GB/T 19072-2022 PDF English
US$995.00 · In stock · Download in 9 secondsGB/T 19072-2022: Wind turbines - Tower Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid GB/T 19072: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
GB/T 19072-2022 | English | 995 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Wind turbines - Tower
| Valid |
GB/T 19072-2010 | English | 719 |
Add to Cart
|
4 days
|
Tower of wind turbine generator system
| Obsolete |
GB/T 19072-2003 | English | 399 |
Add to Cart
|
3 days
|
Wind turbine tower
| Obsolete |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 19072-2022
GB/T 19072-2022: Wind turbines - Tower---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT19072-2022
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 27.180
CCS F 11
Replacing GB/T 19072-2010
Wind turbines - Tower
Issued on: OCTOBER 12, 2022
Implemented on: OCTOBER 12, 2022
Issued by. State Administration for Market Regulation;
Standardization Administration of the People’s Republic of China.
Table of Contents
Foreword... 3
1 Scope... 5
2 Normative references... 5
3 Terms and definitions... 9
4 Symbols and abbreviated terms... 11
5 Design principles... 14
6 Steel tower... 16
7 Concrete tower... 52
Appendix A (Informative) Tower structure damping ratio... 100
Appendix B (Informative) Simplified buckling analysis method for tower door frame
opening... 103
Appendix C (Informative) Fatigue strength analysis of steel tower... 106
Bibliography... 107
Wind turbines - Tower
1 Scope
This document specifies the design principles, design requirements, process
requirements, test methods, inspection rules, completion data and accompanying
documents, marking, packaging, storage and transportation requirements of wind
turbine towers.
This document applies to the design, manufacture, construction and acceptance of
horizontal-axis wind turbine towers.
2 Normative references
The following documents are referred to in the text in such a way that some or all of
their content constitutes requirements of this document. For dated references, only the
version corresponding to that date is applicable to this document; for undated references,
the latest version (including all amendments) is applicable to this document.
GB 175, Common Portland Cements
GB/T 470, Zinc ingots
GB/T 700, Carbon structural steels
GB/T 709, Dimension shape weight and tolerances for hot-rolled steel plates and
sheets
GB/T 985.1, Recommended joint preparation for gas welding, manual metal arc
welding, gas-shield arc welding and beam welding
GB/T 985.2, Recommended joint preparation for submerged arc welding
GB/T 1228, High strength bolts with large hexagon head for steel structures
GB/T 1231, Specifications of high strength bolts with large hexagon head, large
hexagon nuts, plain washers for steel structures
GB/T 1591, High strength low alloy structural steels
GB/T 3098.1, Mechanical properties of fasteners - Bolts, screws and studs
GB/T 3098.2, Mechanical properties of fasteners - Nuts
5 Design principles
5.1 The design service life of the tower shall not be less than the design service life of
the wind turbine.
5.2 The tower shall meet the following functional requirements within the specified
design service life.
-- During normal construction and use, it shall be able to withstand various loads
and effects that may occur;
-- During normal use, it shall have good working performance;
-- Under normal maintenance, it shall have sufficient durability;
-- In case of accidence, the structure shall be able to maintain overall stability.
5.3 The tower load shall be calculated and analyzed in accordance with the relevant
provisions of GB/T 18451.1.
5.4 In addition to the calculation and analysis of tower loads in accordance with 5.3,
additional loads caused by the inclination of the tower and foundation shall also be
considered. The tower inclination caused by factors such as installation, manufacturing
and temperature should be calculated at 5 mm/m, and the tower inclination caused by
factors such as foundation deformation and uneven settlement shall be calculated at 3
mm/m.
5.5 The modal damping ratio of the tower shall be obtained through testing or analysis,
and can be selected by referring to Appendix A during design.
5.6 The tower design shall be calculated and analyzed by selecting the most unfavorable
load condition combination among all design conditions.
5.7 The tower design shall consider the influence of vortex-induced vibration on the
tower when the tower is hoisted, shut down or out of wind. The calculation and analysis
can be carried out according to the method in Appendix E of EN 1991-1-4.2005 or other
methods of the same safety level. The first-order vortex-induced vibration of the tower
shall be considered in the calculation and analysis, and the second-order and higher-
order vortex-induced vibration shall be considered when necessary. Aerodynamic
damping shall not be considered when calculating vortex-induced vibration.
5.8 When the cumulative fatigue damage caused by vortex induction is not greater than
0.1, its influence can be ignored; when the cumulative fatigue damage caused by vortex
induction is greater than 0.1, it shall be superimposed with the cumulative damage
caused by fatigue load. A vortex-breaking structure can be added to the tower to destroy
the vortex induction formation or a damper can be added to reduce the influence of
vortex-induced vibration.
materials meet the design requirements. It can only be implemented after confirmation
by the design unit.
