HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (19 Jan 2025)

GB 18599-2020 PDF English


Search result: GB 18599-2020_English: PDF (GB18599-2020)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB 18599-2020English200 Add to Cart 0-9 seconds. Auto-delivery. Standard for pollution control on the non-hazardous industrial solid waste storage and landfill Valid
GB 18599-2001English70 Add to Cart 0-9 seconds. Auto-delivery. [Including 2013XG1] Standard for pollution control on the storage and disposal site for general industrial solid wastes Obsolete
BUY with any currencies (Euro, JPY, GBP, KRW etc.): GB 18599-2020     Related standards: GB 18599-2020

PDF Preview: GB 18599-2020


PDF Preview: GB 18599-2001


GB 18599-2020: PDF in English

GB 18599-2020 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS Replacing GB 18599-2001 Standard for Pollution Control on the Non-hazardous Industrial Solid Waste Storage and Landfill This electronic version is a release draft. Please refer to the official standard published by China Environment Publishing Group ISSUED ON: NOVEMBER 26, 2020 IMPLEMENTED ON: JULY 1, 2021 Issued by: Ministry of Ecology and Environment of the People’s Republic of China; State Administration for Market Regulation. Table of Contents Foreword ... 3 1 Scope ... 5 2 Normative References ... 5 3 Terms and Definitions ... 6 4 Requirements for Site Selection of Storage and Landfill Facilities ... 8 5 Technical Requirements for Storage and Landfill Facilities ... 9 6 Admission Requirements ... 11 7 Operation Requirements for Storage and Landfill Facilities ... 12 8 Pollution Control Requirements for Mining with Backfilling and Backfilling ... 13 9 Requirements for Closure and Land Reclamation ... 14 10 Requirements for Pollutant Monitoring ... 15 11 Implementation and Supervision ... 18 Appendix A (informative) Description of Single Composite Liner System ... 19 Standard for Pollution Control on the Non-hazardous Industrial Solid Waste Storage and Landfill 1 Scope This document specifies the environmental protection requirements for the site selection, construction, operation, closure, land reclamation and other processes of non-hazardous industrial solid waste storage and landfill facilities, the environmental protection requirements for the mining with backfilling and backfilling of non-hazardous industrial solid waste that replaces storage and landfill disposal, as well as monitoring requirements, implementation and supervision, etc. This Standard is applicable to the pollution control and environmental management of the site selection, construction, operation, closure and land reclamation of newly constructed, reconstructed and expanded non-hazardous industrial solid waste storage and landfills facilities, the pollution control and environmental management of the operation, closure and land reclamation of existing non-hazardous industrial solid waste storage and landfill facilities, as well as the pollution control and environmental management of the mining with backfilling and backfilling of non-hazardous industrial solid waste that replaces storage and landfill disposal. If special national environmental protection standards are issued for specific non-hazardous industrial solid waste storage and landfill, the special environmental protection standards shall be implemented during the storage and landfill processes. This Standard does not apply to the pollution control in the process of storing non-hazardous industrial solid waste in warehouses and packaging tools (cans, barrels and packaging bags, etc.). The storage process shall satisfy the corresponding environmental protection requirements, such as: seepage prevention, rain prevention and dust prevention, etc. 2 Normative References The following documents are indispensable to the application of this Standard. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document. GB 8978 Integrated Wastewater Discharge Standard GB 12348 Emission Standard for Industrial Enterprises Noise at Boundary GB 14554 Emission Standards for Odor Pollutants GB 15562.2 Graphical Signs for Environmental Protection Solid Waste Storage (disposal) Site 3.2 storage The activity of temporarily placing solid waste in a specific facility or location. 3.3 landfill The activity of placing solid waste in landfills that comply with the provisions and requirements on environmental protection. 3.4 non-hazardous industrial solid waste storage facility A land storage facility used for the temporary storage of non-hazardous industrial solid waste. The storage facility after closure shall be managed as a landfill. 3.5 non-hazardous industrial solid waste landfill A landfill facility used for the final disposal of non-hazardous industrial solid waste. 3.6 class I non-hazardous industrial solid waste Non-hazardous industrial solid waste with a concentration of any characteristic pollutant in the leachate obtained in accordance with the method specified in HJ 557 not exceeding the maximum allowable emission concentration in GB 8978 (the maximum allowable emission concentration of Class II pollutants shall implement Level-1 standard), and a pH value within the range of 6 ~ 9. 3.7 class II non-hazardous industrial solid waste Non-hazardous industrial solid waste with the concentration of one or more characteristic pollutants in the leachate obtained in accordance with the method specified in HJ 557 exceeding the maximum allowable emission concentration in GB 8978 (the maximum allowable emission concentration of Class II pollutants shall implement Level-1 standard), and a pH value beyond the range of 6 ~ 9. 