GB/T 37911.1-2019 PDF English
US$599.00 · In stock · Download in 9 secondsGB/T 37911.1-2019: Application interface of BDS timing for power system -- Part 1: Technical specification Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
GB/T 37911.1-2019 | English | 599 |
Add to Cart
|
5 days
|
Application interface of BDS timing for power system -- Part 1: Technical specification
| Valid |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 37911.1-2019
GB/T 37911.1-2019: Application interface of BDS timing for power system -- Part 1: Technical specification ---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT37911.1-2019
(Power system Beidou satellite timing application interface Part 1. Technical specifications)
ICS 33.200
M50
National Standards of People's Republic of China
Power system Beidou satellite timing application interface
Part 1. Technical specifications
ApplicationinterfaceofBDStimingforpowersystem-
Part 1. Technicalspecification
Published on.2019-08-30
2020-03-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 2
4 Abbreviations 3
5 composition 4
5.1 Overview 4
5.2 Beidou satellite timing time synchronization device composition 4
5.3 Beidou satellite timing application interface composition 5
6 Technical requirements 5
6.1 Interface 5
6.2 Function 12
6.3 Environmental conditions 12
6.4 Power Adaptability 13
6.5 Insulation performance 13
6.6 Mechanical properties 14
6.7 Electromagnetic compatibility 14
Appendix A (Normative Appendix) Interactive Interface Protocol for Receiving Units 16
Appendix B (normative appendix) IRIG-B code symbol definition and waveform 23
Foreword
GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is divided into the following two parts.
--- Part 1. Technical specifications;
--- Part 2. Test specifications.
This part is the first part of GB/T 37911.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents.
This part is proposed and managed by the Ministry of Industry and Information Technology of the People's Republic of China.
This section drafted by. State Grid Electric Power Research Institute, China Electronics Technology Standardization Institute, North China Electric Power Design Institute Co., Ltd.,
Home Power Dispatching Communication Center, Zhengzhou Wickham Technology Co., Ltd., Beijing Sifang Jibao Automation Co., Ltd., Shandong Kehui
Automation Co., Ltd., China Southern Power Grid Super High Voltage Transmission Company, Beidou Tianhui (Beijing) Technology Co., Ltd., China Power
Institute of Science, Guodian NARI Technology Co., Ltd., China Electronics Technology Group Corporation, the 54th Research Institute.
The main drafters of this section. Yu Yuehai, Chen Qian, Zhang Daonong, Nan Guilin, Yang Yuqing, Hu Wei, Shi Yuxiang, Li Jing, Liu Lin, Zhang Lipei, Lu Tianjian,
Zhang Yinan, Liu Hongqing, Kong Honglei, Zhou Jie, Du Hui.
introduction
The purpose of compiling GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is to standardize the Beidou satellite navigation system as a standard
The application of quasi-time source in China's power system, and clarify the technical requirements and detection methods of the power system for the Beidou satellite timing application interface.
Multi-time source management of strong power systems to meet the needs of power system for time synchronization, improve power system security and stability control and accident analysis
Level, adapt to the needs of the development of China's power system.
Power system Beidou satellite timing application interface
Part 1. Technical specifications
1 Scope
This part of GB/T 37911 specifies the composition of the power system Beidou satellite timing application interface, and the use of Beidou satellite timing
Technical requirements for time synchronization devices.
This section applies to the design, development, production and inspection of power system time synchronization systems using Beidou satellite timing.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2887-2011 General specification for computer sites
GB/T 6107-2000 Interface between data terminal equipment and data circuit terminating equipment using serial binary data exchange
GB/T 9361-2011 Computer Site Safety Requirements
GB/T 11014-1989 Electrical characteristics of balanced voltage digital interface circuits
GB/T 13729-2002 Telecontrol terminal equipment
GB/T 17626.2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test
GB/T 17626.3 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test
GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test
GB/T 17626.5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test
GB/T 17626.6 Electromagnetic compatibility test and measurement technology Conducted disturbance immunity of RF field induction
GB/T 17626.8 Electromagnetic compatibility test and measurement technology power frequency magnetic field immunity test
GB/T 17626.9 Electromagnetic compatibility test and measurement technology Pulse magnetic field immunity test
GB/T 17626.10 Electromagnetic compatibility test and measurement technique - Damping oscillating magnetic field immunity test
GB/T 17626.12 Electromagnetic compatibility test and measurement technology ringing wave immunity test
GB/T 17626.29 Electromagnetic compatibility test and measurement technology DC power input port voltage dip, short interruption and voltage change
Immunity test
GB/T 19391-2003 Global Positioning System (GPS) terms and definitions
DL/T 1100.1-2018 Time synchronization systems for power systems - Part 1. Technical specification
ANSI/T UA/EIA485-A-1998 Electrical Characteristics of Generators and Receivers for Balanced Digital Multipoint Systems (ElectricalChar-
acteristicsofGeneratorsandReceiversforUseinBalancedDigitalMultipointSystems)
IRIG200-04IRIG serial time code format (IRIGSerialTimeCodeFormats)
IEEE1588-2008 Accurate Clock Synchronization Protocol Standard for Network Measurement and Control Systems (StandardforaPrecision
ClockSynchronizationProtocolforNetworkedMeasurementandControlSystems)
IEEEC37.118-2005 Power System Synchronous Phasor Measurement Standard (Standard for SynchrophasorsforPowerSys-
Tems)
RFC1305 Network Time Protocol (Ver.3) Specification, Application and Analysis [NetworkTimeProtocol(Version3)Specifi-
Cation,ImplementationandAnalysis]
RFC2030 Simple Network Time Protocol (SNTP), Ver.4 for IPv4, IPv6, and OSI [SimpleNetworkTime
GB/T 37911.1-2019
(Power system Beidou satellite timing application interface Part 1. Technical specifications)
ICS 33.200
M50
National Standards of People's Republic of China
Power system Beidou satellite timing application interface
Part 1. Technical specifications
ApplicationinterfaceofBDStimingforpowersystem-
Part 1. Technicalspecification
Published on.2019-08-30
2020-03-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 2
4 Abbreviations 3
5 composition 4
5.1 Overview 4
5.2 Beidou satellite timing time synchronization device composition 4
5.3 Beidou satellite timing application interface composition 5
6 Technical requirements 5
6.1 Interface 5
6.2 Function 12
6.3 Environmental conditions 12
6.4 Power Adaptability 13
6.5 Insulation performance 13
6.6 Mechanical properties 14
6.7 Electromagnetic compatibility 14
Appendix A (Normative Appendix) Interactive Interface Protocol for Receiving Units 16
Appendix B (normative appendix) IRIG-B code symbol definition and waveform 23
Foreword
GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is divided into the following two parts.
