|
US$819.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 11943-2008: Boiler drawings Status: Valid GB/T 11943: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 11943-2008 | English | 819 |
Add to Cart
|
6 days [Need to translate]
|
Boiler drawings
| Valid |
GB/T 11943-2008
|
| GB/T 11943-1989 | English | RFQ |
ASK
|
9 days [Need to translate]
|
Boiler drawings
| Obsolete |
GB/T 11943-1989
|
PDF similar to GB/T 11943-2008
Basic data | Standard ID | GB/T 11943-2008 (GB/T11943-2008) | | Description (Translated English) | Boiler drawings | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J98 | | Classification of International Standard | 27.060; 01.100 | | Word Count Estimation | 37,382 | | Date of Issue | 2008-01-31 | | Date of Implementation | 2008-07-01 | | Older Standard (superseded by this standard) | GB/T 11943-1989 | | Quoted Standard | GB/T 4458.1; GB/T 4458.4; GB/T 4458.5; GB/T 4458.6; GB/T 6567.5 | | Regulation (derived from) | National Standard Approval Announcement 2008 No.2 (Total No.115) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the design of the boiler drawing specific requirements. This standard applies to boiler, boiler steel, accessories and auxiliary equipment design drawing, within the range of boiler pipes. |
GB/T 11943-2008: Boiler drawings---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Boiler drawings
ICS 27.060; 01.100
J98
National Standards of People's Republic of China
Replacing GB/T 11943-1989
Boiler Drawing
Posted 2008-01-31
2008-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 1 General Provisions
4 tube drawing and dimensioning 2
5 drum, set top box painting and dimensioning 14
6 steel drawing and dimensioning 18
7 sectional symbols and graphic symbols 25
Appendix A (informative) pipe isometric drawing 30
Annex B (informative) furnace wall insulation material sectional symbol 32
1 level 2 symbol
Figure 2 provincial gas serpentine tubes 2
Figure 3 hole trap 3
Figure 4 Wall fin tube 3
Figure 5 tube opening 4
Figure 6 end necking 4
Figure 7 is welded tubes Annex 4
8 pin tube 5
9 line pipe and other component parts (a) 5
10 pipe and other piping component parts (b) 5
11 space tube positive and negative elements 6
12 Space pipe 6
FIG tube 13 left and right parts 7
14 tubes of positive and negative elements 8
15 table of FIG. (A) 8
16 table of FIG. (B) 9
FIG. 17 is connected with the valve tube welding 9
18 tube connected to the valve flange 9
19 Membrane Water pipe group 10
20 Membrane Water positive and negative elements 10
21 Membrane Water Positive and Negative contour representation 11
Membrane Water 22 parts contour map showing 11
Figure 23 air preheater 12
24 superheater serpentine tubes 12
25 pipe dimensions specified 13
26 gauge elbow 13
Figure 27 horizontal cylinder bearing labels 14
28 vertical orientation diagrams of the barrel 14
29 a front view of the drum 15
30 Header 15
31 drum to hose connector 16
32 header left and right 16
Figure 33 Figure 17 Expand Header
Figure 34 Figure 17 drum Expand
35 hole size similar coloring represented 17
Close to 36 holes the size of letters 18
37 drum internal expansion means 18
38 pitches ranging staggered rows of holes marked 18
39 steel front wall 19
Figure 40 rigid beam arrangement of Figure 20
41 different high-level platform stairs standard floor plan 21
42 platform stairs (a) 21
Figure 43 stairs platform (b) 21
Simplified diagram representing 44 column cut after 22
Simplified cut after 45 Leung said 22
46 single Genzhu assembly 23
Figure 47 assembly segments single column of 24
Figure 48 frame guard, platform 25
49 structure of positive and negative 25
Figure A. 1 jet pipe (a) 30
Figure A. 2 water pipes (two) 30
Figure A. 3 line 31
Table 1 Symbols and abbreviations 1
Table 2 Comparative Example 2
Table 3 dimension line terminal 2 form
Table 4 sectional symbol 26
Table 5 and graphic symbols 27 holes
Table 6 graphic symbols 28 valves and accessories
Table B. 1 furnace wall insulation materials sectional symbol 32
Foreword
This standard replaces GB/T 11943-1989 "Boiler Drawing."
This standard compared with GB/T 11943-1989 main changes are as follows.
