CCAP-C11-09-2014 PDF English
Search result: CCAP-C11-09-2014_English: PDF
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Name of Chinese Standard | Status |
CCAP-C11-09-2014 | English | 400 |
Add to Cart
|
0-9 seconds. Auto-delivery.
|
China Compulsory Certification Implementation Detailed-Rules - vehicle interior parts
| |
BUY with any currencies (Euro, JPY, GBP, KRW etc.): CCAP-C11-09-2014 Related standards: CCAP-C11-09-2014
PDF Preview: CCAP-C11-09-2014
CCAP-C11-09-2014: PDF in English File No..CCAP-C11-09.2014
Document Name. Detailed Implementation Rules for China Compulsory Certification - Interior Trim Parts of Motor
Vehicle (Edition 1) (Revision Code. 0)
Serial No.. CCAP-C11-09.2014
Detailed Implementation Rules for
China Compulsory Certification
Interior Trim Parts of Motor Vehicle
ISSUED ON. DECEMBER 31, 2014
IMPLEMENTED ON. JANUARY 1, 2015
China Certification Centre for Automotive Products
Document Name. Detailed Implementation Rules for China Compulsory Certification - Interior Trim Parts of Motor
Vehicle (Edition 1) (Revision Code. 0)
Table of Contents
0 Introduction ... 5
0.1 Terms and Definitions ... 5
0.2 Manufacturing Enterprises Classification Management Requirements ... 5
0.3 Requirements on Utilizing the Manufacturing Enterprise Test Resources ... 8
1 Application Scope ... 9
2 Certification Basis and Standards ... 9
3 Certification Mode Selection and Relevant Requirements ... 9
3.1 Basic Certification Modes for Interior Trim Parts of Motor Vehicles ... 9
3.2 Applicability of Certification Mode ... 10
4 Classification of Certification Unit ... 10
5 Certification Entrusting ... 11
5.1 Certification Process ... 11
5.2 Certification Entrusting Materials ... 11
5.3 Certification Plan and Certification Contract ... 12
6 Certification Implementation ... 13
6.1 Type Test ... 13
6.2 Initial Factory Inspection ... 15
6.3 Certification Evaluation and Approval ... 18
6.4 Time-limit of the Certification ... 18
6.5 Maintenance Parts of Vehicle-Models Out of Production ... 18
7 After-Certification Supervision ... 19
7.1 After-certification Follow-up Inspection ... 19
7.2 Production On-site Sampling Test or Inspection ... 20
7.3 Market Sampling Test or Inspection ... 21
7.4 Frequency and Time of After-Certification Supervision ... 21
7.5 Record of After-Certification Supervision ... 21
7.6 Evaluation of After-Certification Supervision Result ... 22
8 Certificate ... 22
8.1 Maintenance of the Certificate ... 22
8.2 Content of the Certificate ... 22
8.3 Change of the Certificate ... 22
8.4 Cancellation, Suspension and withdrawal of Certificate ... 23
8.5 Use of the Certificate ... 23
9 Certification Marks ... 23
9.1 Mark Style Permitted to Use ... 24
9.2 Use Requirements ... 24
10 Charges ... 24
11 Certification Responsibilities ... 24
12 Process and Time-limit Requirements related to Technical Disputes, Complaints and
Appeal ... 25
Attachment 1 Description of Interior Trim Parts of Motor Vehicles ... 26
Attachment 2 List of Critical components/Materials of Interior Trim Parts of Motor Vehicles
... 28
Attachment 3 Standard and Inspection Items for Type Test ... 29
Document Name. Detailed Implementation Rules for China Compulsory Certification - Interior Trim Parts of Motor
Vehicle (Edition 1) (Revision Code. 0)
Attachment 4 Compilation Requirements of Production Conformity Control Plan and
Implementation Report ... 30
Annex 1 Recommended Format of the Production Conformity Control Plan ... 34
Document Name. Detailed Implementation Rules for China Compulsory Certification - Interior Trim Parts of Motor
Vehicle (Edition 1) (Revision Code. 0)
0 Introduction
In order to ensure the standardization and effectiveness of compulsory
certification, this is formulated according to “Compulsory Product Certification
Implementation Rules - Interior Trim Parts for Motor Vehicle” (CNCA-C11-
09.2014) (hereinafter refers to as the Implementation Rules) and CNCA
Compulsory Product General Implementation Rules, including “Compulsory
Product Certification Implementation Rules - Manufacturing Enterprise
Classification Management, Certification Mode Selection and Determination”
(CNCA-00C-003), “Compulsory Product Certification Implementation Rules –
Utilization of Manufacturing Enterprise Test Resources and Other Certification
Results” (CNCA-00C-004), “Compulsory Product Certification Implementation
Rules – Factory Quality Assurance Capability Requirements” (CNCA-00C-005),
and “Compulsory Product Certification Implementation Rules - Factory
Inspection General Requirements” (CNCA-00C-006) and quality manuals,
procedure documents and operation instructions of China Certification Centre
for Automotive Products (CCAP). It is used to support the “Implementation
Rules” as a supportive document.
