HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (9 Feb 2025)

TB/T 3396.7-2015 PDF English


Search result: TB/T 3396.7-2015 English: PDF (TB/T3396.7-2015)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
TB/T 3396.7-2015English130 Add to Cart 0-9 seconds. Auto-delivery. Test methods for fastening systems of high-speed railway - Part 7: Vertical load test for cast-in fastening components Valid
BUY with any currencies (Euro, JPY, GBP, KRW etc.): TB/T 3396.7-2015     Related standards: TB/T 3396.7-2015

PDF Preview: TB/T 3396.7-2015


TB/T 3396.7-2015: PDF in English (TBT 3396.7-2015)

TB/T 3396.7-2015 TB RAILWAY INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 45.080 S 12 Test Methods for Fastening Systems of High-Speed Railway – Part 7: Vertical Load Test for Cast-In Fastening Components ISSUED ON: JULY 15, 2015 IMPLEMENTED ON: FEBRUARY 01, 2016 Issued by: National Railway Administration of the People’s Republic of China Table of Contents Foreword ... 3 1 Scope ... 4 2 Principle ... 4 3 Test Equipment ... 4 4 Test Piece... 4 5 Test Procedures ... 4 6 Test Report ... 5 Foreword TB/T 3396 Test Methods for Fastening Systems of High-Speed Railway consists of the following 7 parts: --- Part 1: Determination of Longitudinal Rail Restraint; --- Part 2: Determination for Clamping Force; --- Part 3: Determination of Static Stiffness for Fastening Assembly; --- Part 4: Test of Fatigue Performance of Fastening Assembly; --- Part 5: Determination of Electrical Resistance; --- Part 6: Effect of Severe Environmental Conditions; --- Part 7: Vertical Load Test for Cast-in Fastening Components. This Part is Part 7 of TB/T 3396. This Part was drafted as per the rules specified in GB/T 1.1-2009. This Part shall be under the jurisdiction of Institute of Standards and Metrology, China Academy of Railway Sciences. Drafting organizations of this Part: Railway Engineering Research Institute, China Academy of Railway Sciences. Chief drafting staffs of this Part: Zhao Rukang, Xiao Junheng, Fang Hangwei, Xu Shaohui, and Li Zirui. Test Methods for Fastening Systems of High-Speed Railway – Part 7: Vertical Load Test for Cast-In Fastening Components 1 Scope This Part specifies the indoor test method for the pull-out resistance for pre-embedded parts of fastener. This Part applies to fastening systems for high-speed railway. 2 Principle A vertical load is applied to the pre-embedded parts of the fastener pre-embedded in the concrete; and the pull-out resistance of the pre-embedded part is determined by the load retention capacity during the test and the state of the joint between the pre-embedded part and the concrete after the test. 3 Test Equipment 3.1 Loading equipment The equipment with loading rate of 40kN/min~60kN/min, static loading capacity reaching 150kN, which applies the vertical load. 3.2 Load sensor The instrument that applies load to the pre-embedded part, with accuracy of Class-1. 4 Test Piece Sleeper with pre-embedded part of fastener, 1/2 sleeper or track slab (all described as sleeper in this test method). 5 Test Procedures For the pre-embedded casing where the embedded parts are screwed in by bolts, the load shall ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.