3.8 class I non-hazardous industrial solid waste storage and landfill facility Non-hazardous industrial solid waste storage and landfill facility that can accept the various types of non-hazardous industrial solid waste specified in 6.1 of this Standard and comply with the relevant technical requirements for pollution control in this Standard. 3.9 class II non-hazardous industrial solid waste storage and landfill facility Non-hazardous industrial solid waste storage and landfill facility that can accept the various types of non-hazardous industrial solid waste specified in 6.2 and 6.3 of this Standard and comply with the relevant technical requirements for pollution control in this Standard. 3.10 mining with backfilling In order to satisfy the demands of mining technology, and for the purpose of supporting comply with the requirements of laws and regulations on environmental protection, and relevant statutory planning. 4.2 The distance between the storage and landfill facilities and the surrounding residential areas shall be determined based on the documents and approval opinions on environmental impact assessment. 4.3 The storage and landfill facilities shall not be located in ecological protection red line areas, permanent basic farmland concentration areas, and other areas that require special protection. 4.4 The storage and landfill facilities shall avoid active faults, cave areas, areas affected by natural landslides or debris flows, and wetlands, etc. 4.5 The storage and landfill facilities shall not be located in rivers, lakes, canals, channels, beaches and bank slopes below the highest water level of reservoirs, as well as within the submerged areas and protected areas of artificial water storage facilities, for example, reservoirs in national and local long-term planning. 4.6 The above provisions on site selection do not apply to the mining with backfilling and backfilling of non-hazardous industrial solid waste. 5 Technical Requirements for Storage and Landfill Facilities 5.1 General Provisions 5.1.1 In accordance with different technical requirements for pollution control on construction, operation and closure, etc., the storage and landfill facilities are classified into Class I and Class II facilities. 5.1.2 The flood control standards of the storage and landfill facilities shall be designed in accordance with the flood level with a recurrence interval of not less than 50 years, unless the national standards have proposed higher requirements. 5.1.3 Generally speaking, the storage and landfill facilities shall include the following units: a) Anti-seepage system, leachate collection and drainage system; b) Rainwater and sewage diversion system; c) Analytical testing and environmental monitoring system; d) Utilities and supporting facilities; e) Groundwater drainage system and wastewater treatment system (select settings based on specific circumstances). 5.1.4 The construction schemes for the storage and landfill facilities shall include construction quality assurance and construction quality control, clarify environmental protection clauses and responsibilities, and serve as the basis for environmental protection acceptance upon completion of the project. Meanwhile, they may also be used as the main content of construction environmental supervision. 5.1.5 After construction is completed, the storage and landfill facilities shall retain construction reports, a complete set of as-built drawings, and on-site and laboratory test reports for all materials. The storage and landfill facilities that adopt high-density polyethylene film as the artificial synthetic liner shall also submit artificial liner integrity testing reports. The above materials, together with the construction quality assurance document, serve as the basis for environmental protection acceptance of the completed project. 5.1.6 The anti-seepage requirements of leachate collection polls of the storage and landfill facilities shall be not lower than those of corresponding storage and landfill facilities. 5.1.7 In addition to the technical requirements for pollution control stipulated in this Standard, the storage facilities shall also comply with relevant administrative regulations, national and industry standards in their design, construction, operation and closure, etc. 5.1.8 For non-hazardous industrial solid waste with properties similar to domestic waste generated in activities that provide services for daily life, such as: food manufacturing, textile clothing and apparel industry, paper making and paper products industry, agricultural and sideline food processing industry, etc., as well as non-hazardous industrial solid waste (except coal gangue) with an organic matter content exceeding 5%, the direct storage and landfill disposal shall comply with the requirements of GB 16889. 5.2 Technical Requirements for Class I Non-hazardous Industrial Solid Waste Storage and Landfill Facilities 5.2.1 When the saturated permeability coefficient of the native foundation is not greater than 1.0  105 cm/s, and the thickness is not less than 0.75 m, the native foundation can be used as the anti-seepage liner. 