|
||||||||||||||||||||||||||||||
YS/T 3003-2012 English PDFUS$279.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. YS/T 3003-2012: Gold-bearing ore test sample preparation technical specifications YS/T 3003: Evolution and historical versions
Basic data
YS/T 3003-2011: Regulations of the compilation on feasibility study report in the gold industry projects---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Regulations of the compilation on feasibility study report in the gold industry projects ICS 73.060.99 D46 People's Republic of China Gold Industry Standards Gold Industry Project Feasibility Study Report Preparation of specifications Issued on. 2011-05-18 2011-06-01 implementation Ministry of Industry and Information Technology of the People's Republic of China released Table of ContentsIntroduction Ⅴ Introduction Ⅵ 1 Scope 1 1 2 General Requirements 2 and 3 staffing structure 3.1 Subjects 2 3.1.1 Project Overview 2 3.1.2 scheduled basis and principles 2 3.1.3 Construction Conditions 3 3.1.4 outside the scope of the project design and project engineering support precinct 3 3.1.5 Construction Scale and Product Plan 3 3.1.6 The main design 3 3.1.7 environmental protection, energy conservation, safety and health, water and soil conservation and fire 5 3.1.8 Project construction schedule 5 3.1.9 The design of innovative content 5 3.1.10 investment and economic effects of 5 3.1.11 Conclusions, problems and recommendations 6 6 3.2 Market Forecast 3.2.1 product supply and demand forecasts 6 3.2.2 Target Market Analysis 6 3.2.3 The price forecast 6 3.2.4 Product Marketing 7 3.3 Geological Resources 7 3.3.1 Mining and Geological before 7 3.3.2 deposit mining conditions 7 3.3.3 Geological exploration work reviewed 8 3.3.4 Mineral Resources/Reserves 8 3.3.5 infrastructure and productive exploration and sampling and analysis 8 3.3.6 Geological Resources Evaluation 8 3.3.7 Problems and Suggestions 8 3.4 Mining 8 3.4.1 Mining method 8 3.4.2 Mining Area 9 OK 3.4.3 OPEN PIT 9 3.4.4 opencast stripping work 9 3.4.5 Mining Method 10 3.4.6 mine work system and production capacity 10 3.4.7 pioneering transport system 11 3.4.8 Mine Ventilation System 11 3.4.9 Anti-Mine Drainage System 11 3.4.10 Hydraulic placer mining 12 3.4.11 filling material and filling facility 12 3.4.12 Auxiliary facilities 12 3.4.13 underground construction 13 3.4.14 mine infrastructure projects and the amount of capital schedule 13 3.4.15 mine production schedule 13 3.4.16 Mining Machinery 13 3.4.17 Problems and Suggestions 14 14 3.5 beneficiation 3.5.1 Overview 14 3.5.2 ore 14 3.5.3 beneficiation tests 15 3.5.4 design process, the main indicators and operating conditions 15 3.5.5 production capacity and work systems 15 3.5.6 Major equipment selection 15 3.5.7 plant layout and equipment configuration 15 16 3.5.8 Auxiliary facilities 3.5.9 The design of the application of new technology, new equipment 16 3.5.10 The main problem exists and recommendations 16 3.6 Smelting 16 3.6.1 gold refining 16 3.6.2 Gold Smelter 17 3.6.3 Acid 18 3.7 tailings facility 19 19 3.7.1 Design Basis 19 3.7.2 Design of tailings 3.7.3 Tailings transport 20 3.7.4 tailings discharge mode 20 3.7.5 Tailings Reservoir seepage 20 3.7.6 backwater 20 3.7.7 Tailings Management 21 3.7.8 Problems and Suggestions 21 21 3.8 General Layout and Transportation 21 3.8.1 Site Selection 3.8.2 General Layout 21 3.8.3 General layout 22 3.8.4 dump and residue field 22 3.8.5 internal and external transport 23 3.9 Power and communication 23 3.9.1 Power 23 3.9.2 Communication 24 3.10 Automation Instrumentation 25 3.10.1 automation equipment and automation level requirements 25 3.10.2 Computer Management Control System 25 3.11 Drainage 25 3.11.1 Water 25 3.11.2 Drainage 26 3.12 heating, ventilation, air conditioning and heat 26 3.12.1 Design Basis 26 3.12.2 design biography 26 3.12.3 Heating 26 3.12.4 ventilation and dust removal 26 3.12.5 air conditioning 26 3.12.6 Heat 27 3.13 machine, gas, electricity and repair depot 27 3.13.1 machine repair 27 3.13.2 Auto Repair 27 3.13.3 28 oil storage facilities 3.13.4 Warehouse 28 3.14 Civil Engineering 28 3.14.1 Basic profile 28 3.14.2 building structure type 28 3.14.3 29 administrative welfare facilities 3.15 Environmental Protection 29 3.15.1 Design Basis 29 Status 3.15.2 Construction Area Environment 29 3.15.3 major sources and governance programs 29 3.15.4 Environmental Management Organization 29 3.15.5 Environmental Investment estimation 29 The environmental impact of construction projects on the surrounding areas 3.15.6 Analysis 29 3.15.7 Environmental impact assessment conclusions and recommendations 30 3.16 labor safety, industrial hygiene and fire 30 3.16.1 Design Basis 30 3.16.2 Analysis of risk factors and the degree of harm 30 3.16.3 Safety measures 30 3.16.4 Industrial Hygiene 30 3.16.5 Safety and health institutions set Capacity 30 3.16.6 