US$439.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 33349-2016: General specification for gas electric power plant system with reciprocating internal combustion engines Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 33349-2016 | English | 439 |
Add to Cart
|
4 days [Need to translate]
|
General specification for gas electric power plant system with reciprocating internal combustion engines
| Valid |
GB/T 33349-2016
|
PDF similar to GB/T 33349-2016
Basic data | Standard ID | GB/T 33349-2016 (GB/T33349-2016) | | Description (Translated English) | General specification for gas electric power plant system with reciprocating internal combustion engines | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K59 | | Classification of International Standard | 29.160.40 | | Word Count Estimation | 22,238 | | Date of Issue | 2016-12-13 | | Date of Implementation | 2017-07-01 | | Regulation (derived from) | National Standard Notice No.304 of 2016 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 33349-2016: General specification for gas electric power plant system with reciprocating internal combustion engines ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General specification for gas electric power plant system with reciprocating internal combustion engines
ICS 29.160.40
K59
National Standards of People's Republic of China
General technical conditions for reciprocating internal combustion gas power plant system
2016-12-13 released
2017-07-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Management Committee released
Directory
Preface III
1 Scope 1
2 normative reference document 1
3 Terms and definitions 2
4 General 2
5 scale 3
6 Gas Generating Set 3
6.1 Selection Principle 3
6.2 Performance requirements 3
6.3 Structural requirements 4
6.4 Equipment layout 4
7 gas supply system 4
7.1 General 4
7.2 Gas purification 5
7.3 Regulator 5
7.4 Fire and explosion proof 6
7.5 LNG gasification 6
7.6 Gas Dispersion 6
8 lubrication system
9 cooling system 7
9.1 Choice of cooling method 7
9.2 Technical requirements 7
9.3 cooling medium 7
Calculation of Circulation of Coolant
9.5 Waste heat utilization system 8
10 starting system
11 intake and exhaust system 9
11.1 Air intake system 9
11.2 Exhaust system 9
Monitoring and Information System
12.1 General 9
System Configuration and Control
12.3 Testing and instrumentation 10
12.4 Control, alarm and protection
12.5 Thermal power supply 12
12.6 Control room 12
12.7 Cable, conduit and in-place equipment layout 12
13 electrical system
13.1 Electrical main wiring 12
13.2 Grid connection and operation 13
13.3 Power distribution unit 13
13.4 Station Power System
13.5 Secondary wiring 14
13.6 Relay protection and safety automatic device 14
13.7 Energy Metering 14
13.8 lighting 14
13.9 Electrical installations that blast the fire hazard environment
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by China Electrical Equipment Industry Association.
This standard is nationalized by the National Reciprocating Internal Combustion Gas Power Equipment Standardization Technical Committee (SAC/TC372).
The drafting unit of this standard. China Petroleum Group Ji Chai Power Plant, Zibo Zibai New Energy Co., Ltd., Henan Diesel Heavy Industries Co., Ltd.
Any company, Jinan Diesel Engine Co., Ltd., China Coal Handan Design Engineering Co., Ltd., China Petroleum Group Engineering Design Co., Ltd.
North China branch.
The main drafters of this standard. Wang Lingjin, Liu Dong, Xu Chuanguo, Wang Jing, Yang Saqing, Yu Xiaoyan, Zhu Haili, Sun Chenglei, Yang Junhui, Cai Feng,
HUANG Yan-fei, NIE Zhi-bin, GAO Xu-wei, REN Xiao-hui, CHEN Zuo-jun, ZHANG Hong-yan
General technical conditions for reciprocating internal combustion gas power plant system
1 Scope
This standard specifies the overall requirements for reciprocating internal combustion gas power plant systems, gas generators, gas supply systems, lubrication systems, cooling
Systems, start-up systems, intake and exhaust systems, monitoring and information systems, and electrical systems.
This standard is applicable to land-based reciprocating internal combustion gas power plant system with combustible gas as fuel.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB/T 2820.5 Reciprocating internal combustion engine driven alternators - Part 5. Generators
GB 3096 sound environmental quality standards
Comprehensive Emission Standard for Wastewater
Standard for local vibration of workplace GB 10434
Standard for Environmental Noise Discharge of Industrial Enterprises
GB/T 20368 Production, storage and shipment of liquefied natural gas (LNG)
Natural gas - fired generating units for petroleum industry GB/T
GB/T 29487 high-power gas generator
GB/T 29488 high-power biogas generator
Code for design of waste heat utilization system for reciprocating internal combustion gas power station GB/T 30138
Code for design of outdoor water supply GB 50013
Code for fire protection of building design GB 50016
Code for design of heating, ventilation and air conditioning for industrial buildings GB 50019
Code for design of town gas GB 50028
GB 50040 Power Machine Foundation Design Code
Code for design of small thermal power plant GB 50049
Code for design of lightning protection for buildings GB 50057
GB 50058 Design Code for Explosive Hazardous Environment (with description)
Code for design of high - voltage distribution equipment of GB 50060 3 ~ 110kV
Code for design of relay protection and automatic device for GB/T 50062 electrical installations
Code for design of electrical measuring instruments for GB/T 50063 electrical installations
Code for design of overvoltage protection and insulation mating of GB/T 50064 AC electrical installations (with explanatory notes)
Code for grounding design of GB/T 50065 AC electrical installations
GB/T 50087 Code for design of noise control for industrial enterprises (with description)
GB 50116 fire automatic alarm system design specifications (with description)
Code for design of building fire extinguisher GB 50140
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 33349-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 33349-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 33349-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 33349-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|