6.1.2.2 Flange
The flange steel shall comply with the provisions of GB/T 1591, and the thickness
direction performance (if required) shall at least comply with the Z25 requirements
specified in GB/T 5313-2010.The ultrasonic testing requirements shall at least comply
with the quality classification level I requirements in NB/T 47013.3-2015.
The quality grade of flange steel shall not be lower than that of tower tube steel. Flanges
shall be forgings. Forging steels shall be steel ingots refined outside the furnace,
vacuum degassed or continuous casting round billets. Continuous casting slabs are not
allowed.
The ordering content, technical requirements, sampling, test methods, inspection rules,
markings, labels and accompanying documents as well as packaging, transportation and
storage of flanges shall comply with the provisions of JB/T 11218.
6.1.2.3 Welding materials
The welding materials (welding rods, welding wires, welding flux) used in tower
manufacturing shall comply with the regulations and design requirements of GB/T 5117,
GB/T 5118, GB/T 5293, GB/T 8110, GB/T 10045, and shall have a valid quality
certificate.
The welding materials (welding rods, welding wires, welding flux) used in tower
manufacturing shall match the base material, and the impact absorption energy shall not
be lower than the base material requirements.
6.1.2.4 Fasteners
The steel and performance grade of fasteners used for tower connections shall be
selected by the design unit in accordance with GB/T 5782, GB/T 1228, GB/T 1231,
GB/T 3098.1, GB/T 3098.2, GB/T 32076 (all parts) and NB/T 31082, and the
performance requirements shall be clearly stated in the design documents.
6.2 Analysis of the inherent characteristics of the tower
The analysis of the inherent characteristics of the tower shall take into account.
-- In general, there shall be an appropriate interval between the natural frequency
f0,n and the excitation frequencies fR, fR,m, which can be calculated according
to Formula (1) and Formula (2).
The stability analysis of the tower shall take into account the relevant failure mode of
the specific type of structure, namely the buckling of the tower.
If the two ends of the tower section are L-shaped or T-shaped flanges, only the stability
of each tower section can be analyzed; if the two ends of the tower section are of other
types, it shall be confirmed that the two ends of the tower section can provide the
necessary boundary conditions in order to analyze the stability of each tower section,
otherwise the stability of the entire tower frame shall be analyzed.
6.3.2.2 Analysis methods
The buckling analysis of the tower tube take into account the geometric, structural and
material defects that may occur during the manufacturing and installation process. The
buckling analysis shall be carried out using any of the following methods.
-- Analysis is performed based on relevant industry-recognized standards and
specifications, such as EN 1993-1-6.
-- Computer-aided buckling analysis. The effects of material nonlinearity
(MNA), material and geometric nonlinearity (GMNA), and material and
geometric nonlinearity taking into account imperfections (GMNIA) on
buckling shall be considered.
6.3.2.3 Door frame/reinforcement structure
For openings on tower sections with or without reinforced structures, buckling analysis
shall be performed using any of the following methods.
-- numerical buckling analysis including material and geometric nonlinearity
taking into account imperfections (GMNIA).
-- analysis and verification performed according to the method recommended in
Appendix B. For openings with door frames, the door frame cross section shall
be aligned with the center of the tower tube wall at the 3 o'clock and 9 o'clock
positions (as shown in Figure 1).
-- If other alternative methods can ensure the safety of opening buckling,
modifications, simplifications or extensions of the alternative methods may
be adopted.
The material of the gasket or other filler shall have a similar elastic modulus and
compression strength to the flange material. Perform filling near each bolt or between
each bolt and the tube wall. The filler shall ensure that the flange is fully in contact with
the filled area before the bolts are pre-tightened or after applying 10% of the design
pre-tightening force.
If the inclination angle αs of the flange outer surface exceeds 2° after the bolts have
applied the pre-tightening force, a conical gasket with strength not less than that of the
flange shall be used to fill it.
In the following cases, it can be assumed that the welding between the flange and the
tube wall is not affected by the edge-error of the tube wall.
-- The radius r between the flange surface and the weld neck is at least 10 mm;
-- The distance between the circumferential weld and the upper surface of the
flange shall meet the requirements of 6.4.1;
-- The distance requirement between weld toe and the upper surface of the flange
applies to production and repair welding;
-- The maximum limit of the internal taper of a single flange is 0.7°.
If the flange meets the above requirements, only the fatigue strength of the bolts and
circumferential welds needs to be analyzed.
If the above requirements are not met, detailed ultimate strength and fatigue strength
analysis of the flange, the weld between the flange and the tube wall, and the tube wall
near the weld shall be performed. The weld fatigue detail classification shall select the
value of the non-weld neck flange connection structure.