5.2.2 When the native foundation cannot satisfy the anti-seepage requirements of 5.2.1, a modified compacted clay liner or other material anti-seepage liner with equivalent or above waterproof effectiveness can be used, and its anti-seepage properties shall be at least equivalent to those of a native foundation with a permeability coefficient of 1.0  105 cm/s and a thickness of 0.75 m. 5.3 Technical Requirements for Class II Non-hazardous Industrial Solid Waste Storage and Landfill Facilities 5.3.1 Class II non-hazardous industrial solid waste storage and landfill facilities shall adopt a single composite liner system as the anti-seepage liner and comply with the following technical requirements: a) Artificial synthetic materials shall adopt high-density polyethylene film, with a determination method in HJ 761; b) If the total amount of water-soluble salts is less than 5%, comply with the determination method in NY/T 1121.16. 6.3 Non-hazardous industrial solid waste specified in 5.1.8 can only be stored and landfilled in Class II non-hazardous industrial solid waste storage and landfill facilities after being treated and satisfying the requirements of 6.2. 6.4 Incompatible non-hazardous industrial solid waste shall set up different partitions for storage and landfill operations. 6.5 Hazardous waste and domestic garbage are not allowed to enter the non-hazardous industrial solid waste storage and landfill facilities, unless otherwise specified by relevant national and local laws, regulations and standards. 7 Operation Requirements for Storage and Landfill Facilities 7.1 Before the storage and landfill facilities are put into operation, enterprises shall formulate an emergency plan for environmental emergencies or formulate a special chapter of environmental emergency plan in the emergency plan to explain various possible environmental emergency scenarios and emergency response measures. 7.2 The storage and landfill facilities shall develop operation plans, and operation management personnel shall regularly participate in enterprise on-the-job training. 7.3 Enterprises operating the storage and landfill facilities shall establish a file management system, organize and archive it in accordance with national archives management and other laws and regulations, and permanently preserve it. The archival information mainly includes but is not limited to the following contents: a) Site selection, survey, land acquisition, design, construction, environmental assessment and acceptance information; b) Information, such as: the source, type, pollution characteristics, quantity, storage or landfill location of waste; c) Inspection and maintenance information of various pollution prevention and control facilities; d) The total amount of leachate and process water, as well as the process parameters of leachate and process water treatment equipment, and treatment effect records; e) Closure and post-closure management information; f) Environmental monitoring and emergency response information. 7.4 The graphical signs for the environmental protection of the storage and landfill facilities shall comply with the provisions of GB 15562.2 and shall be regularly inspected and maintained. 7.5 The storage and landfill facilities that may easily generate dust shall take effective dust suppression measures, such as: zoning operations, covering and water sprinkling, etc., to prevent dust pollution. Tailings ponds shall take measures, such as: uniform ore drawing and water sprinkling, etc. to prevent dust pollution from dry beaches. 7.6 Pollutant emission control requirements 7.6.1 Leachate generated by the storage and landfill facilities shall be collected and treated, and it can only be discharged after satisfying the requirements of GB 8978. If there are already industry, regional or local pollutant emission standards, the corresponding standards shall be implemented. 7.6.2 Fugitive gas emissions generated by the storage and landfill facilities shall comply with the relevant requirements for fugitive emission limits specified in GB 16297. 7.6.3 The environmental noise and odor pollutants emitted from the storage and landfill facilities shall comply with the provisions of GB 12348 and GB 14554. 8 Pollution Control Requirements for Mining with Backfilling and Backfilling 8.1 For Class I non-hazardous industrial solid waste, the mining with backfilling or backfilling operation can be performed in accordance with the following ways: a) For fly ash, mining with backfilling or backfilling can be performed in the goaf areas of coal mining areas; b) For goal gangue, mining with backfilling or backfilling can be performed in the goaf areas, such as: coal mining mines and pits, etc.; c) For tailings and mine waste rocks, etc., mining with backfilling or backfilling can be performed in the goaf areas, such as: mines and pits, etc. of the original mining areas. 8.2 For Class II non-hazardous industrial solid waste, as well as Class I non-hazardous industrial solid waste that does not comply with the mining with backfilling or backfilling ways in 8.1, before the mining with backfilling or backfilling activity, an environmental background survey shall be carried out. In addition, in accordance with the relevant standards, for example, HJ 25.3, an environmental risk assessment shall be carried out, with an emphasis on assessing the environmental pollution risks to groundwater, surface water and surrounding soil, so as to ensure that the environmental risks are acceptable. After the mining with backfilling or backfilling activity is completed, based on the risk assessment risks, long-term monitoring of potentially affected soil, surface water and groundwater shall be carried out, with a frequency 9.8 After closure, if the non-hazardous industrial solid waste needs to be mined and re-utilized, an environmental impact assessment shall be conducted. 