GB/T 1573-2018 PDF English
US$85.00 · In stock · Download in 9 secondsGB/T 1573-2018: Determination of thermal stability of coal Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid GB/T 1573: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
GB/T 1573-2018 | English | 85 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Determination of thermal stability of coal
| Valid |
GB/T 1573-2001 | English | 199 |
Add to Cart
|
2 days
|
Determination of thermal stability of coal
| Obsolete |
GB/T 1573-1989 | English | 199 |
Add to Cart
|
2 days
|
Determination of thermal stability of coal
| Obsolete |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 1573-2018
GB/T 1573-2018: Determination of thermal stability of coal---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT1573-2018
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 73.040
D 21
Replacing GB/T 1573-2001
Determination of thermal stability of coal
Issued on: FEBRUARY 6, 2018
Implemented on: SEPTEMBER 1, 2018
Issued by. General Administration of Quality Supervision, Inspection and
Quarantine of the People's Republic of China;
Standardization Administration of the People's Republic of
China.
Table of Contents
Foreword ... 3
1 Scope ... 4
2 Normative references ... 4
3 Terms and definitions ... 4
4 Method summary ... 5
5 Apparatus ... 5
6 Sample ... 6
7 Determination procedures ... 6
8 Expression of results ... 6
9 Method precision ... 7
10 Test report ... 7
Determination of thermal stability of coal
1 Scope
This Standard specifies the method summary, apparatus, samples, determination
procedures, result expression, method precision and test report for the determination
of thermal stability of coal.
This Standard applies to lignite, anthracite and non-caking bitumite.
2 Normative references
The following referenced documents are indispensable for the application of this
document. For dated references, only the edition dated applies to this document. For
undated references, the latest edition of the referenced documents (including all
amendments) applies to this document.
GB/T 474, Method for preparation of coal sample
GB/T 483, General rules for analytical and testing methods of coal
3 Terms and definitions
For the purposes of this document, the following terms and definitions and those
defined in GB/T 483 apply.
3.1
thermal stability
A measure of the ability to maintain a specified particle size after heating of coal.
Under specified conditions, for coal sample of a certain particle size after heating, the
mass fraction of the mass of residual coke of particle size greater than 6 mm accounted
for the total of the masses of residual coke of all particle sizes is deemed as the thermal
stability index (TS+6); the mass fraction of the mass of residual coke of particle size 3
mm ~ 6 mm and less than 3 mm accounted for the total of the masses of residual coke
of all particle sizes is deemed as the auxiliary index of thermal stability (TS3~6, TS-3).
NOTE. Rewrite Definition 3.3.22 of GB/T 483-2007.
6 Sample
Prepare about 2 kg of air-dried coal sample of particle size 6 mm ~ 13 mm in
accordance with GB/T 474; carefully screen out the coal sample of particle size less
than 6 mm; divide into two after mixing up.
7 Determination procedures
7.1 Use crucibles to take 500 cm3 of coal sample from two shares of coal sample
respectively; weigh (accurate to 0.02 g) and make the difference in the masses of the
two coal samples not greater than 1 g. Place each coal sample into 5 crucibles; put on
the crucible cover and place the crucibles on the crucible holder. For the repeated
determination of each sample, it shall not be heated in the same furnace.
7.2 Rapidly put the crucible holder holding crucibles into the constant-temperature
zone of the muffle furnace which has been heated to 900°C; shut the furnace door;
adjust the furnace temperature to 850°C, to heat the samples for 30 min at the
temperature exactly. After the crucibles and crucible holder are in place, it is required
that the furnace temperature is recovered to (850 ± 15)°C within 8 min; maintain it at
(850 ± 15)°C after this. Or else, the test is void. The heating time includes the
temperature recovery time.
7.3 Take the crucibles from the muffle furnace; cool to room temperature;
immediately weigh the total mass of each share of residual coke (accurate to 0.02 g).
7.4 Overlap the screens of mesh sizes 6 mm and 3 mm and bottom tray on the sieve
shaker; pour one share of residual coke weighed into the 6 mm screen; put on the
sieve cover and fix it.
7.5 Start the sieve shaker for screening for 10 min.
7.6 Weigh respectively the masses (accurate to 0.02 g) of all grades of residual coke
of particle size 6 mm, 3 mm ~ 6 mm and less than 3 mm. Compare the total of the
masses of residual coke of all particle sizes and the total mass of residual coke before
screening, and the difference between the two shall not exceed ± 1 g, or else, the test
is void.
8 Expression of results
8.1 The index of thermal stability and the auxiliary index of thermal stability of coal
are calculated in accordance with Formulas (1) ~ (3).
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 1573-2018 be delivered?Answer: The full copy PDF of English version of GB/T 1573-2018 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 1573-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 1573-2018_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 1573-2018 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds. Question 5: Should I purchase the latest version GB/T 1573-2018?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 1573-2018 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
How to buy and download a true PDF of English version of GB/T 1573-2018?A step-by-step guide to download PDF of GB/T 1573-2018_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB/T 1573-2018". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|