| CART (Up to 12 items/PDFs). How to add more items? Search 'GB/T 1.1' --> Add to Cart | | Delete | 1 | DL/T 1091-2018_ENGLISH | Code of furnace safeguard supervisory system for thermal power plant | 1 | 5 | 629 | | Need to translate | | Delete | 2 | DL/T 1858-2018_ENGLISH | Specification of auto-flushing water filter for hydropower plant | 1 | 3 | 209 | | Need to translate | | Delete | 3 | DL/T 1035.5-2018_ENGLISH | (Guides for inspection of circulating fluidized bed boilers - Part 5: Refractory) | 1 | 3 | 229 | | Need to translate | | Delete | 4 | DL/T 1859-2018_ENGLISH | Specification of rotation speed monitoring devices for hydropower plant | 1 | 3 | 229 | | Need to translate | | Delete | 5 | DL/T 1120-2018_ENGLISH | (Hydraulic turbine control system test and real-time simulation device technical specification) | 1 | 4 | 399 | | Need to translate | | Delete | 6 | DL/T 1903-2018_ENGLISH | (Hydropower and hydraulic engineering warehousing operation management procedures) | 1 | 4 | 399 | | Need to translate | | Delete | 7 | DL/T 1902-2018_ENGLISH | Installation, operation and maintenance specification of a. c. and d. c. composite hollow insulators with high voltage | 1 | 3 | 209 | | Need to translate | | Delete | 8 | DL/T 5549-2018_ENGLISH | Guidelines for technical and economic indices of transmission project(overhead line) | 1 | 5 | 669 | | Need to translate | | Delete | 9 | DL/T 1035.6-2018_ENGLISH | (Guide for inspection of circulating fluidized bed boilers - Part 6: Maintenance of limestone conveying systems and SNCR denitration systems) | 1 | 3 | 279 | | Need to translate | | More PDF Samples Total (USD) | 3251.00 |
Procedure: How to deliver PDF
Tax Invoice/Quotation Specimen
Click for Video Demo -- Buy with any credit cards, PayPal etc.
Click for Video Demo -- Get a quotation in 9 seconds (Online self-service)
|