GB/T 11024.4-2019 PDF English
US$140.00 · In stock · Download in 9 secondsGB/T 11024.4-2019: Shunt capacitors for a.c. power systems having a rated voltage above 1 000 V -- Part 4: Internal fuses Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid GB/T 11024.4: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
GB/T 11024.4-2019 | English | 140 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Shunt capacitors for a.c. power systems having a rated voltage above 1 000 V -- Part 4: Internal fuses
| Valid |
GB/T 11024.4-2001 | English | 319 |
Add to Cart
|
3 days
|
Shunt capacitors for a.c. power systems having a rated voltage above 1 kV -- Part 4: Internal fuses
| Obsolete |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 11024.4-2019
GB/T 11024.4-2019: Shunt capacitors for a.c. power systems having a rated voltage above 1 000 V -- Part 4: Internal fuses ---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT11024.4-2019
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 31.060.70
K 42
Replacing GB/T 11024.4-2001
Shunt capacitors for a.c. power systems having a
rated voltage above 1000 V - Part 4: Internal fuses
(IEC 60871-4:2014, MOD)
ISSUED ON: MARCH 25, 2019
IMPLEMENTED ON: OCTOBER 01, 2019
Issued by: State Administration for Market Regulation
Standardization Administration of the People’s Republic of
China.
Table of Contents
Foreword ... 3
1 Scope ... 5
2 Normative references ... 5
3 Terms and definitions ... 5
4 Performance requirements ... 5
5 Test ... 7
Appendix A (Normative) Internal fuse isolation test method ... 11
Appendix B (Informative) Fuse protection coordination guide ... 14
Shunt capacitors for a.c. power systems having a
rated voltage above 1000 V - Part 4: Internal fuses
1 Scope
This Part of GB/T 11024 specifies the requirements for power capacitor testing
and provides guidelines for fuse protection.
This Part applies to internal fuses (referred to as fuses) that disconnect the
faulty capacitor component, so as to allow the remainder of the capacitor unit
and the capacitor bank to which the capacitor unit is connected to continue to
operate. Such fuses are not intended as replacements for switching devices
such as circuit breakers or as replacements for external protection of capacitor
banks or any portion thereof.
2 Normative references
The following documents are indispensable for the application of this document.
For dated references, only the dated version applies to this document. For
undated references, the latest edition (including all amendments) applies to this
document.
GB/T 11024.1-2019, Shunt capacitors for a.c. power systems having a rated
voltage above 1000V. Part 1: General (IEC 60871-1:2014,MOD)
3 Terms and definitions
Terms and definitions determined by GB/T 11024.1-2019 and the following ones
are applicable to this document.
3.1 Rated voltage of a capacitor element
UNe
The root-mean-square value of the AC voltage that is specified when designing
capacitor components.
4 Performance requirements
4.1 Overview
short-term instantaneous overvoltage that the capacitor typically experiences
during its life.
During the life of the capacitor, the fuse shall be able to continuously withstand
a current equal to or greater than the maximum allowable current of the unit
divided by the current of number of parallel fuses.
The fuse shall be able to withstand the inrush currents that may occur during
the life of the capacitor due to the switching operation.
The fuse that is attached to the undamaged component shall be able to
withstand the discharge current due to component breakdown.
The fuse shall be able to withstand the current that is caused by a short-circuit
fault on the outside of the capacitor bank at a peak voltage of 2.5 UN (2.2 UN for
AC filter capacitors).
5 Test
5.1 Routine test
5.1.1 Overview
The fuse shall be able to withstand all routine tests of the capacitor unit in
accordance with the provisions of GB/T 11024.1-2019.
5.1.2 Discharge test of internal fuse
Capacitors that have internal fuses shall be capable of withstanding a short-
circuit discharge test; pass a 1.7 UN DC voltage through a gap that closes to
the capacitor as far as possible and does not contain any applied impedance
for a test.
The capacitance shall be measured before and after the discharge test. The
difference between the two measured values shall be less than the amount of
change that is caused by the internal fuse failures.