Safety and Health Investment estimation 30 3.16.7 30 fire facilities 31 3.17 Soil and Water Conservation and Reclamation 3.17.1 Basis of Preparation 31 Status 3.17.2 Mining and Water Conservation 31 3.17.3 Factors and mine soil erosion hazard 31 3.17.4 Soil and Water Conservation and Reclamation Scheme 31 Measures to ensure the implementation of the program 31 3.17.5 3.18 energy saving, emission 32 3.18.1 energy consumption indicators and analysis 32 3.18.2 32 energy-saving measures 3.18.3 reduction measures 32 Comprehensive Utilization of Resources 32 3.19 3.19.1 Geological Resources Comprehensive Utilization 32 3.19.2 valuable metals comprehensive recovery resources 32 3.19.3 tailings comprehensive utilization of resources 32 3.19.4 Additional Resources Comprehensive Utilization 32 3.20 Project Implementation Plan 32 3.20.1 Project Scope 32 3.20.2 control project construction period and 32 3.20.3 construction schedule 33 3.21 organization and Capacity 33 3.21.1 organization 33 3.21.2 Labour Capacity 33 3.21.3 labor productivity 33 3.21.4 wages 33 3.21.5 Staff training 34 3.22 Estimated Investment and financing 34 3.22.1 Investment estimation 34 3.22.2 Liquidity estimate 37 3.22.3 financing 37 3.22.4 Total investment 37 3.23 Costs and expenses 37 3.23.1 Costing content 37 3.23.2 costs and costing 38 3.23.3 Cost Analysis 38 3.24 Financial Analysis 38 3.24.1 technical and economic indicators 38 3.24.2 Economic evaluation of basic parameters and instructions 38 3.24.3 Economic Effect Analysis (profit and loss) 39 3.24.4 surplus of capacity analysis 39 3.24.5 solvency analysis 39 3.24.6 Risk Analysis 40 3.24.7 Financial Evaluation conclusions 40 Appendix A (informative) "gold enterprise content and depth feasibility study of the principles of the provisions" relevant drawings 67 Annex B (informative) "gold enterprise content and depth feasibility study of the principles of the provisions" related accessories 68ForewordThe standard proposed by China Gold Association. This standard by the National Gold Standardization Technical Committee (SAC/TC379) centralized. This standard drafting units. China National Gold Group Corporation, Changchun Gold Design Institute. The main drafters of this standard. Wang Zhongmin, Ji Qiang, Zhang articles, Bao Haiwen MEDICINE IN king Amano, Dong Weijun, Li continued, pay Friends of Hill, Lee Chong, Zhao Xiaofeng, Wangjing Rong, Wang Yan, Liu Wei, Xue Shubin, Li Weidong, with the sea Ying, Ren Jinrui Zhang ceremony, Zhen Jianjun, Hua Tiejun.Introduction"Gold Enterprise content and depth feasibility study of the principles of the provisions" in the first edition in September 1988 by the former State Gold Administration Organization Code System, has been promulgated and implemented more than ten years in the gold industry, gold industry feasibility study on construction projects played a better specification for use. With the rapid development of China's market economy, changes in construction management system, changes in national tax and investment regime, the State Council, the country Home Development and Reform Commission, Ministry of Land Resources, Ministry of Environmental Protection, State Administration of Work Safety of mining development proposed new construction Let philosophy and mandatory provisions in the new developments, national and industry requirements to further regulate the conduct and guidelines for resource development. For the Gold Scientific development of mineral resources, sustainable development and comprehensive recycling, resource-saving and environment-friendly green mining enterprises, and mining section Energy conservation, production safety, efficiency, clean target, the gold industry project feasibility study proposed a higher demand, the original feasibility Content and depth of study can not meet the provisions of the current period, the urgent need for the original feasibility study regulations be revised to meet the state's industrial affairs It requires policy adjustments and gold industrial construction projects. In order to strengthen the preliminary work of gold industry construction projects, investment decision-making more scientific and effectively avoid investment risks, summarized in gold "Gold Enterprise content and depth feasibility study of the principles of the provisions" on the basis of experience and industrial projects on the 1988 edition, with reference to domestic and feasible Experience in the preparation and practice of research reports, formulated regulations. According to the National Development and Reform Commission approval number "Industrial Development and Reform Office 2004 [1951] supplementary program requirements," May 2008 Changchun Gold Design Institute Start of the former State Gold Administration Edition 1988 "gold enterprises feasibility study content and depth of principles laid down" revision, in 2...... |