--- General in Chapter 3, the increase in the general view of the boiler, the requirements of section diagram clearly left and right side of the boiler water wall, dividing the header
in principle;
--- In Chapter 4, the tube drawing and dimensioning, increasing the legend and membrane tubes with a single thick solid line indicates the Wall and the shaft
Mapping painting, etc;
--- In Chapter 5, drum, set top box and the dimensions of the painting, the increase in the inner drum surface by an expanded view of the legend, hole size similar
And unequal pitch staggered rows of holes tagging methods;
--- Chapter 6 steel painting and dimensioning, increasing the general view of the boiler steel structure and steel general plan requirements, rigid beam arrangement
Legend with a single thick solid line maps;
--- In Chapter 7, a cross-sectional symbols and graphic symbols, increasing the graphic symbols hole, the pipe system of valves and accessories graphic symbols;
--- Added Appendix A (informative) pipe isometric drawings;
--- Added Appendix B (informative) furnace wall insulation material sectional symbol.
The Standard Appendix A, Appendix B is an informative annex.
This standard by the National Standardization Technical Committee of the boiler pressure vessel (SAC/TC262) and focal points.
This standard by the National Standardization Technical Committee of the boiler and pressure vessel boiler Technical Committee (SC1) organization revised.
This standard was drafted. Beijing Babcock & Wilcox Company.
The main drafters of this standard. Guo Yi, Luo sound.
This standard replaces the standards previously issued as follows.
--- JB2632-1981;
--- GB/T 11943-1989.
Boiler Drawing
1 Scope
This standard specifies the special drawing boiler product design requirements.
This standard applies to the boiler, the boiler steel structure drawing, scope boiler pipes, accessories and auxiliary equipment pattern.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 4458.1 Mechanical drawings - view (GB/T 4458.1-2002, ISO 128-34.2001, MOD)
GB/T 4458.4 Mechanical drawings - Dimensioning
GB/T 4458.5 Mechanical drawings with dimensional tolerances and injection method
Sectional GB/T 4458.6 Mechanical drawings - view and a sectional view (GB/T 4458.6-2002, ISO 128-44.2000,
MOD)
Graphics Graphical symbols line GB/T 6567.5 piping systems, fittings and valves symbol isometric drawing method
3 General
Figure 3.1 Total boiler shall meet the following basic requirements.
a) general view shows only the boiler assembly relations ministries, between the components, the number and arrangement pattern may lead parts list parts concerned
Section boiler components in the order listed in the General List;
b) Boiler general view title bar should be indicated Boiler Model;
c) the boiler when the total number of sheets of drawings Figure Composition, specifications and technical requirements of the boiler should be located Home.
3.2 boiler unit, component diagram should be drawn portion, the overall arrangement of the components, for which the structure should seek to repeat simplified.
3.3 Boiler left and right water wall, set top box, so as to face the front of the boiler wall to divide the "left", "right" pieces. Generally symmetrical member is appropriate, "positive", "against" member
FIG.
3.4 boiler parts and components, should be drawn separately drawings, in the following circumstances do not allow individual drawing parts and components Figure.
a) after punching or cutting steel vertical no longer by the other machined parts.
b) simple parts from steel plate punching or gas cutting made in Fig or assembly unit, drawing on a detailed assembly diagram.
c) purchased the finished piece. Purchased parts and components if still partial processing, in addition to the processing section showing detail, the rest can be omitted representation.
3.5 symmetrical parts, assembly unit, generally draw a pattern on the graph shows graphs only one of the parts, the Ministry of assembly, another zero
Member assembly unit in its symmetrical parts are indicated by the imaginary line, this time should be separately marked "left" on the pattern, "right" member or "positive", "against" member.
The same or similar shaped parts, components section 3.6 Structure, should be drawn into the table of FIG.
3.7 can be omitted in the following cases view.
a) a view can be expressed clearly do not have to configure a second view;
b) opening on the boiler components, special representation is not a through hole;
c) dimensioning, should make full use of symbols and abbreviations, see Table 1;
Table 1 Symbols and Abbreviations
Title diameter sphere diameter sphere radius square radius of uniform thickness plane
D) When parts with bending or stamping method made only after the commencement of the length or dimensions to meet the requirements, do not draw
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 11943-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 11943-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 11943-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 11943-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 11943-2008?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 11943-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|