HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB 50231-2009 PDF English

US$145.00 · In stock · Download in 9 seconds
GB 50231-2009: General code for construction and acceptance of mechanical equipment installation engineering
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB 50231: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB 50231-2009English145 Add to Cart 0-9 seconds. Auto-delivery General code for construction and acceptance of mechanical equipment installation engineering Valid
GB 50231-1998EnglishRFQ ASK 14 days General code for construction and acceptance of mechanical equipment installation engineering Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB 50231-2009
      

Similar standards

GB 50273   GB 50275   GB 50276   GB 51441   

GB 50231-2009: General code for construction and acceptance of mechanical equipment installation engineering


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB50231-2009
NATIONAL STANDARD OF THE PEOPLE'S REPUBLIC OF CHINA General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering Issued on: MARCH 19, 2009 Implemented on: OCTOBER 1, 2009 Jointly Issued by Ministry of Housing and Urban-Rural Construction of the People's Republic of China General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China 3. No action is required - Full-copy of this standard will be automatically & immediately delivered to your EMAIL address in 0~60 minutes.

Foreword

According to the requirements of original Document Jian Biao (2003] No. 102 issued by the Ministry of Construction-"Notice on Printing the Development and Revision Plan of National Engineering Construction Standards in 2002 and 2003", China Academy of Building Research jointly made a revision for the national standard "General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering" GB 50231-98 in conjunction with the departments concerned. During the process of revision, the revision group carried out extensive investigation and research, summarized the practical experiences on mechanical equipment installation for the last years, carried out monographic studues, made reference to a great deal documents and engineering data, broadly solicited the the depa1tments concerned and experts for suggestions, and revised, perfected and finalized this code through repeated discussions. The revision contents cover. 1. Adjustment of chapter structures makes the division of chapters and section and the mechanical product types in the revised code are uniform to the classification criteria for the type spectrum of mechanical product series, the names are consistent with provision contents, and the connection and cooperation among working procedures be more reasonable. 2. Such new varieties and new technologies as shock pad, sealant, mould seam, tight joint sleeve, safety coupling, sprag clutch, and new-style water-base alkaline cleaner and acidic cleaner are added. The technical contents in such provisions as high-tensile bolt and the welding as well as pressure test and trial run of hydraulic pressure, pneumatic and lubrication pipings are enriched. The provisions 111 bold in this code are compulsory provisions and must be enforced strictly. Ministry of Housing and Urban-rural Develepment is in charge of the administration of this code and the explanation of the compulsory provisions, China Machinery Industry Federation is responsible for the current management and China Cmiic Engineering & Construction Corporation is responsible for the explanation of the compulsory provisions of the specific technical contents. All relevant organizations are kindly requested to carefully sum up your experiences combining with the engineering practice during the process of implementing this code. The relevant opinions and advice on the points that need to be revised or supplemented, whenever discovered, can be posted or passed on to the State Mechanical Industry Installation Engineering Standard Quota Station (Address. 5# Building, 5# South Alley, San Li He Road, Xicheng District Beijing, Postal code. 100045, Postbox. jxdez@_cmiic.com.cn), with a view to the reference in future revision. The organization unit, chief development organization, participaling development organizations and chief drafting staffs of this code are. Organization unit. China Exploration & Design Association

