GB/T 40130-2021 English PDFUS$929.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 40130-2021: Specifications for special hydrogeological exploration in coal mines Status: Valid
Basic dataStandard ID: GB/T 40130-2021 (GB/T40130-2021)Description (Translated English): Specifications for special hydrogeological exploration in coal mines Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: D14 Word Count Estimation: 50,572 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 40130-2021: Specifications for special hydrogeological exploration in coal mines---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Specifications for special hydrogeological exploration in coal mines ICS 07.060 D14 National Standards of People's Republic of China Specifications for special hydrogeological surveys for coal mines Released on 2021-05-21 2021-12-01 implementation State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee Table of contentsForeword Ⅰ Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General 3 5 Prospecting method and technology 7 6 Design book preparation 14 7 Mine hydrogeological survey 15 8 Special hydrogeological survey 19 9 Hydrogeological survey of open-pit coal mine 23 10 Hydrogeological survey of Kukeng coal mine 25 11 Report preparation and acceptance 26 Appendix A (informative appendix) Commonly used hydrological and geophysical exploration methods and applicable conditions 27 Appendix B (Normative Appendix) Design Document Outline 29 Appendix C (informative appendix) Water inrush risk assessment method 32 Appendix D (informative appendix) Common methods and formulas for mine water inflow evaluation 36 Appendix E (informative appendix) Calculation method of water accumulation in old goaf 40 Appendix F (Normative Appendix) Survey Report Outline 42ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed by the Ministry of Natural Resources of the People's Republic of China. This standard is under the jurisdiction of the National Standardization Technical Committee for Natural Resources and Land and Space Planning (SAC/TC93). Drafting organizations of this standard. China Coal Geology Bureau Hydrogeology Bureau, China Coal Geology Bureau, China Coal Geology Group Co., Ltd., China Institute of Natural Resources Economics. The main drafters of this standard. Shen Zhihui, Sun Yuchen, Ren Hujun, Duan Jianjun, Shen Wenjin, Wang Xin, Hu Jianqing, Yang Guanghui, Liu Yeqing, Zhai Lijuan, Zhang Lai, Li Xibin, Lin Guohua, Bai Xiqing, Lu Binfa, Jia Pengzhou, Li Zhenshuan, Niu Zhigang, Wang Zhiqi, Xiangxiang Qing, Li Benjun, Ma Ruihua, Zhao Pu.IntroductionWith the deepening of coal mining in the east of my country, the development and utilization of coal resources in the west, the advancement of mining technology and the changes in mining methods The hydrogeological conditions of coal mines have become more complex and diverse. At the same time, the exploration technology has also improved. In order to standardize the hydrogeological exploration of coal mines, This standard is specially formulated for the quality of coal mine hydrogeological survey results to meet the needs of coal mine water prevention and control work. This standard is based on Earth System Science And groundwater system theory and methods, combined with decades of coal mine water prevention and hydrogeological exploration work experience results based on the formulation. Specifications for special hydrogeological surveys for coal mines1 ScopeThis standard specifies the general principles of special hydrogeological surveys, survey methods and technologies, mine hydrogeological surveys, special hydrogeological surveys, Basic requirements for hydrogeological survey of open-pit coal mines, hydrogeological survey of closed pit coal mines, design documents and reports. This standard is applicable to the hydrogeological survey in the whole process of coal mine design, construction, production, and pit closure.2 Normative referencesThe following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated reference documents, the latest version (including all amendments) is applicable to this document. GB 8537 National Food Safety Standard Drinking Natural Mineral Water GB 51060-2014 Specification for hydrogeological exploration of non-ferrous metal mines DZ/T 0080 Coal Geophysical Logging Specification DZ/T 0148 Hydrological and Water Well Geological Drilling Regulations MT/T 897 Coal Seam Gas Seismic Exploration Specification MT/T 898 Coal Electricity Exploration Specification3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Specialhydrogeological explorationincoalmines In order to ascertain the hydrogeological conditions of coal mines, hydrogeological work using comprehensive methods such as hydrogeological surveying and mapping, geophysical prospecting, drilling, and testing. Note. According to coal mining method and purpose tasks, it can be divided into mine hydrogeological survey, special hydrogeological survey, open pit coal mine hydrogeological survey, closed pit coal Mineral hydrogeological survey. 3.1.1 Minehydrogeological exploration In order to find out the water filling conditions of the mine, comprehensive methods such as hydrogeological surveying and mapping, geophysical prospecting, drilling, and testing are used to predict and evaluate the water inflow in the mine. Hydrogeological work with the risk of water inrush. 3.1.2 Open-pitcoalmine hydrogeological exploration In order to ascertain the hydrogeological conditions of open-pit coal mines, comprehensive methods such as hydrogeological surveying and mapping, geophysical prospecting, drilling and testing are used to predict mine drainage Hydrogeological work of water volume. 3.2 Water-filing aquifer The mine tunnel project or the open pit exposes the aquifer that fills the mine with water within the affected area. 3.2.1 Main water-filing aquifer Under the mining conditions of the ore deposit, one or more aquifers with a large water-filled capacity are generated in the shaft. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 40130-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 40130-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 40130-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 40130-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |