HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (8 Dec 2024)

GB/T 23711.5-2019 PDF in English


GB/T 23711.5-2019 (GB/T23711.5-2019, GBT 23711.5-2019, GBT23711.5-2019)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB/T 23711.5-2019English115 Add to Cart 0-9 seconds. Auto-delivery. Test method for pressure vessels lined with plastics -- Part 5: Cold-hot cycling inspection Valid
GB/T 23711.5-2009English319 Add to Cart 3 days Expansion and contraction test method for pressure vessels lined with fluoroplastics Obsolete
Standards related to (historical): GB/T 23711.5-2019
PDF Preview

GB/T 23711.5-2019: PDF in English (GBT 23711.5-2019)

GB/T 23711.5-2019 NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 71.120;83.140 G 94 Replacing GB/T 23711.5-2009 Test method for pressure vessels lined with plastics - Part 5: Cold-hot cycling inspection ISSUED ON: DECEMBER 10, 2019 IMPLEMENTED ON: NOVEMBER 01, 2020 Issued by: State Administration for Market Regulation; Standardization Administration of the People’s Republic of China. Table of Contents Foreword ... 3  1 Scope ... 5  2 Normative references ... 5  3 Test device ... 5  4 Sample ... 6  5 Test method ... 6  6 Test result judgment ... 7  7 Test report ... 8  Appendix A (Informative) Cold-hot cycling test report ... 9  Foreword GB/T 23711, Test method for pressure vessels lined with plastics, is divided into 8 parts: -- Part 1: Spark testing; -- Part 2: Low-temperature testing; -- Part 3: High-temperature inspection; -- Part 4: Negative pressure inspection; -- Part 5: Cold-hot cycling inspection; -- Part 6: Anti pressure testing; -- Part 7: Leak testing; -- Part 8: High-resistance testing. This Part is the 5th part of GB/T 23711. This Part was drafted in accordance with the rules given in GB/T 1.1-2009. This Standard replaces GB/T 23711.5-2009, Expansion and contraction test method for pressure vessels lined with fluoroplastics; compared with GB/T 23711.5-2009, the main technical changes, except editorial changes, are as follows: -- In "Scope", add plastic lining materials such as rigid polyvinyl chloride (PVC-U), chlorinated polyvinyl chloride (PVC-C), polyethylene (PE) (see Chapter 1); -- Modify the schematic diagram of the testing machine (see Figure 1, Figure 1 of version 2009); -- Add requirements for safety protection of the testing machine (see 3.2); -- Add requirements for the sample dimensions (see Chapter 4, Chapter 4 of version 2009); -- Remove requirements for the thermometer and the operating temperature of the to-be-inspected pressure vessel (see 5.2 of version 2009); -- Add the heating temperature of plastic lining materials such as PVC-U, PVC-C and PE (see Table 1, Table 1 of version 2009); Test method for pressure vessels lined with plastics - Part 5: Cold-hot cycling inspection 1 Scope This Part of GB/T 23711 specifies the test device, sample, test method, test result judgment and test report of the cold-hot cycling inspection of steel pressure vessels lined with plastics. This Part applies to the cold-hot cycling inspection of steel pressure vessels lined with plastics such as rigid polyvinyl chloride (PVC-U), chlorinated polyvinyl chloride (PVC-C), polyethylene (PE), ethylene-tetrafluoroethylene copolymer (ETFE), fluorinated ethylene propylene (FEP), perfluoroalkoxy alkanes (PFA), polytetrafluoroethylene (PTFE), and polyvinylidene difluoride (PVDF), whose container shell material is steel. 2 Normative references The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document. GB/T23711.1, Test method for pressure vessels lined with plastics - Part 1: Spark testing 3 Test device 3.1 The schematic diagram of the cold-hot cycling test machine is shown in Figure 1. The purpose of the test is to verify the ability of the plastic lining to withstand sudden cold and sudden heat. Note: After 20 times of cold-hot cycling, water bubbles that are generated on the surface of PFA, PTFE, FEP will not affect the performance of the plastic lining and are not considered to be ineffective. 6.2 Use naked eyes to observe the sample; when there is no failure, perform a spark testing according to the method that is specified in GB/T 23711.1. If the spark testing is qualified, determine the cold-hot cycling test of the sample at the test temperature to be qualified. 7 Test report 7.1 The test report shall include the following: a) the name of the manufacturer; b) product name, product batch number, model specifications; c) plastic lining material name and thickness; d) standard on which the test is based; e) testing machine model and heating temperature; f) thermometer range, indication error, steam pressure; g) heating and cooling processes description and curves; h) test result. 7.2 For the format of the test report, see Appendix A. ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.