HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB 50184-2011 PDF English

US$125.00 · In stock · Download in 9 seconds
GB 50184-2011: Code for acceptance of construction quality of industrial metallic piping
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB 50184: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB 50184-2011English125 Add to Cart 0-9 seconds. Auto-delivery Code for acceptance of construction quality of industrial metallic piping Valid
GB 50184-1993EnglishRFQ ASK 11 days Standard for checking and evaluating the quality of industrial metallic piping Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB 50184-2011
      

Similar standards

GB 50683   GB 50236   GB 50270   GB/T 31032   

GB 50184-2011: Code for acceptance of construction quality of industrial metallic piping

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB50184-2011
National Standard of the People’s Republic of China P GB/T 50184-2011 Code for Acceptance of Construction Quality of Industrial Metallic Piping Issued on: DEC 24, 2010 Implemented on: DEC 01, 2011 Jointly issued by. Ministry of Housing and Urban-Rural Development; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China.

Foreword

This Code, on basis of "Standard for Quality Inspection and Assessment of Industrial Metal Pipeline Engineering" (GB 50184-93), is reserved and completed by China Petroleum & Chemical Engineering Survey and Design Association and China National Chemical Engineering Third construction Co., Ltd. jointly with organizations concerned according to the requirements of "Notice on Printing and Publishing ‘Development and Revision Plan of National Standard for Project Construction 1999’" (JIANBIAO [1999] No. 308) by Ministry of Construction. During the revision process, the drafting group revised, examined and finalized this Code based on wide investigation and study, earnestly summarizing the practical experiences and making reference to the relevant international standards and foreign advanced standards as well as extensively soliciting for opinions. This Code comprises 9 chapters and 4 appendixes with the main contents as follows. general provisions, terms, basic requirement, examination of pipe work components and materials, machining of piping, welding and heat-treatment after welding of piping, piping installation, inspection, examination and test for piping, blowing and cleaning of piping, etc.. There have been some significant changes in this Code in the following technical aspects. 1. The non-applicable scope was deleted. 2. The Chapter of Terms was added. 3. The evaluation provisions for "Excellent" grade engineering was deleted and the inspection item was modified to dominant item and general item. 4. Provisions for the permissible deviation of measured value and quantity value of the random inspection point in sub-item project were deleted. 5. Provisions for general quality acceptance of miter elbow, welded lap joint, piping support and hanger fabrication were added. 6. Relevant provisions for quality acceptance of welded connection of branch pipe and main pipe as well as the fillet weld of flange were added. 7. Provisions for the general quality acceptance of zirconium non-ferrous piping, jacketed pipes and valves installation were added. 8. Provisions for the examination grade division of piping welded seam as well as provisions for quality acceptance of technical level of welded seam surface non-destructive examination, welded seam radiographic and ultrasonic examination were added. 9. Requirements for the relevant quality acceptance of hydraulic pressure test and pneumatic test were supplemented. The provisions printed in bold type in this code are compulsory provisions and must be enforced strictly. The Ministry of Housing and Urban-Rural Development of the People's Republic of China is in charge of the administration of this code and the explanation of the compulsory provisions, the Branch on Chemical Industry of China Association for Engineering Construction Standardization is in charge of the current management of this code, and the National Administrative Center of Standardization of Chemical Construction is responsible iv

Table of Contents

1 General Provision ... 1 2 Terms ... 1 3 Basic Requirement ... 1 3.1 Division for Acceptance of Constructional Quality... 2 3.2 Acceptance of Constructional Quality ... 2 3.3 Procedure and Organization for Acceptance of Constructional Quality ... 3 4 Examination of Pipe Work Components and Materials... 4 5 Machining of Piping... 6 5.1 Bending Fabrication... 6 5.2 Machining of Rolling Pipe... 7 5.3 Flanging Edge of Pipe... 8 5.4 Machining of Jacket Pipe... 8 5.5 Production of Miter Elbow ... 9 5.6 Fabrication of Piping Support and Hanger ... 9 6 Welding and Heat-treatment after Welding of Piping... 10 7 Piping Installation... 12 7.1 General Requirement ... 12 7.2 Piping Prefabricate... 13 7.3 Steel Piping Installation ... 13 7.4 Installation for Piping of Coupling Equipment... 16 7.5 Cast Iron Piping Installation ... 16 7.6 Installation of Stainless Steel Piping and Non-ferrous Piping ... 18 7.7 Installation of Heating Piping ... 19 7.8 Jacket Piping Installation ... 19 7.9 Installation of Anticorrosive Lining Piping ... 20 7.10 Valve Installation ... 20 7.11 Expansion Joint Installation ... 20 7.12 Installation of Piping Support and Hanger... 21 7.13 Installation of Static Electricity Grounding ... 22 8 Inspection, Examination and Test for Piping... 23 8.1 Visual Inspection of Welded Seam ... 23 8.2 Radiographic and Ultrasonic Examinations of Welded Seam ... 25 8.3 Non-destructive Examination of Welded Seam Surface ... 26 8.4 Hardness Examination and Other Inspections ... 27 8.5 Pressure Test ... 28 9 Blowing and Cleaning of Piping ... 31 9.1 Water Flushing ... 31 9.2 Air Blowing ... 32 9.3 Steam Blowing... 32 9.4 Degreasing of Piping ... 33 9.5 Chemical Cleaning... 33 vi 9.6 Oil Cleaning... 34 Appendix A Record of Sub-item Project's Quality Acceptance ... 35 Appendix B Record of Subsection (Sub-subsection) Project's Quality Acceptance ... 36 Appendix C Record of Unit (Sub-unit) Project's Quality Acceptance ... 37 Appendix D Record for Check of Project's Quality Guarantee Materials... 38 Explanation of Wording in This Code ... 40 List of Quoted Standards ... 41 vii

1 General Provision

1.0.1 This Code is formulated in order to unify the quality acceptance method for industrial metallic piping construction, strengthen the technical management and ensure the engineering quality. 1.0.2 This Code is applicable to acceptance of construction quality of industrial metallic piping with design pressure no greater than 42MPa and the design temperature no greater than the allowable operating temperature of materials. 1.0.3 This Code shall be used in conjunction with the current national standards "Unified Standard for Constructional Quality Acceptance of Industrial Installation Engineering" (GB 50252) and "Code for Construction of Industrial Metallic Piping Engineering" (G... ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB 50184-2011 be delivered?

Answer: The full copy PDF of English version of GB 50184-2011 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB 50184-2011_English with my colleagues?

Answer: Yes. The purchased PDF of GB 50184-2011_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB 50184-2011 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB 50184-2011?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 50184-2011 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB 50184-2011?

A step-by-step guide to download PDF of GB 50184-2011_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB 50184-2011".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9