GB/T 19068.2-2017English399 Add to Cart Days<=5 Small wind turbines -- Part 2: Test method Valid GB/T 19068.2-2017
GB/T 19068.2-2017Chinese19 Add to Cart <=1-day [PDF from Chinese Authority, or Standard Committee, or Publishing House]  

   

BASIC DATA
Standard ID GB/T 19068.2-2017 (GB/T19068.2-2017)
Description (Translated English) Small wind turbines--Part 2: Test method
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F11
Classification of International Standard 27.180
Word Count Estimation 22,257
Date of Issue 2017-11-01
Date of Implementation 2018-05-01
Drafting Organization China Agricultural Mechanization Research Institute Hohhot Branch, Hefei People Power Co., Ltd., Ningbo Jin Lang New Energy Technology Co., Ltd.
Administrative Organization National Wind Machinery Standardization Technical Committee (SAC/TC 50)
Proposing organization China Machinery Industry Federation
Issuing agency(ies) People's Republic of China General Administration of Quality Supervision, Inspection and Quarantine, China National Standardization Administration

GB/T 19068.2-2017
Small wind turbines-Part 2. Test method
ICS 27.180
F11
National Standards of People's Republic of China
Replacing GB/T 19068.2-2003
Small wind turbine
Part 2. Test methods
Smalwindturbines-Part 2.Testmethod
Posted.2017-11-01
2018-05-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
1 range 1
2 Normative references 1
3 Terms and definitions 1
4 symbols and acronyms 1
5 test conditions 1
6 test method 4
7 Test Report Formats and Contents 9
Appendix A (Normative) Wheel inertia measurement and calculation 11
Appendix B (informative) test equipment and accuracy 12
Appendix C (Normative) Test Report Formats and Contents 15
Foreword
GB/T 19068 "small wind turbine" is divided into the following three sections.
--- Part 1. Technical conditions;
--- Part 2. Test methods;
--- Part 3. Wind tunnel test methods.
This section GB/T 19068 Part 2.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This Part replaces GB/T 19068.2-2003 "off-grid wind turbine generator Part 2 Test Methods."
This section compared with GB/T 19068.2-2003, in addition to editorial changes outside the main technical changes are as follows.
--- Expand the scope of this section (see Chapter 1,.2003 edition Chapter 1);
--- Increasing the requirements of the position of the wind tower inside the test site (see 5.1.3);
--- Increased site calibration and measurement sector requirements (see 5.1.6);
--- Increased the confirmation of the prototype test, inspection and commissioning, test prototype electrical connection and prototype testing equipment installation and layout
Content (see 5.3, 5.4 and 5.5);
--- Increasing the static balance of blades and the tip of the axial runout test content (see 6.1);
--- Modify the unit power characteristics of the test (see 6.3,.2003 version 4.2 and 4.3);
--- Increasing the unit noise level in accordance with GB/T 22516 Determination of the choice (see 6.5.2);
--- Increased durability test content (see 6.6);
--- Increased vibration test and evaluation of the unit (see 6.7);
--- Increasing the electrical subsystem test and coating test content (see 6.8 and 6.9);
--- Deleted electromagnetic interference determination (see.2003 version 4.5.2);
--- Deleted all the provisions of the test on vertical axis wind turbine (see Chapter 1 of the.2003 edition, 3.3.2, Table 1 and A.2);
--- Increased test report on the power characteristics of the test and durability test (see Chapter 7);
--- Modify the appendix of the format and content of the test report to the normative appendix (see Appendix C, Appendix B of.2003).
This part is proposed by China Machinery Industry Federation.
This part of the National Wind Machinery Standardization Technical Committee (SAC/TC50) centralized.
This part of the drafting unit. China Agricultural Mechanization Research Institute Hohhot Branch, Hefei people Power Co., Ltd., Ningbo Jinlang new
Energy Technology Co., Ltd.
The main drafters of this section. Dong Wenbin, Guo Bo, Zhang Weimin, Li Qing Shao, Zhang Tianci.
This section was first released in April.2003, this is the first revision.
Small wind turbine
Part 2. Test methods
1 Scope
GB/T 19068 provisions of this part of a small wind turbine (hereinafter referred to as "unit") test conditions and test methods.
This section applies to the wind wheel sweep area of less than.200m2, the resulting voltage is lower than the AC 1000V or DC 1500V grid or
Test of off-grid small horizontal axis wind turbine.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all revisions) applies to this document.
GB/T 9239.1 mechanical vibration constant (rigid) rotor balance quality requirements - Part 1. Specification and balance of tolerance test
GB/T 10760.2 Small generators for wind turbines - Part 2. Test methods
GB/T 17646-2017 small wind turbine
GB/T 18451.2-2012 wind turbine power characteristics test
GB/T 22516 wind turbine noise measurement method
JB/T 7879 wind machine product code preparation rules
JB/T 10399 Off-grid wind turbine rotor blades
3 Terms and definitions
GB/T 17646-2017 and GB/T 18451.2-2012 Terms and definitions apply to this document.
4 symbols and abbreviations
The symbols and abbreviations defined in GB/T 17646-2017 and GB/T 18451.2-2012 apply to this document.
5 test conditions
5.1 test site
5.1.1 Overview
The test site may have a significant impact on the measured power characteristics of the unit under test, in particular, airflow distortions may cause wind speed on the tower
Different from the wind speed of the unit, although they are related to each other.
Before the test, it is necessary to evaluate the factors that may cause airflow distortion at the test site so that
● Select the wind tower installation location;
● determine the appropriate measurement sector;
● assess the appropriate airflow distortion correction factor;
Related standard:   GB/T 19068.3-2019  GB/T 19068.1-2017
Related PDF sample:   GB/T 19071.1-2018  GB/T 19070-2017
   
 
Privacy   ···   Product Quality   ···   About Us   ···   Refund Policy   ···   Fair Trading   ···   Quick Response
Field Test Asia Limited | Taxed in Singapore: 201302277C | Copyright 2012-2020