HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189760 (8 Feb 2025)

GB/T 39117-2020 PDF English


Search result: GB/T 39117-2020 English: PDF (GB/T39117-2020)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB/T 39117-2020English170 Add to Cart 0-9 seconds. Auto-delivery. Maturity assessment method of intelligent manufacturing capability Valid
BUY with any currencies (Euro, JPY, GBP, KRW etc.): GB/T 39117-2020     Related standards: GB/T 39117-2020

PDF Preview: GB/T 39117-2020


GB/T 39117-2020: PDF in English (GBT 39117-2020)

GB/T 39117-2020 NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 35.240.50 L 70 Maturity assessment method of intelligent manufacturing capability ISSUED ON: OCTOBER 11, 2020 IMPLEMENTED ON: MAY 1, 2021 Issued by: State Administration for Market Regulation; Standardization Administration of PRC. Table of Contents Foreword ... 3 1 Scope ... 4 2 Normative references ... 4 3 Terms and Definitions ... 4 4 Assessment content ... 5 5 Assessment process ... 7 6 Maturity level determination ... 10 References ... 16 Maturity assessment method of intelligent manufacturing capability 1 Scope This standard specifies the maturity assessment content, assessment process, and maturity level determination method of intelligent manufacturing capability. This standard applies to manufacturing enterprises, intelligent manufacturing system solution suppliers and third parties to carry out assessment activities of the maturity of intelligent manufacturing capability. 2 Normative references The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) is applicable to this standard. GB/T 39116-2020 Maturity model of intelligent manufacturing capability 3 Terms and Definitions The terms and definitions defined in GB/T 39116-2020 and the followings apply to this document. 3.1 assessment domain A collection of core terms for conducting maturity assessments of intelligent manufacturing capability. 3.2 assessment criteria A set of policies, procedures, or requirements for comparison with assessment evidence. Note: Rewrite “3.2 Terms and Definitions” of GB/T 19011-2013. 3.3 assessment findings The result of evaluating the collected assessment evidence against the assessment criteria. a) They shall comply with the corresponding assessment requirements; b) They shall master the application of assessment principles, assessment procedures and methods; c) The assessment shall be carried out at the planned time; d) Priority shall be given to important issues; e) Evidence of assessment shall be obtained through effective interviews, observations, reviews of documents and records, data collection, etc.; f) The adequacy and appropriateness of the assessment evidence shall be confirmed to support the assessment findings and assessment conclusions; g) Assessment findings shall be documented and appropriate assessment reports shall be prepared; h) The confidentiality and security of information, data, documents, and records shall be maintained; i) The various risks associated with the assessment shall be identified. While performing the duties of the assessment team members, the assessment team leader shall also perform the following responsibilities: a) Take the responsibility for the preparation of the assessment plan; b) Take the responsibility for the implementation of the entire assessment activity; c) Train the assessment team members on assessment methods before the implementation of the formal assessment; d) Evaluate the assessment team members objectively; e) Make a final decision on the assessment results; f) Report assessment findings to the assessee, including strengths, weaknesses, and items that need improvement; g) Release on-site assessment conclusions at the end of the assessment activities. 5.2.3 Prepare an assessment plan The maturity assessment of intelligent manufacturing capability is divided into two stages: on-site pre-assessment and formal assessment. Before the assessment, a pre- assessment plan and a formal assessment plan shall be prepared and confirmed with the assessee. The assessment plan shall at least include assessment purpose, assessment scope, assessment tasks, assessment time, assessors, assessment schedule, etc. 5.2.4 On-site pre-assessment The assessment team shall focus on the needs of the assessee: a) Understand the basic situation of the assessed party’s intelligent manufacturing; b) Understand the direct or indirect evidence available from the assessed party; c) Determine the assessed party’s assessment domains and weights of each domain; d) Determine the feasibility of formal assessment implementation. 5.3 Formal assessment 5.3.1 Opening meeting Purpose of the opening meeting: a) Confirm that the relevant parties have agreed on the arrangements for the assessment plan; b) Introduce the assessors; c) Ensure that planned assessment activities can be implemented. The content of the meeting shall at least include an explanation of the purpose of the assessment, an introduction of the assessment method, confirmation of the assessment schedule, and clarification of other matters that need to be communicated in advance. 5.3.2 Collect assessment evidence In the implementation process of the assessment, evidence related to the assessment objectives, assessment scope, and assessment criteria shall be collected and verified through appropriate methods, including information on functions, activities, and processes related to intelligent manufacturing. The evidence collected shall be recorded, and the collection methods may include interviews, observations, on-site inspections, reviews of documents and records, demonstration of information systems, and data collection. 5.3.3 Form assessment findings The evidence collected shall be compared with the degree of satisfaction specified in the assessment criteria to form the assessment findings. Specific assessment findings shall include evidence-supported compliance and good practices, directions for improvement, and weaknesses. The assessment team shall reach a consensus on the assessment findings, and conduct intra-group reviews if necessary. 5.3.4 Determine the maturity level According to the scoring result of each item, calculate the score of the enterprise by combining them with the weight of each capability domain, and determine the maturity level finally. Note: See Chapter 6 for the principle of maturity level determination. 5.3.5 Form an assessment report The assessment team shall form an assessment report, and the assessment report shall at least include a summary of the assessment activities, assessment conclusions, assessed strengths, assessed weaknesses, and improvement directions. 5.4 Release on-site assessment results 5.4.1 Communicate assessment results After completing the on-site assessment activities, the assessment team shall notify the assessment results to the representative of the assessed party and give the assessed party the opportunity to demonstrate again; the final result is determined by the assessment team. 5.4.2 Closing meeting Purpose of the closing meeting: a) Summarize the assessment process; b) Release assessment findings and assessment conclusions. The content of the closing meeting shall at least include an assessment summary, assessment results, assessed strengths, assessed weaknesses, improvement directions, and introduction of follow-up related activities. 5.5 Improve and promote On basis of on-site assessment results, the assessed party shall propose the improvement direction of intelligent manufacturing, formulate corresponding measures, and carry out the improvement activities for intelligent manufacturing capacity. 6 Maturity level determination 6.1 Scoring method ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.