--- Part 1. Technical specifications;
--- Part 2. Test specifications.
This part is the first part of GB/T 37911.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents.
This part is proposed and managed by the Ministry of Industry and Information Technology of the People's Republic of China.
This section drafted by. State Grid Electric Power Research Institute, China Electronics Technology Standardization Institute, North China Electric Power Design Institute Co., Ltd.,
Home Power Dispatching Communication Center, Zhengzhou Wickham Technology Co., Ltd., Beijing Sifang Jibao Automation Co., Ltd., Shandong Kehui
Automation Co., Ltd., China Southern Power Grid Super High Voltage Transmission Company, Beidou Tianhui (Beijing) Technology Co., Ltd., China Power
Institute of Science, Guodian NARI Technology Co., Ltd., China Electronics Technology Group Corporation, the 54th Research Institute.
The main drafters of this section. Yu Yuehai, Chen Qian, Zhang Daonong, Nan Guilin, Yang Yuqing, Hu Wei, Shi Yuxiang, Li Jing, Liu Lin, Zhang Lipei, Lu Tianjian,
Zhang Yinan, Liu Hongqing, Kong Honglei, Zhou Jie, Du Hui.
introduction
The purpose of compiling GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is to standardize the Beidou satellite navigation system as a standard
The application of quasi-time source in China's power system, and clarify the technical requirements and detection methods of the power system for the Beidou satellite timing application interface.
Multi-time source management of strong power systems to meet the needs of power system for time synchronization, improve power system security and stability control and accident analysis
Level, adapt to the needs of the development of China's power system.
Power system Beidou satellite timing application interface
Part 1. Technical specifications
1 Scope
This part of GB/T 37911 specifies the composition of the power system Beidou satellite timing application interface, and the use of Beidou satellite timing
Technical requirements for time synchronization devices.
This section applies to the design, development, production and inspection of power system time synchronization systems using Beidou satellite timing.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2887-2011 General specification for computer sites
GB/T 6107-2000 Interface between data terminal equipment and data circuit terminating equipment using serial binary data exchange
GB/T 9361-2011 Computer Site Safety Requirements
GB/T 11014-1989 Electrical characteristics of balanced voltage digital interface circuits
GB/T 13729-2002 Telecontrol terminal equipment
GB/T 17626.2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test
GB/T 17626.3 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test
GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test
GB/T 17626.5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test
GB/T 17626.6 Electromagnetic compatibility test and measurement technology Conducted disturbance immunity of RF field induction
GB/T 17626.8 Electromagnetic compatibility test and measurement technology power frequency magnetic field immunity test
GB/T 17626.9 Electromagnetic compatibility test and measurement technology Pulse magnetic field immunity test
GB/T 17626.10 Electromagnetic compatibility test and measurement technique - Damping oscillating magnetic field immunity test
GB/T 17626.12 Electromagnetic compatibility test and measurement technology ringing wave immunity test
GB/T 17626.29 Electromagnetic compatibility test and measurement technology DC power input port voltage dip, short interruption and voltage change
Immunity test
GB/T 19391-2003 Global Positioning System (GPS) terms and definitions
DL/T 1100.1-2018 Time synchronization systems for power systems - Part 1. Technical specification
ANSI/T UA/EIA485-A-1998 Electrical Characteristics of Generators and Receivers for Balanced Digital Multipoint Systems (ElectricalChar-
acteristicsofGeneratorsandReceiversforUseinBalancedDigitalMultipointSystems)
IRIG200-04IRIG serial time code format (IRIGSerialTimeCodeFormats)
IEEE1588-2008 Accurate Clock Synchronization Protocol Standard for Network Measurement and Control Systems (StandardforaPrecision
ClockSynchronizationProtocolforNetworkedMeasurementandControlSystems)
IEEEC37.118-2005 Power System Synchronous Phasor Measurement Standard (Standard for SynchrophasorsforPowerSys-
Tems)
RFC1305 Network Time Protocol (Ver.3) Specification, Application and Analysis [NetworkTimeProtocol(Version3)Specifi-
Cation,ImplementationandAnalysis]
RFC2030 Simple Network Time Protocol (SNTP), Ver.4 for IPv4, IPv6, and OSI [SimpleNetworkTime
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 37911.1-2019 be delivered?Answer: The full copy PDF of English version of GB/T 37911.1-2019 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 37911.1-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37911.1-2019_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 37911.1-2019 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of GB/T 37911.1-2019?A step-by-step guide to download PDF of GB/T 37911.1-2019_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB/T 37911.1-2019". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|