Application scope and certification basis of this Detailed Rules are consistent
with the provisions of “Implementation Rules”, and it changes along the CCC
product catalogs and the announcements on adjustment and definition of the
product certification scope released by CNCA. It will be adjusted and
implemented synchronously with the “Implementation Rules”.
0.1 Terms and Definitions
0.1.1 Testing at Manufacturer’s Premises (abbreviated as TMP mode)
It means that the engineers of designated laboratory use the testing equipment
in the factory laboratory to conduct testing. The factory shall dispatch test
personnel to provide assistance. The designated laboratory will examine,
approve and issue the test report.
0.1.2 Witnessed Manufacturer’s Testing (abbreviated as WMT mode)
It means that the engineer of designated laboratory witnesses the factory
laboratory’s test conditions and all tests completed by using the laboratory’s
equipment or according to the test plan submitted; or witnesses part of the test
conditions and the test items. Test personnel of the factory laboratory shall
provide the original records and draft up the test report together with the
engineer of designated laboratory according to relevant provisions. The
designated laboratory shall audit, approve and issue the test report.
0.2 Manufacturing Enterprises Classification Management Requirements
CCAP conducts risk assessment and classification to the certification
Document Name. Detailed Implementation Rules for China Compulsory Certification - Interior Trim Parts of Motor
Vehicle (Edition 1) (Revision Code. 0)
inspection.
CCAP shall make dynamic management to the manufacturing enterprises; and
re-assess the classification result and make classification adjustment regularly
based on the various information collected, according to provisions on
manufacturing enterprise classification management. When the certification
enterprise has major problem affecting the risk assessment result, CCAP shall
put the enterprise to the high risk class directly based on the assessment result.
Otherwise, if there is evidence showing that the risk elements have been
effectively controlled and the enterprise has no bad record in two years, CCAP
will adjust risk class of the enterprise to low risk classes gradually, by following
the order of D→C→B→A according to the risk assessment situation.
0.3 Requirements on Utilizing the Manufacturing Enterprise Test
Resources
0.3.1 Scope
It applies to after-certification supervision sampling inspection AND
supplementary differentiation test after change of the certificate.
0.3.2 Implementation
If the manufacturing enterprise has the inspection equipment and capabilities
that meet the requirements of “Compulsory Product Certification
Implementation Rules — Utilization of Manufacturing Enterprise Test
Resources and Other Certification Results” and certification standards, the
certification client, the manufacturer or the manufacturing enterprise can apply
for utilizing the manufacturing enterprise’s test resources (hereinafter referred
to as the factory lab) to the certification body; and then conduct self-check. After
providing the self-check result and relevant data to the certification body,
together with the application for review, If the factory lab is up to the standard
of CCAP (organizing designated lab to participate), then the test resources of
the manufacturing enterprise can be used to conduct production on-site TMP
test (or WMT test).
In order to lighten the burden of the enterprise, in principle, CCAP will not
organize to audit the factory lob independently. Application for audit of the
factory lab and on-site testing application can be submitted together or
separately by the certification client. CCAP will organize technical experts of
the designated labs to conduct on-site verification and keep relevant verification
evaluation record. After the capacities of the factory lab passes the inspection
team’s audit, the factory lab can be used to conduct testing.
0.3.3 Maintenance of qualification
In principle, besides annual supervision inspection, CCAP will conduct regular
Document Name. Detailed Implementation Rules for China Compulsory Certification - Interior Trim Parts of Motor
Vehicle (Edition 1) (Revision Code. 0)
a. Quality manual, including organization chart and/or responsibility
provisions;
b. Quality assurance capability control files directory. It shall conform with
the relevant requirements specified in Appendix 1 of Attachment 2 of
the “Implementation Rules”;
c. Copy of the quality management system certificate (if any).
(5) Product description of the interior trim part of motor vehicle shall comply
with the requirements of Attachment 1 of the “Implementation Rules”.
