HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (9 Feb 2025)

GB/T 35070.4-2018 PDF English


Search result: GB/T 35070.4-2018 English: PDF (GB/T35070.4-2018)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB/T 35070.4-2018English150 Add to Cart 0-9 seconds. Auto-delivery. Parking electronic toll collection -- Part 4: Technical specification for key equipment testing Valid
BUY with any currencies (Euro, JPY, GBP, KRW etc.): GB/T 35070.4-2018     Related standards: GB/T 35070.4-2018

PDF Preview: GB/T 35070.4-2018


GB/T 35070.4-2018: PDF in English (GBT 35070.4-2018)

GB/T 35070.4-2018 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 35.240.60; 35.240.15 R 07 Parking Electronic Toll Collection - Part 4: Technical Specification for Key Equipment Testing ISSUED ON: MAY 14, 2018 IMPLEMENTED ON: DECEMBER 1, 2018 Issued by: State Administration for Market Regulation; Standardization Administration of the People’s Republic of China. Table of Contents Foreword ... 3  1 Scope ... 4  2 Normative References ... 4  3 Terms and Definitions ... 5  4 Abbreviations ... 5  5 RSU Test Items and Test Methods ... 6  6 Test Items and Test Methods of IC Card Read-write Terminal ... 14  Appendix A (Normative) IC Card Read-write Terminal Transaction Process Test Case ... 20  Parking Electronic Toll Collection - Part 4: Technical Specification for Key Equipment Testing 1 Scope This Part of GB/T 35070 specifies the test items and test methods of road-side unit and IC card read-write terminal of parking electronic toll collection system. This Part is applicable to the testing of key equipment, which adopts non-cash payment card or implements automatic payment through dedicated short-range communication protocol in parking electric toll collection system and vehicle access management system. 2 Normative References The following documents are indispensable to the application of this Standard. In terms of references with a specified date, only versions with a specified date are applicable to this Standard. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this Standard. GB/T 2423.1 Environmental Testing for Electric and Electronic Products - Part 2: Test Methods - Tests A: Cold GB/T 2423.2 Environmental Testing for Electric and Electronic Products - Part 2: Test Methods - Tests B: Dry Heat GB/T 2423.5 Environmental Testing for Electric and Electronic Products - Part 2: Test Methods - Test Ea and Guidance: Shock GB/T 2423.10 Environmental Testing for Electric and Electronic Products - Part 2: Test Methods - Test Fc: Vibration (sinusoidal) GB/T 4208-2017 Degrees of Protection Provided by Enclosure (IP code) GB/T 18239-2000 Generic Specification for Integrated Circuit Card Reader GB/T 20135-2006 Intelligent Transport Systems - Electronic Toll Collection - System Architecture GB/T 20851.1-2007 Electronic Toll Collection - Dedicated Short Range Communication - Part 1: Physical Layer GB/T 20851.2-2007 Electronic Toll Collection - Dedicated Short Range BST: Beacon Service Table CPU: Central Processing Unit DSRC: Dedicated Short Range Communication e.i.r.p: equivalent isotropically radiated power IC: Integrated Circuit MAC: Message Authentication Code PSAM: Purchase Secure Access Module RSU: Roadside Unit SAM: Secure Access Module VST: Vehicle Service Table 5 RSU Test Items and Test Methods 5.1 Test Conditions 5.1.1 Test site and configuration RSU test site and configuration shall comply with the requirements in 5.1 in GB/T 20851.5-2007. 5.1.2 Test signal RSU test signal shall comply with the requirements in 5.2 in GB/T 20851.5-2007. 5.1.3 Test status The test RSU shall be able to receive and transmit test signals in accordance with the requirements in 5.2 in GB/T 20851.5-2007 and test demands. The test RSU shall be able to consecutively transmit carrier wave; modulate unencoded pseudorandom binary sequence (PN9) signal (whose cycle is 511 Bits) at work frequency and all zero code of FM0 coding. The test RSU shall be able to draw forth the post-demodulation received data and clock signal; provide test points. 