6.4.3 Ultimate strength analysis of flange and bolt connections
For the ultimate strength analysis of flange and bolt connections, simplified calculation
methods such as the Petersen/Seidel method can be used. However, the finite element
calculation method that does not consider the flange clearance and other calculation
methods that lead to similar results are not allowed.
The simplified calculation method needs to consider at least the following three failure
modes.
-- Failure caused by bolt breakage;
-- Failure caused by plastic hinges on the tower tube wall and/or flange and bolt
breakage;
-- Plastic hinges appearing on the tower tube wall and/or flange.
Non-destructive testing personnel shall be assessed and identified in accordance with
the requirements, pass the relevant professional qualification assessment, and obtain a
valid qualification certificate.
6.7.2 Raw material inspection
6.7.2.1 After the raw materials enter the factory, the tower manufacturing unit shall
conduct a detailed quality and qualification document review of the raw materials (not
limited to tube steel plates, flanges, door frames, welding materials, coatings, etc.), and
they can only be used after they are qualified. All welding materials shall be provided
with inspection reports regarding impact absorption energy, chemical composition, and
mechanical properties, and meet the standard requirements.
6.7.2.2 Raw materials shall be tested in accordance with 6.1.2 and meet the
requirements.
6.7.2.3 After the tower body steel plates enter the factory, 10% of the furnace batch
numbers must be retested for chemical composition and mechanical properties. Those
that fail the retest are not allowed to be used.
6.7.2.4 The selected testing organization shall have relevant qualifications, which shall
include the competence to test mechanical and chemical components.
6.7.3 Appearance and dimensional deviation requirements
6.7.3.1 Cutting
The cut surface of steel plates shall not have defects such as cracks, delamination,
inclusions, etc., and shall not affect the quality of welding and product appearance.
The dimensional deviation of the tube blanking shall meet the following requirements.
-- The length deviation of the large and small mouth strings is ±2 mm;
-- The length deviation between diagonals is ±3 mm;
-- The slant height deviation is ±2 mm.
The door frame blanking dimensional deviation is ±3 mm. There shall be no micro
cracks on the cut surface after forming, and the cutting edge shall have a smooth
transition.
6.7.3.2 Roll forming
6.7.3.2.1 The roundness tolerance requirement for any cross section of the tube is (Dmax
- D min)/Dnom not to exceed 0.01, as shown in Figure 7.
-- measures to be taken to avoid lamellar tearing;
-- weld acceptance criteria;
-- inspection and testing plan before and during welding;
-- weld identification requirements;
-- surface treatment requirements.
6.7.5.3 Welding procedure qualification report
The welding process of the welds between tubes and the welds welded to the tube
(including the door frame) shall be supported by the corresponding welding process
qualification. The welding process qualification shall be carried out in accordance with
the provisions of NB/T 47014 and ISO 15614-1, and a welding procedure qualification
report (WPQR) shall be prepared, which shall include the quality certificate of the
materials used.
When the repair weld does not use the same welding process as the original weld, the
repair process shall be evaluated separately. The welding process of the full penetration
T-butt weld shall be evaluated separately.
6.7.5.4 Welding preparation and implementation
6.7.5.4.1 Weld joint preparation
The joint preparation shall match the welding method. The joint preparation shall meet
the preparation form requirements in the welding procedure qualification. The tolerance
range of joint preparation and pairing shall be specified in the welding procedure
specification (WPS).
The joint groove shall be designed according to the requirements of GB/T 985.1 and
GB/T 985.2, and the groove form and geometric dimensions shall be determined
through welding process assessment.
Processing methods for joint grooves. mechanical method, flame cutting, plasma
cutting and other processing methods. The surface quality of flame cutting or plasma
cutting shall meet the requirements of Level II in JB/T 10045-2017.Oxide scale, slag
and surface layer that affects the welding quality shall be removed from the cut grooves.
The oil, paint, dirt, rust, burrs and galvanized layer within a range of not less than 15
mm on the joint groove and its inner and outer surfaces shall be cleaned, and there shall
be no defects such as cracks and interlayers. When repairing large gaps or other
geometric size problems on the joint groove, approved welding procedures need to be
used, and the above areas shall be polished and smoothly transitioned in time.
6.7.5.4.2 Storage and circulation of welding materials
The storage, circulation and use of welding materials shall be in accordance with the
manufacturer's recommendations. The drying and storage of welding rods and welding
flux shall meet the appropriate temperature and time. If welding materials (welding rods
and welding flux) are not used up after welding, they shall be dried again as required.
Welding rods can only be dried twice at most.
