interface 5 6.2 Function 12 6.3 Environmental conditions 12 6.4 Power Adaptability 13 6.5 Insulation performance 13 6.6 Mechanical properties 14 6.7 Electromagnetic compatibility 14 Appendix A (Normative Appendix) Interactive Interface Protocol for Receiving Units 16 Appendix B (normative appendix) IRIG-B code symbol definition and waveform 23

Foreword

GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is divided into the following two parts. --- Part 1. Technical specifications; --- Part 2. Test specifications. This part is the first part of GB/T 37911. This part is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents. This part is proposed and managed by the Ministry of Industry and Information Technology of the People's Republic of China. This section drafted by. State Grid Electric Power Research Institute, China Electronics Technology Standardization Institute, North China Electric Power Design Institute Co., Ltd., Home Power Dispatching Communication Center, Zhengzhou Wickham Technology Co., Ltd., Beijing Sifang Jibao Automation Co., Ltd., Shandong Kehui Automation Co., Ltd., China Southern Power Grid Super High Voltage Transmission Company, Beidou Tianhui (Beijing) Technology Co., Ltd., China Power Institute of Science, Guodian NARI Technology Co., Ltd., China Electronics Technology Group Corporation, the 54th Research Institute. The main drafters of this section. Yu Yuehai, Chen Qian, Zhang Daonong, Nan Guilin, Yang Yuqing, Hu Wei, Shi Yuxiang, Li Jing, Liu Lin, Zhang Lipei, Lu Tianjian, Zhang Yinan, Liu Hongqing, Kong Honglei, Zhou Jie, Du Hui.

introduction

The purpose of compiling GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is to standardize the Beidou satellite navigation system as a standard The application of quasi-time source in China's power system, and clarify the technical requirements and detection methods of the power system for the Beidou satellite timing application interface. Multi-time source management of strong power systems to meet the needs of power system for time synchronization, improve power system security and stability control and accident analysis Level, adapt to the needs of the development of China's power system. Power system Beidou satellite timing application interface Part 1. Technical specifications

1 Scope

This part of GB/T 37911 specifies the composition of the power system Beidou satellite timing application interface, and the use of Beidou satellite timing Technical requirements for time synchronization devices. This section applies to the design, development, production and inspection of power system time synchronization systems using Beidou satellite timing.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2887-2011 General specification for computer sites GB/T 6107-2000 Interface between data terminal equipment and data circuit terminating equipment using serial binary data exchange GB/T 9361-2011 Computer Site Safety Requirements GB/T 11014-1989 Electrical characteristics of balanced voltage digital interface circuits GB/T 13729-2002 Telecontrol terminal equipment GB/T 17626.2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test GB/T 17626.3 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test GB/T 17626.5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test GB/T 17626.6 Electromagnetic compatibility test and measurement technology Conducted disturbance immunity of RF field induction GB/T 17626.8 Electromagnetic compatibility test and measurement technology power frequency magnetic field immunity test GB/T 17626.9 Electromagnetic compatibility test and measurement technology Pulse magnetic field immunity test GB/T 17626.10 Electromagnetic compatibility test and measurement technique - Damping oscillating magnetic field immunity test GB/T 17626.12 Electromagnetic compatibility test and measurement technology ringing wave immunity test GB/T 17626.29 Electromagnetic compatibility test and measurement technology DC power input port voltage dip, short interruption and voltage change Immunity test GB/T 19391-2003 Global Positioning System (GPS) terms and definitions DL/T 1100.1-2018 Time synchronization systems for power systems - Part 1. Technical specification ANSI/T UA/EIA485-A-1998 Electrical Characteristics of Generators and Receivers for Balanced Digital Multipoint Systems (ElectricalChar- acteristicsofGeneratorsandReceiversforUseinBalancedDigitalMultipointSystems) IRIG200-04IRIG serial time code format (IRIGSerialTimeCodeFormats) IEEE1588-2008 Accurate Clock Synchronization Protocol Standard for Network Measurement and Control Systems (StandardforaPrecision ClockSynchronizationProtocolforNetworkedMeasurementandControlSystems) IEEEC37.118-2005 Power System Synchronous Phasor Measurement Standard (Standard for SynchrophasorsforPowerSys- Tems) RFC1305 Network Time Protocol (Ver.3) Specification, Application and Analysis [NetworkTimeProtocol(Version3)Specifi- Cation,ImplementationandAnalysis] RFC2030 Simple Network Time Protocol (SNTP), Ver.4 for IPv4, IPv6, and OSI [SimpleNetworkTime GB/T 37911.1-2019 (Power system Beidou satellite timing application interface Part 1. Technical specifications) ICS 33.200 M50 National Standards of People's Republic of China Power system Beidou satellite timing application interface Part 1. Technical specifications ApplicationinterfaceofBDStimingforpowersystem- Part 1. Technicalspecification Published on.2019-08-30 2020-03-01 implementation State market supervision and administration China National Standardization Administration issued Content Foreword III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Abbreviations 3 5 composition 4 5.1 Overview 4 5.2 Beidou satellite timing time synchronization device composition 4 5.3 Beidou satellite timing application interface composition 5 6 Technical requirements 5 6.1 Interface 5 6.2 Function 12 6.3 Environmental conditions 12 6.4 Power Adaptability 13 6.5 Insulation performance 13 6.6 Mechanical properties 14 6.7 Electromagnetic compatibility 14 Appendix A (Normative Appendix) Interactive Interface Protocol for Receiving Units 16 Appendix B (normative appendix) IRIG-B code symbol definition and waveform 23