5.2 Physical Layer 5.2.1 Carrier frequency and frequency tolerance Carrier frequency and frequency tolerance shall be tested in accordance with the stipulations in 6.2 in GB/T 20851.5-2007. Test result shall comply with the stipulations a) Power up the test RSU; set it up to transmit BST; b) The test equipment receives the BST; judges its correctness; returns VST; c) The test RSU receives the VST from the test equipment; judges the correctness of the VST; registers its MAC address; d) The test RSU transmits Get_Secure.request to read vehicle’s information file; e) Judge whether the test RSU correctly transmits Get_Secure.request; f) The test equipment receives Get_Secure.request transmitted by the test RSU; returns Get_Secure.response; g) Monitor the test RSU’s data reception; judge whether the Get_Secure.response file received by the test RSU has a correct structure and content; h) Test and verify whether the security authentication is correct. The test result shall comply with the stipulations in 5.1.2, 5.1.3 and 5.2 in GB/T 35070.2-2018. 5.3.4 Transfer_Channel primitive test Please see the test methods below: a) Power up the test RSU; set it up to transmit BST; b) The test equipment receives the BST; judges its correctness; returns VST; c) The test RSU receives the VST from the test equipment; judges the correctness of the VST; registers its MAC address; d) The test RSU transmits Transfer_Channel.request; uses IC card instruction to complete the application operation; e) Judge whether the test RSU correctly transmits Transfer_Channel.request; f) The test equipment receives Transfer_Channel.request transmitted by the test RSU; returns Transfer_Channel.response; g) Monitor the test RSU’s data reception; judge whether the Transfer_Channel.response file received by the test RSU has a correct structure and content; h) Test and verify whether the security authentication is correct. The test result shall comply with the stipulations in 5.1.2, 5.1.3 and 5.2 in GB/T 35070.2-2018. b) The test equipment and the test RSU complete a spliced transaction process of compound transaction; c) Judge whether the transaction process is correctly completed; d) Judge whether the security authentication can correctly authenticate; e) Judge whether data in the transaction process is correct. The test result shall comply with the stipulations in 5.1.2, 5.1.3 and 5.2 in GB/T 35070.2-2018. 5.4 Environment 5.4.1 High-temperature test RSU high-temperature test shall comply with Test Bd in GB/T 2423.2: high-temperature test of heat-dissipating test sample temperature gradient. In addition, a) Temperature: the upper limit of the temperature range stipulated in 5.2 in GB/T 35070.2-2018; b) Duration: 2 h. The test result shall comply with the stipulations in 5.2 in GB/T 35070.2-2018. 5.4.2 Low-temperature test RSU low-temperature test shall comply with Test Ad in GB/T 2423.1: low-temperature test of heat-dissipating test sample temperature gradient. In addition, a) Temperature: the lower limit of the temperature range stipulated in 5.2 in GB/T 35070.2-2018; b) Duration: 2 h. The test result shall comply with the stipulations in 5.2 in GB/T 35070.2-2018. 5.4.3 Impact test RSU impact test shall comply with the stipulations in GB/T 2423.5. In addition, a) Pulse waveform: half-sine pulse; b) Peak acceleration: 300 m/s2; c) Duration: 18 ms. The test result shall comply with the stipulations in 5.2 in GB/T 35070.2-2018. R---transaction success rate; NC---number of successful transactions; N---total number of transactions. Transaction success rate shall comply with the stipulations in 5.4 in GB/T 35070.2- 2018. 6 Test Items and Test Methods of IC Card Read-write Terminal 6.1 Test Conditions of IC Card Read-write Terminal 6.1.1 Test conditions Test conditions shall comply with the requirements in 5.1 in GB/T 18239-2000. 6.1.2 Test status The test IC card’s read-write terminal shall have complete software and hardware. Under power-on state, install test PSAM card in the IC card read-write terminal. It shall be able to complete the consumption process verification in GB/T 35070.3 with the test contactless IC card. 6.2 Environment Conduct the test in accordance with the stipulations in 5.7 in GB/T 18239-2000. The test result shall comply with the stipulations in 6.1.1 in GB/T 35070.2-2018. 6.3 Security Conduct the test in accordance with the stipulations in 5.4 in GB/T 18239-2000. The test result shall comply with the stipulations in 6.1.2 in GB/T 35070.2-2018. 6.4 Reliability Conduct the test in accordance with the stipulations in 5.5 in GB/T 18239-2000. The test result shall comply with the stipulations in 6.1.3 in GB/T 35070.2-2018. 6.5 Electromagnetic Compatibility Conduct the test in accordance with the stipulations in 5.6 in GB/T 18239-2000. The test result shall comply with the stipulations in 6.1.4 in GB/T 35070.2-2018. 