|
US$329.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 30244-2013: Oscillographic polarograph and its test solution Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 30244-2013 | English | 329 |
Add to Cart
|
3 days [Need to translate]
|
Oscillographic polarograph and its test solution
| Valid |
GB/T 30244-2013
|
PDF similar to GB/T 30244-2013
Basic data | Standard ID | GB/T 30244-2013 (GB/T30244-2013) | | Description (Translated English) | Oscillographic polarograph and its test solution | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | N53 | | Classification of International Standard | 71.040.10 | | Word Count Estimation | 14,132 | | Quoted Standard | GB/T 191-2008; GB/T 2829-2002; GB 4793.1-2007; GB/T 11606-2007; GB/T 13384-2008 | | Regulation (derived from) | National Standards Bulletin 2013 No. 27 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the oscilloscope polarograph (hereinafter referred to as the instrument) requirements, test methods, inspection rules, marking, preparation of packaging, transport and storage and testing. This standard applies to polarographic ana |
GB/T 30244-2013: Oscillographic polarograph and its test solution---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Oscillographic polarograph and its test solution
ICS 71.040.10
N53
National Standards of People's Republic of China
Oscilloscope Polarograph and preparation of the test solution
Issued on. 2013-12-31
2014-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Machinery Industry Federation.
This standard by the national industrial process measurement and control Standardization Technical Committee (SAC/TC124) centralized.
This standard was drafted. Chengdu Instrument Factory, China Institute of Metrology, Qiqihar Medical School.
The main drafters of this standard. Shan-present, Yu Yonghui, Shinai Jie, Zhang Rong.
Oscilloscope Polarograph and preparation of the test solution
1 Scope
This standard specifies the oscilloscope pole spectrometer (hereinafter referred to as equipment) requirements, test methods, inspection rules, marking, packaging, transportation and storage and
Its preparation test solution.
This standard applies to polarographic analysis in the laboratory Oscillo Polarograph and preparation of test solution.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 191-2008 Packaging - Pictorial signs
GB/T 2829-2002 periodic inspection Sampling procedures and tables (suitable for process stability test)
GB 4793.1-2007 measurement, control and laboratory use safety requirements for electrical equipment - Part 1. General requirements
GB/T 11606-2007 analytical instruments environmental test methods
GB/T 13384-2008 mechanical and electrical products packaging General technical conditions
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Oscilloscope Polarograph oscilographicpolarograph
Fast linear single scan Polarograph mercury drop in the growth process. It must be observed and recorded by means of an oscilloscope polarographic FIG. Classical
Polarography diagram, its graphics to peak shape, peak potential by the qualitative and quantitative peak current.
4 Requirements
4.1 normal operating conditions of the instrument
The instrument should work under the following conditions.
a) Ambient temperature. 5 ℃ ~ 40 ℃;
b) Relative humidity. less than 85%;
c) Power supply. 220V ± 22V, 50Hz ± 1Hz;
d) away from the mechanical vibration and shock;
e) no strong electromagnetic interference.
4.2 Appearance
The appearance of the instrument shall meet the following requirements.
Appearance a) the instrument should be smooth, surface coating, no coating peeling, scratches, dirt and exposed at the end;
b) all nameplates and durable signs should be clear and consistent with the content of the relevant regulations and standards;
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30244-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 30244-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 30244-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30244-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|