Foreword

GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is divided into the following two parts. --- Part 1. Technical specifications; --- Part 2. Test specifications. This part is the first part of GB/T 37911. This part is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents. This part is proposed and managed by the Ministry of Industry and Information Technology of the People's Republic of China. This section drafted by. State Grid Electric Power Research Institute, China Electronics Technology Standardization Institute, North China Electric Power Design Institute Co., Ltd., Home Power Dispatching Communication Center, Zhengzhou Wickham Technology Co., Ltd., Beijing Sifang Jibao Automation Co., Ltd., Shandong Kehui Automation Co., Ltd., China Southern Power Grid Super High Voltage Transmission Company, Beidou Tianhui (Beijing) Technology Co., Ltd., China Power Institute of Science, Guodian NARI Technology Co., Ltd., China Electronics Technology Group Corporation, the 54th Research Institute. The main drafters of this section. Yu Yuehai, Chen Qian, Zhang Daonong, Nan Guilin, Yang Yuqing, Hu Wei, Shi Yuxiang, Li Jing, Liu Lin, Zhang Lipei, Lu Tianjian, Zhang Yinan, Liu Hongqing, Kong Honglei, Zhou Jie, Du Hui.

introduction

The purpose of compiling GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is to standardize the Beidou satellite navigation system as a standard The application of quasi-time source in China's power system, and clarify the technical requirements and detection methods of the power system for the Beidou satellite timing application interface. Multi-time source management of strong power systems to meet the needs of power system for time synchronization, improve power system security and stability control and accident analysis Level, adapt to the needs of the development of China's power system. Power system Beidou satellite timing application interface Part 1. Technical specifications

1 Scope

This part of GB/T 37911 specifies the composition of the power system Beidou satellite timing application interface, and the use of Beidou satellite timing Technical requirements for time synchronization devices. This section applies to the design, development, production and inspection of power system time synchronization systems using Beidou satellite timing.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2887-2011 General specification for computer sites GB/T 6107-2000 Interface between data terminal equipment and data circuit terminating equipment using serial binary data exchange GB/T 9361-2011 Computer Site Safety Requirements GB/T 11014-1989 Electrical characteristics of balanced voltage digital interface circuits GB/T 13729-2002 Telecontrol terminal equipment GB/T 17626.2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test GB/T 17626.3 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test GB/T 17626.5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test GB/T 17626.6 Electromagnetic compatibility test and measurement technology Conducted disturbance immunity of RF field induction GB/T 17626.8 Electromagnetic compatibility test and measurement technology power frequency magnetic field immunity test GB/T 17626.9 Electromagnetic compatibility test and measurement technology Pulse magnetic field immunity test GB/T 17626.10 Electromagnetic compatibility test and measurement technique - Damping oscillating magnetic field immunity test GB/T 17626.12 Electromagnetic compatibility test and measurement technology ringing wave immunity test GB/T 17626.29 Electromagnetic compatibility test and measurement technology DC power input port voltage dip, short interruption and voltage change Immunity test GB/T 19391-2003 Global Positioning System (GPS) terms and definitions DL/T 1100.1-2018 Time synchronization systems for power systems - Part 1. Technical specification ANSI/T UA/EIA485-A-1998 Electrical Characteristics of Generators and Receivers for Balanced Digital Multipoint Systems (ElectricalChar- acteristicsofGeneratorsandReceiversforUseinBalancedDigitalMultipointSystems) IRIG200-04IRIG serial time code format (IRIGSerialTimeCodeFormats) IEEE1588-2008 Accurate Clock Synchronization Protocol Standard for Network Measurement and Control Systems (StandardforaPrecision ClockSynchronizationProtocolforNetworkedMeasurementandControlSystems) IEEEC37.118-2005 Power System Synchronous Phasor Measurement Standard (Standard for SynchrophasorsforPowerSys- Tems) RFC1305 Network Time Protocol (Ver.3) Specification, Application and Analysis [NetworkTimeProtocol(Version3)Specifi- Cation,ImplementationandAnalysis] RFC2030 Simple Network Time Protocol (SNTP), Ver.4 for IPv4, IPv6, and OSI [SimpleNetworkTime ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB/T 37911.1-2019 be delivered?

Answer: The full copy PDF of English version of GB/T 37911.1-2019 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 37911.1-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 37911.1-2019_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB/T 37911.1-2019 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of GB/T 37911.1-2019?

A step-by-step guide to download PDF of GB/T 37911.1-2019_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 37911.1-2019".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9