6.6 Appearance and Structure 6.7.3 Communication protocol 6.7.3.1 Test equipment Test equipment: terminal protocol test equipment. 6.7.3.2 Test methods Please see the test methods below: a) Use terminal protocol test equipment to gather the sequence of instructions generated by the IC card reader and writer; record parameters (opening, conflict prevention, chain processing and frame structure, etc.) of the IC card reader and writer during the protocol execution process; b) Use terminal protocol characteristic test equipment; in the polling stage, gather the sequence of instructions generated by the IC card reader and writer; before IC card reader and writer transmits every Type A and Type B wake-up instruction, record the time that the IC card reader and writer takes to transmit the carrier wave; c) During communication interaction, gather the sequence of instructions generated by the IC card reader and writer; record parameters (opening, conflict prevention, chain processing and frame structure, etc.) of the IC card reader and writer during the protocol execution process. The test result shall comply with the stipulations in 6.3.1 in GB/T 35070.2-2018. 6.8 Display Module and Voice Module 6.8.1 Test equipment Test equipment: contactless test CPU card; test PSAM card. 6.8.2 Test methods Please see the test methods below: a) Take Appendix A as a reference to write IC card transaction process test case; b) Set up the compound consumption transaction amount on the test IC card’s read-write terminal to be 1 RMB; c) Use the test CPU card to swipe the card; coordinate with the test PSAM to complete the compound consumption transaction test. Conduct manual observation; record the result displayed by the IC card read-write terminal and the result shown by the indicator light. Conduct manual monitoring of the output voice and beeping prompt from the loudspeaker. b) Under the operating state, place the IC card read-write terminal for 24 h; c) At the same moment, record the time of the clock synchronization system and the time of the IC card read-write terminal; d) Calculate the difference between the time of the clock synchronization system and the time of the IC card read-write terminal. The test result shall comply with the stipulation in 6.3.7 in GB/T 35070.2-2018. 6.13 Program Download Interface 6.13.1 Test equipment Test equipment: test host (preload IC card read-write terminal firmware download program and firmware program). 6.13.2 Test methods Please see the test methods below: a) Initialize the IC card read-write terminal; conduct manual inspection to see whether the terminal’s version number is the initial version number; b) Use wires to connect the test host and IC card read-write terminal’s program download interface; c) On the test host, operate the firmware download program; update IC card read- write terminal’s firmware program; d) Inspect the firmware program version of the IC card read-write terminal. The replacement of the IC card read-write terminal’s firmware program is successful. The update of the version number is successful. 6.14 Communication Interface 6.14.1 Test equipment Test equipment: test host (preload data transmission and reception test program). 6.14.2 Test methods Please see the test methods below: a) Connect the test host and the test IC card’s read-write terminal communication interface (wired or wireless); b) Use data transmission and reception test program; write a script to implement Appendix A (Normative) IC Card Read-write Terminal Transaction Process Test Case A.1 Consumption A.1.1 Test objective Test e-wallet consumption functions. A.1.2 Test methods In accordance with the following methods, test e-wallet consumption functions: a) Correctness test: ---Reset, choose networked toll collection application; ---Read the balance; ---Consumption initialization; ---Execute consumption; ---Read transaction authentication code. b) When consumption initialization is not executed, and consumption transaction is directly conducted, return to “6901”; c) When key identifier is not correct, consumption initialization shall return to “9403”; d) When consumption initialization is successful, MAC in consumption time message is not correct, return to “9302”; e) When the amount of transaction is larger than the wallet balance, consumption initialization shall return to “9401”. A.2 Parking Entry A.2.1 Test objective Test parking entry transaction process. A.2.2 Test methods ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.