When declaring, fill in according to the format specified in Attachment 1
of this “Detailed Rules”;
(6) Critical components and raw materials list. The critical components
(materials) list shall include names, models, specifications and suppliers
(manufacturers) of the critical components (materials). See Attachment
2 of this Detailed-Rules;
(7) Production conformity control plan (when it is the first-time application
and when the production conformity control plan changes). Compilation
requirements are shown in Attachment 4;
(8) If entrusting other enterprises to produce the products, the certification
client shall provide copies of relevant contracts signed between the
entrusting enterprise and the commissioned enterprise to CCAP, such
as copies of ODM/OEM agreement signed by the certification client, the
producer (manufacturer) and manufacturing enterprise; power of
attorney; and ODM original CCC certificate (if applicable).
5.3 Certification Plan and Certification Contract
CCAP shall review the application materials. If the application materials need
to be supplemented or improved, it will communicate with the client and require
to supplement and submit relevant materials. After the review completes, CCAP
will issue a notice of acceptance or not-acceptance to the client.
After accepting the application, CCAP will formulate a certification plan
according to the audit result, which includes.
(1) The certification mode adopted and unit division;
(2) Type test plan (including the selection and confirmation of the designated
laboratory);
(3) Factory inspection plan and time (man-day);
(4) Estimated certification fees;
Document Name. Detailed Implementation Rules for China Compulsory Certification - Interior Trim Parts of Motor
Vehicle (Edition 1) (Revision Code. 0)
It shall be consistent with the critical components/raw materials in “Production
Conformity control plan” submitted by the enterprise. The list shall at least
include name, model, specification and supplier of the critical components
(material). See Attachment 2 of this Detailed-Rules for details.
6.1.3 Type test inspection items and inspection basis
Type test inspection items and inspection basis are shown in Attachment 3 of
this Detailed Rules, in which.
(1) The combustion speed of interior trim parts of passenger cars shall be
less than or equal to 70 mm/min;
(2) The sound insulation and insulated interior trim parts used in the engine
compartment of buses as well as road passenger cars and tourist buses
of which the engine is located in the rear, shall meet the requirements of
sub-clause 4.6.1 of GB 8410-2006.
Note. The definition of each model refers to the requirements of Clause 3 of GB
7258-2012.
6.1.4 Selection and confirmation of the designated lab
The certification client can select a lab among the designated inspection labs
provided by CNCA for the certification products. According to the client’s
confirmation, CCAP will give inspection commission to the selected lab to
conduct type test.
6.1.5 Implementation of type test
6.1.5.1 Type test shall be completed by CNCA designated lab entrusted by
CCAP. The designated lab shall complete the sample testing within the
stipulated time according to CCC requirements and relevant stipulations of
CCAP. The lab shall make a complete record of the whole test process and put
it on file in order to ensure traceability of the inspection process and result.
6.1.5.2 If there is unqualified item, the lab shall inform the situation to CCAP. If
the client wants to continue applying for certification, it shall complete
rectification within 3 months and submit the rectification material to CCAP.
CCAP will reconfirm the test plan. In principle, samples that are same-
specification as previous samples shall be selected to conduct all-items test. If
it passes the re-test, type test is PASS. Otherwise, it is NOT-PASS; and
certification is terminated. If rectification is not completed within the required
time and/or samples are not provided for retest, this certification will be
terminated. The certification client can also apply for cancelling the certification
entrusting; after the rectification is completed, it can re-apply for certification
entrusting and conduct type test.
Document Name. Detailed Implementation Rules for China Compulsory Certification - Interior Trim Parts of Motor
Vehicle (Edition 1) (Revision Code. 0)
inspection.
7.1.2 Content of After-Certification Follow-up Inspection
(1) Production conformity control plan implementation report that is
completed by the manufacturer or the manufacturing enterprise;
(2) Implementation situation of the production conformity control plan of the
manufacturing enterprise;
(3) Production conformity inspection and on-site designated test;
(4) Use situation of the certification mark and the certificate;
(5) Other CCAP’s requirements on factory on-site inspection.
7.2 Production On-site Sampling Test or Inspection
7.2.1 Principles of Production On-site Sampling Test or Inspection
If production on-site sampling inspection or test method is adopted for after-
certification supervision, then the certification client, manufacturer and
manufacturing enterprise shall cooperate.
7.2.2 Content of Production On-site Sampling Test or Inspection
In principle, different unit/models of products shall be drawn as samples for
each time of supervision.
CCAP formulate the sampling inspection plan according to the enterprise
classification principles and features of the products. For the inspection items,
all or several of the type test inspection items shall be inspected.
The personnel appointed by CCAP will draw samples from qualified products
produced by the enterprise (including the production lines, warehouses or sea-
ports/airport) according to the sampling inspection plan. After sampling, CCAP
will seal up the samples. The enterprise shall send the samples to the
designated test lab within 10 working days. The enterprise shall also fill out the
sample description form when sending the samples and truthfully describe
critical components and materials (including the suppliers) used in the samples.
