|
US$169.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 21976.6-2012: Escape apparatus for building fire -- Part 6: Escape rope Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB 21976.6-2012 | English | 169 |
Add to Cart
|
3 days [Need to translate]
|
Escape apparatus for building fire -- Part 6: Escape rope
| Valid |
GB 21976.6-2012
|
PDF similar to GB 21976.6-2012
Basic data | Standard ID | GB 21976.6-2012 (GB21976.6-2012) | | Description (Translated English) | Escape apparatus for building fire -- Part 6: Escape rope | | Sector / Industry | National Standard | | Classification of Chinese Standard | C85 | | Classification of International Standard | 13.220.10 | | Word Count Estimation | 7,782 | | Quoted Standard | GB/T 191; GB/T 9969; GA 494 | | Regulation (derived from) | National Standards Bulletin 2012 No. 28 " building fire escape evacuation equipment " series of national standards released | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Chinese standard relates to escape justice models, technical requirements, test methods, inspection rules, marking, packaging, transport and storage. This standard applies to the rope, safety hook and belt (optional) component for building fires occu |
GB 21976.6-2012: Escape apparatus for building fire -- Part 6: Escape rope---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Escape apparatus for building fire.Part 6. Escape rope
ICS 13.220.10
C85
National Standards of People's Republic of China
Building fire escape evacuation equipment
Part 6. escape rope
Issued on. 2012-11-05
2013-06-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
Section 4 of this chapter, Chapter 6, and 7.1 are mandatory, the rest are recommended.
GB 21976 "building fire escape evacuation equipment" includes the following sections.
--- Part 1. with a guide;
--- Part 2. escape ease down;
--- Part 3. escape ladder;
--- Part 4. escape slide;
--- Part 5. emergency escape device;
--- Part 6. escape justice;
--- Part 7. Fire filter self contained breathing apparatus;
--- Part 8. Chemical Oxygen fire self contained breathing apparatus;
This section GB of Section 621 976.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This section presents the People's Republic of China Ministry of Public Security.
This part of the National Standardization Technical Committee appliances Fire Fire accessories Technical Committee (SAC/TC113/SC5) centralized.
This section drafted by. Ministry of Public Security Shanghai Fire Research Institute.
The main drafters of this section. gold Wei, Li Baozhong, Gu Wenjie, Wang Yi, Zhu Yun, Peng Bin Bin.
This section first release.
Building fire escape evacuation equipment
Part 6. escape rope
1 Scope
This section GB 21976 specifies the escape rope models, technical requirements, test methods, inspection rules, marking, packaging, transportation and storage.
This section applies to the ropes, carabiners and safety belts (optional) composed for the event of building fire escape rope single use.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 191 Packaging - Pictorial signs
GB/T 9969 General Instructions industrial products
GA494 fire with fall protection equipment
3 Models
Model methodology escape justice as follows.
Escape Evacuation Equipment
Escape rope
- □
Rope length. integer marked in meters (m)
/ □
Rope Diameter. integer marked in millimeters (mm)
Example.
Length 6m, diameter 9mm escape rope, the model for TS-6/9.
4. Technical Requirements
4.1 Structure
Escape rope core rope should wrap Shengpi cored rope structure. One end of the rope should bight structure and connected to a safety hook the other end optional
With seat belts.
4.2 appearance quality
Escape rope surface should be free of any mechanical damage phenomenon, the whole rope thickness uniformity, consistent with the structure.
4.3 length and diameter
Escape rope diameter of not less than 8mm. Nominal value with the factory control, length tolerance of ± 0.2m, diameter tolerance is ± 0.5mm.
4.4 breaking strength
Minimum escape rope breaking strength of not less than 10kN.
4.5 Elongation
When the load reaches 10% of the minimum breaking strength and elongation of the safety rope shall be not less than 1% and not more than 10%.
4.6 safety hook
4.6.1 Safety hooks shall be of metal material and provided preventing safety device mistakenly open, the safety device should be locked reliably.
4.6.2 safety hook through strength testing, body and safety hook safety device shall not obvious deformation, fracture, loss and other anomalies.
4.7 seatbelt
4.7.1 belt material should be cotton or synthetic material. Bandwidth 40mm ~ 80mm, with a thickness of 1mm ~ 3mm, with a long
1000mm ~ 1800mm, and the length can be adjusted with a buckle by user bust size.
4.7.2 After the strength test the seat belt webbing and buckles and other components shall cause rupture phenomenon.
5 Test methods
5.1 structure and appearance quality inspection
Visual method to escape justice by the structure and appearance quality inspection.
