Automation systems in the process industry -- Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
| Valid |
GB/T 25928-2010
|
PDF similar to GB/T 25928-2010
Basic data | Standard ID | GB/T 25928-2010 (GB/T25928-2010) | | Description (Translated English) | Automation systems in the process industry -- Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | N10 | | Classification of International Standard | 25.040.40 | | Word Count Estimation | 36,378 | | Date of Issue | 1/14/2011 | | Date of Implementation | 5/1/2011 | | Adopted Standard | IEC 62381-2006, IDT | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 2 of 2011 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the side factory acceptance test (FAT), site acceptance test (SAT) and site integration testing (SIT) procedures and standards. These tests are fully automated control system in order to prove compliance with standards. Engineering and system testing prior to production activities not within This Standard is applicable to a range of the content of this standard can be used as guidance in practical work, the actual requirements for a variety of processes, plant and equipment. Figure 1 depicts a typical sequence of activities and events throughout the Figure 2 and FIG. 3 shows the relationship between the various stages. |
GB/T 25928-2010: Automation systems in the process industry -- Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Automation systems in the process industry.Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
ICS 25.040.40
N10
National Standards of People's Republic of China
Industrial process automation systems
Factory Acceptance Test (FAT), site acceptance
Test (SAT), a comprehensive field test (SIT) specification
Factoryacceptancetest (FAT),
siteacceptancetest (SAT), andsiteintegrationtest (SIT)
(IEC 62381.2006, IDT)
Issued on. 2011-01-14
2011-05-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
Introduction Ⅱ
1 Scope 1
2 Terms and definitions 2
3 Acronyms 3
We must be prepared prior to the implementation work FAT 4 3
4.1 File owner/general contractor usually prepared 4
File 4.2 Suppliers usually prepare 4
5 Factory Acceptance Test FAT 4
5.1 General 4
5.2 FAT test schedule 5
5.3 Test procedure 5
5.4 FAT's review 7
5.5 FAT file (see Appendix A) 7
6 Site Acceptance Test SAT 8
6.1 General 8
6.2 SAT test schedule 8
Comprehensive field testing SIT 8 7
7.1 General 8
7.2 SIT test schedule 8
Appendix A (informative) Factory Acceptance Test (FAT) Test Table 10
Annex B (informative) Site Acceptance Test (SAT) Test Table 22
Annex C (informative) Comprehensive field testing (SIT) Checklists 23
Appendix D (Informative Appendix) FAT 24 certificate
Appendix E (Informative Appendix) SAT 25 certificate
Appendix F (Informative Appendix) SIT certificate 26
Annex G (informative) automation systems acceptance certificate 27
Appendix H (Informative Appendix) FAT does not meet the entry table 28
Annex I (Information Appendix) SAT does not meet the entry table 29
Appendix J (Informative Appendix) SIT does not meet the entry table 30
Foreword
This standard is identical with IEC 62381.2006 "industrial process automation systems --- factory acceptance test (FAT), site acceptance test
(SAT), a comprehensive field test (SIT) Specification "(in English).
This standard is equivalent translation IEC 62381.2006, there was no difference in the technical content, for the convenience of users, with the structure of the text
On appropriately adjusted, according to GB/T 1.1-2000 "Standardization Guide Part 1. Structure and rules are written standard" and
GB/T 20000.2-2001. the relevant provisions of "Standardization Guide Part 2 rules of international standards" were editorial
modify.
This standard is mainly made editorial changes as follows.
a) Remove the preface to the international standards;
b) "The document" to the "standard";
c) according to GB/T 1.1-2000 column entry requirements (5.2.5), within the full range of punctuation column item regulate, and
Two items listed in section 5.3.2 increases the number for identification.
The Standard Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G, Appendix H, Appendix I, Appendix J for information only
appendix.
The standard proposed by China Machinery Industry Federation.
This standard by the national industrial process measurement and control Standardization Technical Committee (SAC/TC124) centralized.
This standard is drafted by. Shanghai Institute of Industrial Automation Instrumentation.
Participated in the drafting of this standard. Shanghai Siemens Industrial Automation Ltd., Shanghai Emerson Process Management, Shanghai Municipal
Engineering Design Institute, Jiang Su Jinzhi Technologies AG, Shanghai Hyde controlling stake in the company, Tokyo Electric Power Automation Co., Ltd. Shanghai, Parker
Environmental Technology (Shanghai) Co., Ltd., Information Science and Engineering, East China University of Technology, Shanghai Automation Instrumentation System Inspection and Testing Institute.
The main drafters of this standard. Xu Qing, Zhang Guangping, Miao Xueqin, Chen Tingjiong, WU Guo-wei, Gao Ming, Wu Yaqi.
Participate drafters of this standard. Li Minghua, Gu Xing-sheng, Wang Ou, Yan Wei of cotinine, stone beads, Liu Jingbo, Luzu Ming, Liu Jian, Yifan,
Qiu Xuanzhen.
Introduction
The current field of process control there is such a phenomenon, the period of the Project were asked to compress getting shorter, while the automatic control system
But due to the complexity of the various reasons on the rise, these reasons include the increase relates to the use of communication layers and a variety of new technologies, such as now
Field bus system.
Experience shows, owners, general contractors and subcontractors are often used to distinguish their commitment to the standard by consuming huge Gongben discussions and consultations will have
Help improve the effectiveness and reduce the time to negotiate consultations, the parties can reach a consensus as soon as possible is responsible for their content.
Appendix to this standard contains the testing process may be used in form. These appendices form using Excel format. The standard purchase
After registration, users can copy these forms according to their needs, but the number should not exceed the number of replication specified.
For the pharmaceutical industry, or other highly specialized industrial applications, some special specifications, instructions and constraints existing file with the current
The standard file act together.
Industrial process automation systems
Factory Acceptance Test (FAT), site acceptance
Test (SAT), a comprehensive field test (SIT) specification
1 Scope
This standard defines the factory acceptance test (FAT), site acceptance test (SAT) and site integration testing (SIT) procedures and specifications.
These tests are fully automated control system in order to prove compliance with standards.
Systems engineering and production activities before the test is not within the scope of this standard involved.
The content of this standard can be used as guidance in practical work for a variety of practical requirements of process, plant and equipment. Figure 1 depicts
A typical sequence of events and activities throughout, Figures 2 and 3 shows the relationship between the various stages.
FAT prerequisite.
--- Complete software development;
--- To complete the system connection;
--- Complete Supplier internal testing.
SAT prerequisite.
--- System has been delivered to the Site;
--- Installed correctly;
--- System startup.
SIT prerequisite.
Room --- system is properly connected;
--- To complete the SAT.
Note. In fact, during the construction phase, once the basic components required to complete the installation and start the loop test.
Project nodes corresponding to the FAT 1, SAT and SIT typical sequence of events schematic
Figure 2 DCS subsystem SAT and SIT phase and phase relationship between the schematic
|