Table of Contents

General Provisions ... l 2 Construction Conditions ... 2 3 Setting out Perch and Centering Leveling ... ;... 5 4 Anchor Bolt, Iron Gasket and Grouting ... 7 4. 1 Anchor Bolt ... 7 4.2 Iron Gasket... l 0 4.3 Grouting ... 13 5 Assetnbly ... 14 5. l General Provisions ... 14 5.2 Joining and Fastening ... 15 5.3 Assembly of Couplings ... 21 5.4 Assembly of Clutches and Detents ... 31 5.5 Assembly of Sliding Bearings ... 36 5.6 Assembly of Antifriction Bearings ...40 5.7 Assembly of Driving Straps, Chains and Gears ... 43 5 .8 Assembly of Sealing A1ticles ... 48 6 Installations of Hydraulic Pressure, Pneumatic and Lubrication Pipe ... 51 6.1 Preparations for .Pipes ... 51 6.2 Welding of Pipe ... 52 6.3 Pipe Installation ... 56 6.4 Pickling, Flushing and Blowing of Pipes ... 57 6.5 Pressure Test and Paint of Pipe ... 59 7 Commissioning ... 61 7. l Requirements of Commission ing ... 61 7.2 Electrical and Operational Control System Commissioning ... 61 7.3 Lubrication System Adjustment ... 62 7.4 Hydraulic Pressure System Commissioning ... 63 7.5 Pneumatic and Cooling System Adjustment... 64 7.6 Heating System Adjustment... 65 7.7 Operation test of Mechanical Equipment ... 65 7.8 Zero Load Test running of Cmplete Mchine ... 66 8 Acceptances of Works ... 68 Appendix A Iron Gaskets ... ; ... 69 Appendix B Making of Ground Grouting Concrete and Placement of Sizing Block ... 70 Appendix C Placement of Gasket with Mud-jack Method ... 72 Appendix D Derusting Method of Metal Surface ... 74 Appendix E Cleaning of Built-up Member and Pipe ... 75 Appendix F Connection Rigidity and Pretightening Force of Bolt ... 78 Appendix G Press-in Force and Temperature CaJculation of Stationary Fit ... 80 Appendix H Measurement and Calculation for Radial Dispersion and Obliquity of Two Axes in Coupling Asse1nbly ... 84 Appendix J Pipe Washing Cleanliness Grades ... 86 Explanation of Wording in This Code ... 88 1 General Provisions 1.0.1 This code was formulated in order to improve the construction level of mechanical equipment installation engineering, promote technical progress, ensure the construction quality and safety and improve the economic benefit. 1.0.2 This code is applicable to the general parts in the construction and acceptance of various mechanical equipment installation engineerings. 1.0.3 The mechanical equipment installation engineering shall be started from the unpacking of equipments to the construction and acceptance of the equipments in zero load test run, and the mechanical equipments that shall have the test run with load, it shall be end until to the load test run. 1.0.4 The construction of mechanical equipment installation engineering shall be carried out according to the engineering design, the engineering design is prohibited to being revised arbitrarily, corresponding opinions and advices shall be offered timely if any mistakes are discovered in the design documents and drawings, besides, the construction shall be carried out according to the engineering design modified by the original design organization. 1.0.5 The installed mechanical equipments, spare parts and primary materials must be in accordance with those specified in the engineering design and the relevant product standards and shall also be with the conformity certificates. 1.0.6 The various measuring instruments, detectors, instruments, apparatus and equi- pments adopted in the mechanical equipment installation engineering must meet those specified in the current relevant national standards; their precision class shall meet the accuracy req uirement of the test item. 1.0.7 In the construction of mechanical equ ipment installation engineering, the construction quality shall be inspected and recorded. As for the concealed engineering, it shall be inspected and recorded before the engineering is concealed, and the equipments shall be continued to be installed after the inspection is qualified. Tn the engineering acceptance, the acceptance check and necessary random inspection work are carried out based on the related records. 1.0.8 The construction and acceptance of mechanical equipment installation engineering shall not only comply with this code, but also shall comply with those specified in the in the current relevant national standards. 3 Setting out Perch a nd Cen ter ing Leveling 3.0.1 Before the mechanical equipment are in place, the reference line of installation shall be marked out according to the construction drawing and the axial line, edge line and elevation line of relevant buildings. 3.0.2 The mechanical equipments that are mutually connected or with arrangemenf relation shall be marked out with common installation datum line and shall be buried with center reference plate or reference point according to the specific requirements of equipments. The center reference plate and reference point shall be... ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB 50231-2009 be delivered?

Answer: The full copy PDF of English version of GB 50231-2009 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB 50231-2009_English with my colleagues?

Answer: Yes. The purchased PDF of GB 50231-2009_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB 50231-2009 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB 50231-2009?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 50231-2009 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB 50231-2009?

A step-by-step guide to download PDF of GB 50231-2009_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB 50231-2009".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9