|
US$259.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 31201-2014: Complex fertilizer (slow control release) production complete equipment Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 31201-2014 | English | 259 |
Add to Cart
|
3 days [Need to translate]
|
Complex fertilizer (slow control release) production complete equipment
| Valid |
GB/T 31201-2014
|
PDF similar to GB/T 31201-2014
Basic data | Standard ID | GB/T 31201-2014 (GB/T31201-2014) | | Description (Translated English) | Complex fertilizer (slow control release) production complete equipment | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | G93 | | Classification of International Standard | 71.120.10; 75.180.20; 23.020.30 | | Word Count Estimation | 11,191 | | Date of Issue | 9/3/2014 | | Date of Implementation | 3/1/2015 | | Quoted Standard | GB 2440; GB 2894; GB/T 3797-2005; GB/T 6003.1; GB 6549; GB/T 8170-2008; GB 8569; GB/T 9969; GB/T 13306; GB/T 13384; GB 15063; GB/T 18831; GB 20413; GB/T 23348; GB 50231; GB 50235; GB 50236; GB 50254; GBZ/T 192.1; WS/T 69; SH 3022 | | Regulation (derived from) | People's Republic of China Announcement of Newly Approved National Standards No. 21 of 2014 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies fertilizer (slow release) the terms and definitions of production equipment, models, requirements, test methods, inspection rules, marking, packaging, transport and storage. This Standard is applicable to drum granulation, spray gr |
GB/T 31201-2014: Complex fertilizer (slow control release) production complete equipment---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Complex fertilizer (slow control release) production complete equipment
ICS 71.120.10; 75.180.20; 23.020.30
G93
National Standards of People's Republic of China
Fertilizer (slow release) production equipment
Issued on. 2014-09-03
2015-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Model 2
5 Requirement 2
5.1 General Technical Requirements 2
5.2 sets requirements 2
5.3 Installation Requirements 3
5.4 Safety Requirements 3
5.5 Performance Indicators 4
6 4 Installation and commissioning acceptance
4 6.1 Installation and acceptance
6.2 stand-alone, no-load test acceptance linkage 4
6.3 Operational Acceptance load 4
7 Test Method 4
7.1 Determination of the production capacity of 4
7.2 Determination of the particle size sieving --- 5
7.3 Moisture 5
7.4 Determination of dust 5
7.5 Noise measurement 6
7.6 tons of fertilizer consumption measured 6
8 6 Inspection Rules
8.1 Batch 6
8.2 Sample 6
8.3 Inspection 6
8.4 Identification and retest 6
8.5 Test Report 7
9 signs, packaging, transportation and storage 7
9.1 mark 7
9.2 Packaging 7
9.3 Transport 7
9.4 Storage 7
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Petroleum and Chemical Industry Association.
This standard by the National Standardization Technical Committee of Chemical Machinery and Equipment (SAC/TC429) centralized.
This standard was drafted. Jiangsu Rui Ante Machinery Group Co., Ltd., Shanghai Chemical Industry Research Institute.
The main drafters of this standard. Zhou Jianwei, Zhang, Lu Yuping, Zhou Yuekui, Zhengrui Hong, Caowei Yu, Chen Hong, Liu Peidong.
Fertilizer (slow release) production equipment
1 Scope
This standard specifies the fertilizer (slow release) production equipment of terms and definitions, models, requirements, test methods, inspection rules, marking,
Packaging, transport and storage.
This standard applies to drum granulation, spray granulation production of compound fertilizer (slow release) of complete sets of equipment.
This standard does not apply to the production of compound fertilizer tower granulation method (slow release) of complete sets of equipment.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 2440 urea
GB 2894 Safety Signs and use guidelines
GB/T 3797-2005 Electric Control Equipment
GB/T 6003.1 Test sieves - Technical requirements and testing - Part 1. Test sieves of metal wire cloth
GB 6549 potassium chloride
GB/T 8170-2008 revised value represents about rules and limit values \u200b\u200band judgment
GB 8569 solid chemical fertilizers Packaging
GB/T 9969 General Instructions industrial products
GB/T 13306 signs
GB/T 13384 mechanical and electrical products packaging General technical conditions
GB 15063 compound fertilizers (compound fertilizer)
Device design and selection principles interlock GB/T 18831 mechanical belt guards
GB 20413 superphosphate
GB/T 23348 slow release fertilizer
GB 50231 mechanical equipment installation construction and acceptance of universal norms
GB 50235 industrial metal pipeline construction norms
GB 50236 field equipment, industrial pipe welding engineering for construction
GB 50254 electrical low-voltage electrical equipment installation engineering construction and acceptance
GB Z/T 192.1 Determination of dust in the air of workplace Part 1. The total dust concentration
SH3022 petrochemical equipment and pipeline corrosion coating Technical Specification
WS/T 69 for measurement of workplace noise
3 Terms and Definitions
The following terms and definitions apply to this document.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 31201-2014_English be delivered?Answer: Upon your order, we will start to translate GB/T 31201-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 31201-2014_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 31201-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|