The discharge test can be performed before or after the voltage test between
the terminals (see Chapter 9 of GB/T 11024.1-2019). However, if it is performed
after the voltage test between the terminals, the capacitance shall be measured
at the rated voltage, so as to check if the fuse is operating.
If the purchaser agrees to accept a capacitor with fuse failures, the voltage test
between the terminals (see Chapter 9 of GB/T 11024.1-2019) shall be
performed after the discharge test.
If the test is performed with AC, it is not necessary to use the peak voltage to
trigger component damage for the test at the lower limit voltage.
Some test methods are given in Appendix A.
5.3.2 Capacitance measurement
The capacitance shall be measured after the test, so as to prove that the fuse
has been disconnected. The used measurement method shall be sufficiently
sensitive to detect changes in capacitance that is caused by the disconnection
of a fuse.
5.3.3 Inspection of the unit
The casing shall be free of significant deformation before opening.
The casing shall be inspected after opening, so as to ensure that:
a) the intact fuse is not significantly deformed;
b) no more fuse damage than more than one (or one tenth of the directly
connected components with fuses) (see Note to A.1 in Appendix A). If
method b) in Appendix A is used, an additional fuse that is connected to
the intact component (or one-tenth of the directly connected components
with fuses) is allowed to be damaged at the upper limit voltage.
Note: A small amount of blackening impregnating agent does not affect the
quality of the capacitor.
It shall be noted that dangerous residual charges may be present on
components that are broken due to fuse action or due to damage to their
connecting wires. All components shall be carefully discharged.
5.3.4 Voltage test after the casing is opened
The voltage test shall be performed by applying a DC voltage of 3.5 × UNe (UNe
is the component voltage) between the breakdown component and the fuse gap
after fusing, for 10 s. Components and fuses shall not be removed from the test
unit. During the test, the gap shall be in the impregnating agent; no breakdown
is allowed between the fuse gap or any part of the fuse and the rest of the unit.
Note: For units, of which all components are connected in parallel, and for all
units that use the methods b), c), d) or e) in Appendix A for testing, this
test may be replaced by an AC test before the unit is opened. The test
voltage between the terminals is calculated as the capacitance ratio,
such that the voltage between the breakdown component and its blown
fuse gap is 3.5 × UNe/2.
Appendix A
(Normative)
Internal fuse isolation test method
A.1 Overview
It shall use one of the test methods a), b), c), d), e) or other methods.
The voltage and current of the capacitor shall be recorded during the test, so
as to verify that the fuse has been disconnected.
In order to verify the current limiting performance of the fuse at the upper limit
voltage test, the voltage drop across the fuse after fusing, except for the
transition process, shall not exceed 30% of the upper limit voltage.
If the voltage drop exceeds 30%, measures shall be taken, such that the parallel
stored energy and power frequency fault currents that are obtained from the
test system are comparable to the operating conditions. Then, perform tests
under these conditions to verify whether the fuse action is satisfactory.
In doing this test, measures should be taken to prevent the capacitor unit from
exploding and the nail from explosive ejecting.
Note: an additional fuse that is connected to the intact component (or one-tenth
of the directly connected components with fuses) is allowed to be
damaged at the upper limit voltage.
A.2 Test method
The test method is as follows:
a) preheating of the capacitor
Place the capacitor unit in an oven for preheating before the lower limit
AC test voltage is applied. The preheating temperature (100°C ~ 150°C)
is chosen by the manufacturer, in order to obtain the first breakdown in a
practically short time (minutes to hours).
In order to prevent the internal hydraulic pressure from being too high due
to high temperature, an overflow pipe with a valve can be installed on the
unit to close the valve at the moment when the test voltage is applied.
A lower preheating temperature can be used when applying the upper limit
test voltage, so as to avoid breakdown if the test voltage has not been
reached.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 11024.4-2019 be delivered?Answer: The full copy PDF of English version of GB/T 11024.4-2019 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 11024.4-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 11024.4-2019_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 11024.4-2019 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds. Question 5: Should I purchase the latest version GB/T 11024.4-2019?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 11024.4-2019 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
How to buy and download a true PDF of English version of GB/T 11024.4-2019?A step-by-step guide to download PDF of GB/T 11024.4-2019_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB/T 11024.4-2019". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|