9.9 After the closure of the storage and landfill facilities is completed, land reclamation can be carried out based on local topographic conditions, water resources, topsoil resources and other natural environmental conditions and social development demands, and in accordance with relevant provisions. The land reclamation implementation process shall satisfy the relevant land reclamation quality control requirements specified in TD/T 1036. If the land is used as construction land after reclamation, it shall also satisfy the requirements of GB 36600; if it is used as agricultural land, it shall also satisfy the requirements of GB 15618. 9.10 Once a historical storage facility of non-hazardous industrial solid waste has been assessed to ensure that the environmental risks are acceptable, closure or land reclamation operations can be carried out. 10 Requirements for Pollutant Monitoring 10.1 General Provisions 10.1.1 Enterprises shall establish enterprise monitoring systems, formulate monitoring schemes, carry out self-monitoring of pollutant discharge status and the impact on surrounding environmental quality in accordance with the provisions of relevant laws and Measures for Environmental Monitoring and Management and Measures for the Disclosure of Environmental Information of Enterprises and Institutions, etc., and make the monitoring results public. 10.1.2 The requirements for enterprises to install, operate and maintain automatic monitoring equipment for pollution sources shall be implemented in accordance with the provisions of relevant laws, regulations and standards. 10.1.3 Enterprises shall design, construct and maintain permanent sampling ports, sampling test platforms and sewage outlet signs in accordance with the requirements of environmental monitoring management regulations and technical specifications. 10.2 Requirements for Wastewater Pollutant Monitoring 10.2.1 The setting of sampling points and sampling method shall comply with the provisions of HJ 91.1. 10.2.2 The frequency of monitoring leachate and its discharged wastewater pollutants after treatment shall be determined in accordance with waste characteristics, covering layer and precipitation, etc., and at least once a month. The monitoring and analysis methods for wastewater pollutants shall comply with the provisions of GB 8978. 10.3 Requirements for Groundwater Monitoring 10.3.1 Before the storage and landfill facilities are put into use, enterprises shall monitor the background level of groundwater. 10.3.2 The layout of groundwater monitoring wells shall comply with the following requirements: a) One monitoring well shall be arranged upstream of the groundwater flow field, at least one monitoring well shall be arranged downstream, and at least one monitoring well shall be arranged in the area where pollution diffusion may occur. If a groundwater drainage system is installed, at least one monitoring well shall be arranged at the outlet of the groundwater main pipe to monitor the water quality of the groundwater drainage system; b) In karst development areas and storage and landfill facilities where the groundwater assessment level is determined to be Level 1 in the environmental impact assessment document, the density of downstream monitoring wells shall be increased based on the conclusions of the environmental impact assessment; c) When groundwater aquifers are deeply buried or groundwater monitoring wells are difficult to deploy in bedrock mountainous areas, and if the environmental impact assessment confirms that the groundwater will not be contaminated, the number of groundwater monitoring wells can be reduced; d) The location and depth of monitoring wells shall be arranged in accordance with the hydrogeological characteristics of the facilities; e) The construction and management of monitoring wells shall comply with the technical requirements of HJ/T 164; f) If they satisfy the above-mentioned requirements, the existing groundwater intake wells, observation wells and survey wells can be used as groundwater monitoring wells. 10.3.3 The frequency of groundwater monitoring in storage and landfill facilities shall comply with the following requirements: a) During operation, the frequency of self-monitoring by enterprises shall be at least once per quarter, and the interval between each two monitoring times shall be no less than 1 month, unless otherwise specified by the State; if there are environmentally sensitive areas in the surrounding area, the frequency of monitoring shall be increased. The specific monitoring points and frequency shall be determined based on the conclusions of the environmental impact assessment. When signs of pollution in groundwater are found, the cause shall be promptly found, and remedial measures shall be taken to prevent further spread of pollution; b) After closure, the groundwater monitoring system shall continue to normally operate, with a frequency of monitoring at least once every six months, until the groundwater quality does not exceed the groundwater background level for 2 consecutive years. ......
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.