Powered by Google-Search & Google-Books Chinese Standards Shop Database: 169760 (Sep 19, 2020)
HOME   Quotation   Tax   Examples Standard-List   Contact-Us   View-Cart
  

TB10106-2010

Chinese Standard: 'TB10106-2010'
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusRelated Standard
TB 10106-2010English595 Add to Cart 0--15 minutes. Auto immediate delivery. Technical Code for Ground Treatment of Railway Engineering Valid TB 10106-2010
TB 10106-2010Chinese99 Add to Cart <=1-day [PDF from Chinese Authority, or Standard Committee, or Publishing House]

  Google-Books (Full-PDF will be auto-delivered in 0~10 mins):   TB 10035-2018  TB/T 2487-2016  TB 10001-2016  TB 10106-2010  TB 10054-2010
In 0~10 minutes time, full copy of this English-PDF will be auto-immediately delivered to your email. See samples for translation quality.  
TB 10106-2010
TB
NATIONAL INDUSTRY STANDARD OF
THE PEOPLE’S REPUBLIC OF CHINA
UDC
J 1078-2010
Technical Code for Ground
Treatment of Railway Engineering
铁路工程地基处理技术规程
ISSUED ON. AUGUST 3, 2010
IMPLEMENTED ON. AUGUST 3, 2010
Issued by. Ministry of Railways of the People's Republic of China
How to BUY & immediately GET a full-copy of this standard?
2. Search --> Add to Cart --> Checkout (3-steps);
3. No action is required - Full-copy of this standard will be automatically &
immediately delivered to your EMAIL address in 0~60 minutes.
Table of Contents
Notice on Issuing Technical Code for ... 3 
Ground Treatment of Railway Engineering .. 3 
Foreword ... 6 
1 General .. 8 
2 Terms, symbols .. 10 
3 Basic rules ... 15 
4 Replacement cushion ... 27 
5 Impact roller (vibration) compaction .. 31 
6 Dynamic compaction and dynamic replacement ... 34 
7 Packed drain and plastic plate for drainage... 39 
8 Crushed stone pile ... 45 
9 Sand compaction pile ... 52 
10 Lime-soil (soil cement) compaction pile ... 55 
11 Pile thrusted-expanded in column-hammer ... 62 
12 Cement-mixed pile ... 66 
13 Jet grouting pile ... 71 
14 Cement-fly ash-gravel pile and plain concrete pile ... 75 
15 RC pile-net (pile-raft) structure ... 79 
16 RC pile-plank structure ... 84 
17 Grouting ... 90 
Annex A Applicable Conditions for Common Ground Treatment Methods in
Railway Engineering ... 95 
Annex B Single pile load test of composite ground ... 97 
Annex C Composite ground load test ... 100 
Annex D Calculation of ground settlement .. 103 
Explanation of words in this Code ... 115 
Foreword
This Code was drafted based on the requirements of “Notice on publishing
Railway Construction Standards Preparation Plan in 2007 (Railway-
Construction [2016] No.1112)”.
During the process of compiling, this Code CONDUCTED extensive and in-
depth investigations into the current domestic and international regulations for
ground treatment, earnestly SUMMARIZED the experience and lessons
learned in the design, construction and operation of the railway engineering
ground treatment in China, ABSORBED the ground treatment experiences,
scientific research from Zhengzhou-Xi’an, Wuhan-Guangzhou, Beijing-Tianjin,
Shanghai-Nanjing, Jiaoji (Shandong), Zhejiang-Jiangxi, Sui Yu, Fuzhou-
Xiamen, Wenzhou-Fuzhou and other new railway construction, with reference
to relevant technical specifications at home and abroad. The final draft was on
the basis of extensive solicitation of opinions and repeated review.
This Code consists of 17 clauses, including. General, Terms, symbols, Basic
rules, Replacement cushion, Impact roller (vibration) compaction, Dynamic
compaction and dynamic replacement, Packed drain and plastic plate for
drainage, Crushed stone pile, Sand compaction pile, Lime-soil (soil cement)
compaction pile , Pile thrusted-expanded in column-hammer, Cement-mixed
pile , Jet grouting pile, Cement-fly ash-gravel pile and plain concrete pile, RC
pile-net (pile-raft) structure, RC pile-plank structure, Grouting, together with 4
annexes.
The main technical contents of this Code are as follows.
1 It specifies the preparation purpose, application scope, principles for ground
treatment of this Code.
2 Aiming at the characteristics of ground treatment of railway engineering, it
specifies the design principle that shall be based on stability and settlement
deformation control.
3 It specifies that the ground stability shall be checked according to the
construction period and operation period. The range of safety factor of railway
with different speed grade is given. It specifies the method of correcting the
stability and safety factor of slope weak ground.
4 For different speed grades of railway and ground conditions, it specifies the
calculation of the thickness of the ground compression layer, the calculation
method for settlement of different ground.
5 Aiming at the characteristics of flexible grounds such as subgrade and yard,
it provides the method of correcting the allowable bearing capacity of ground.
Technical Code for Ground
Treatment of Railway Engineering
1 General
1.0.1 This Code was formulated so as to unify the technical standards of
ground treatment of railway engineering, make the ground treatment of railway
engineering comply with the requirements of safety, advanced technology and
economic rationality.
1.......
Related standard:   TB 10097-2019  TB 10100-2018
   
 
Privacy   ···   Product Quality   ···   About Us   ···   Refund Policy   ···   Fair Trading   ···   Quick Response
Field Test Asia Limited | Taxed in Singapore: 201302277C | Copyright 2012-2020