5.2 length and diameter measurement
With universal length measuring measuring rope (ending both ends of the whole rope escape rope not included in length) and diameter. The length and the same rope
3 times the diameter measurements are required, the arithmetic mean of the three.
5.3 breaking strength and elongation test
Carried out according to the method specified in GA494 escape rope breaking strength and elongation testing.
5.4 Test safety hook
5.4.1 by visual inspection reports and viewing the material approach to safety hook structure and materials to be checked.
5.4.2 The safety hook and pull both ends of the upper and lower jigs machine connected safety device in the locked state. Rally stretching speed is set at
30mm/min, and then applying a tensile load 10000N on the hook to keep 5min.
5.5 Test seat belt
5.5.1 by visual inspection reports and viewing materials approach to belt structure and materials to be checked. Then measured with a universal measuring tool
Belt length, width and thickness, measure any 3 points, the arithmetic average of three points.
5.5.2 The two ends of the belt of the upper and lower clamping jig Rally. Rally stretching speed is set at 100mm/min, and then applied to the sample
Plus 6376.5N tensile loads, while maintaining 5min.
6 Inspection rules
6.1 Type inspection
6.1.1 Type inspection requirements of this section shall be the inspection of all projects.
6.1.2 When one of the following conditions, type of inspection should be carried out.
a) identification of new products into production time;
B) after the official production, product structure, materials, production processes are greatly changed;
c) Product Discontinuance more than one year, the production recovery;
d) continuous production for three years;
e) the national quality supervision bodies type inspection requirements.
6.2 factory inspection
6.2.1 Products shall plant quality inspection departments qualified along with the certificate, before the factory.
6.2.2 factory inspection of project-based section 4.1 to 4.7. Wherein 4.1 to 4.3 will be seized items, 4.4 to 4.7 for the sampling project.
6.3 Sampling
6.3.1 Type inspection should be factory inspection of products at random 5 sets.
6.3.2 factory inspection to 500 sets in one batch sample sampling project should not be less than 5 sets; when less than 100 sets of batch sampling projects like
Product should not be less than 2 sets.
6.4 determine the rules
6.4.1 Type inspection
Results type inspection items all satisfy the requirements of this part, judged as qualified.
6.4.2 factory inspection
The test results will be seized items should be fully comply with this part. Any non-conformity, the product should only be resubmitted after rework
test.
Test results of sampling programs should be fully comply with this part. Any non-conformity, should be retested after double sampling; If you still do not match
Co-item, the batch of products as unqualified.
7 signs, packaging, transportation and storage
7.1 marks
7.1.1 Each hook escape rope safety rope loop connecting cord below the body should be no less than 50mm length jacket and a permanent label, the label
It shall include at least the following.
a) Product name, model;
b) the implementation of the standard code;
c) length of the rope;
d) load range;
e) plant names, trademarks;
f) the date of production or serial number;
g) statutory and regulatory requirements of other content labels.
7.1.2 shall be marked on the package the following.
a) Product name, model;
b) production plant name, trademarks, site;
c) the date of production or serial number;
d) the number of products;
e) package dimension. length × width × height (in cm);
f) marked "Oil Pollution Prevention" and "moisture" signs, signs should comply with GB/T 191's.
7.2 Packaging
7.2.1 escape rope and safety hook and other accessories should be placed in an opaque bag textile rope, external wooden box or carton packaging.
7.2.2 should be supplied with the package file.
a) product certification;
b) the product specification;
c) the packing list.
Content 7.2.3 product specification shall comply with GB/T 9969's. Product specification shall include at least the following.
a) Applies to escape rope;
b) manufacturer's name and contact information;
c) the installation, use, inspection methods;
d) safety precautions that may affect product performance instructions, such as temperature, sharp edges, chemical reagents, wear and ultraviolet rays
Radio and so on;
e) the maintenance, storage and cleaning or washing instructions;
f) life cycle and retirement conditions;
g) statutory and regulatory requirements of other content labels.
7.3 Transport
Escape rope during transport should be gently, avoid rain, moisture and insolation; should avoid contact with oil, acid, alkali and other flammable, explosive materials or technology
Learn medicines mixed; when handling, there are not allowed to use barb tools.
7.4 Storage
Escape rope should be stored in a dry, well ventilated room, can not contact with heat, fire, acid and sharp hard objects, can not be exposure.
2102-
6.67912
Rights Proprietary Rights Reserved
ISBN. 155 066 · 1-46175
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 21976.6-2012_English be delivered?Answer: Upon your order, we will start to translate GB 21976.6-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB 21976.6-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB 21976.6-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|