CCAP and/or the lab will inspect the conformity of the samples. If they find that
the samples are inconsistent with the certification-products, in principle, test will
not be continued. The inspection conclusion will be that. the samples are not
consistent with the certification-products; the test is stopped.
7.2.3 Utilization of Self-Test Resources of Enterprise
If the manufacturing enterprise has the test conditions stipulated in
“Compulsory Product Certification Implementation Rules — Utilization of
Document Name. Detailed Implementation Rules for China Compulsory Certification - Interior Trim Parts of Motor
Vehicle (Edition 1) (Revision Code. 0)
for relevant range of products from the expiry date of the stipulated time-limit.
If the enterprise does not submit the “certificate recovery application” within the
suspension time-limit OR the rectification measures are not taken OR the
rectification is not qualified, then CCAP will withdraw the certificate or shrink the
relevant certification range.
8.3.2 Certification change of certification enterprise
After the enterprise is certified, if there is change that may affect the certification
(hereinafter referred to as certification change), including. change of certificate
information (including that batch products are changed into maintenance parts);
or technical change of the certification-products (design, structure parameters,
critical components/raw materials, suppliers, etc.) that may affect conformity of
relevant standards; or change of the factory production conformity control plan
and the production conditions that may affect the production conformity, then
the certification client shall declare and submit the change application to CCAP
before the products involved in change are delivered, sold or imported. After
acquiring CCAP’s approval, certification change can be implemented. If the
change affects the product’s conformity, CCAP will arrange necessary type test
and/or factory inspection according to the change situation when necessary.
After confirming that the changed products meet the certification requirements,
change will be approved and the certificate will be renewed. Serial number and
validity time-limit of the new certificate will remain unchanged. Moreover, the
change approval date shall be marked. If it is not necessary to renew the
certificate, the change confirmation form shall be issued, and the changed
content and the change approval date shall be marked. Certification change
shall be conducted according to CCAP “Certification Enterprise Certification
Change Management Requirements”.
8.4 Cancellation, Suspension and withdrawal of Certificate
Certificate’s cancellation, suspension and withdrawal shall be implemented in
accordance with the “Compulsory product certification management method”,
“Compulsory product certificate cancellation, suspension and withdrawal
implementation rules”, and relevant provisions of CCAP. CCAP shall adopt
appropriate way to publicly announce the certificate of cancellation, suspension
and withdrawal.
8.5 Use of the Certificate
Use of the certificate shall comply with the requirements of “Compulsory
product certification management method”.
9 Certification Marks
The management and use of certification marks shall comply with the
provisions of “Compulsory product certification management method”.
Document Name. Detailed Implementation Rules for China Compulsory Certification - Interior Trim Parts of Motor
Vehicle (Edition 1) (Revision Code. 0)
conformity control plan schedule (critical components and materials) are shown
in Attachment 2 of Detailed-Rules (CCAP-C11-09); for the content and
requirements of production conformity control plan schedule (critical
manufacturing /assembling /inspection process), the certification client shall
identify according to features of the products and the production process, and
shall determine the control requirements of technical parameters and product
features.
If the enterprise already has a control plan, and its content can cover all
requirements of the production conformity control plan, the existing control plan
can be used and submitted to CCAP. After it is reviewed by CCAP, it can be
used.
II. Compilation of the Production Conformity Control Plan Implementation
Report [Translator note. Clause “I” is not existed]
The production conformity control plan implementation report is a documentary
statement of implementation situation of the production conformity control plan
each year. It shall be submitted to CCAP’s on-site inspection team during the
factory on-site follow-up inspection. Content of the report shall include the
following.
1. Overview of basic situation of the factory of the year.
1.1 Basic information of the factory. includes the manufacturer; name and
address of the manufacturing factory; whether the main production equipment
and the inspection instruments have changed. If there is any change, it shall be
explained in detail;
1.2 Change of the product certificate of the year (including the valid certificate;
expanded items and change of the year; certificate’s suspension, cancellation
and withdrawal). It can be explained by list;
1.3 Use situation of CCC mark of the year.
2. Implementation situation of the production conformity control plan.
2.1 Explain COP plan fulfilment situation, item-by-item and comparing to the
plan. The after-certification supervision sampling test result can be used as
COP plan test result. If it is not completed as scheduled, the reason shall be
explained in detail;
2.2 Implementation situation of the critical components / materials conformity
control plan.
(1) Change situation of specification, model and material of critical
components/materials;
...... Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.
|