6.7.5.5 Welding environment
Welding operations shall be carried out indoors. In special cases when outdoor
operations are required, the requirements of drawings and technical specifications shall
be met. Welding shall not be carried out when any of the following situations occur and
there are no effective measures.
-- Wind speed. greater than 2 m/s for gas shielded welding, greater than 5 m/s
for arc welding, and 10 m/s for submerged-arc welding;
-- Relative humidity greater than 90%;
-- Rainy and snowy environment.
When the material to be welded is below 0 ℃, it can be heated appropriately.
When the welding environment temperature of steel with a grade not less than Q355 is
lower than 5 °C, preheating is required before welding.
6.7.5.6 Welding pairing
To ensure the size and deformation control of welded parts, use spot welding or external
equipment to fix the position before welding. The final size of the joint pair during
assembly shall be within the tolerance range, and deformation shall be reserved for
shrinkage and deformation.
During assembly and tack welding of welded parts, the welds shall be accessible and
visible.
6.7.5.7 Preheating
Preheating shall be carried out in accordance with GB/T 18591 and ISO/TR 17671-2.
Preheating shall be carried out in accordance with the applicable WPS, including tack
welding and welding of temporary accessories.
6.7.5.8 Temporary accessories
If temporary welding accessories are required during the assembly process (flanges and
door frames are not allowed to be welded with temporary accessories), the location of
the accessories shall be easy to remove, and the removal of the accessories shall not
-- method used to measure temperature;
-- results of mechanical property tests carried out for process qualification;
-- identification of operators qualified to perform the process.
6.7.5.14 Dissimilar steel welding
Requirements for welding different types of stainless steel and welding with other steel
grades shall be specified.
The person responsible for welding shall consider the selection of appropriate welding
technology, welding methods and welding materials. Stainless steel contamination and
electrochemical corrosion issues shall be carefully considered.
6.7.5.15 Post-welding heat treatment
If post-welding heat treatment is required after welding, appropriate procedures shall
be in place.
6.7.5.16 Welding implementation
Effective measures shall be taken to avoid arc scratches. If arc scratches occur, the steel
plate surface shall be slightly polished and inspected. After the appearance inspection,
PT or magnetic particle inspection MT shall be used.
Before each welding, cracks, holes and other unacceptable defects in the previous weld
shall be removed.
Before each welding, the slag on the surface of the previous weld and the cover weld
shall be removed. Special attention shall be paid to the connection between the weld
and the base material.
Requirements for grinding and finishing after welding are completed shall be specified.
6.7.5.17 Welding repair
6.7.5.17.1 Surface repair
All defects exceeding the standard on the weld and parent material surface shall be
repaired according to the process requirements.
6.7.5.17.2 Weld repair
For welds that need to be repaired, the causes of internal defects shall be analyzed,
improvement measures shall be proposed, and repairs shall be carried out according to
the qualified welding repair process. The number of repairs on the same part of the weld
shall not exceed two times. If it exceeds two times, the repair shall be approved by the
technical person in charge of the manufacturing unit before repair. After welding, the
weld, base material and heat-affected zone shall be hardness tested (the hardness value
shall not exceed HV10380). At the same time, the number of repairs and the repaired
parts shall be recorded in the quality certification materials.
6.7.5.18 Product welding test plate
6.7.5.18.1 If necessary, while welding the tower, make the longitudinal weld test plate
of the tube according to the same requirements. The thickness range of the product
welding test plate shall be within the product thickness range covered by the process
qualification represented.
6.7.5.18.2 The inspection items of product welding test plates shall be carried out in
accordance with the provisions of NB/T 47016.If the test plate fails, double the welding
test plate shall be made. The unqualified test plate represents the product weld failure
and shall be repaired or scrapped.
6.7.6 Welding inspection
6.7.6.1 Inspection before and during welding
Check the following items before and during welding.
-- applicability and validity of welder/welding operator certificates;
-- applicability of WPS;
-- identification of base materials and welding materials;
-- welding groove (form and size);
-- pairing, tooling and positioning;
-- suitability of working conditions (including environment) for welding;
-- main welding process parameters (welding current, arc voltage and welding
speed);
-- cleaning and shape of weld bead, number of layers of weld metal;
-- root gouging;
-- preheat/interpass temperature;
-- welding sequence;
-- correct use and storage of welding materials;
-- control of welding deformation.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 19072-2022 be delivered?Answer: The full copy PDF of English version of GB/T 19072-2022 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 19072-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 19072-2022_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 19072-2022 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds. Question 5: Should I purchase the latest version GB/T 19072-2022?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 19072-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
How to buy and download a true PDF of English version of GB/T 19072-2022?A step-by-step guide to download PDF of GB/T 19072-2022_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB/T 19072-2022". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|