Std ID |
Description (Standard Title) |
Detail |
TB/T 1462-1983
|
(Diesel locomotives governor general technical conditions)
|
TB/T 1462-1983
|
TB/T 1462-2010
|
Technical specifications of speed-governing system of diesel engine for locomotive
|
TB/T 1462-2010
|
TB/T 1463-1991
|
Technical specifications of speed-governing system of diesel engine for locomotive
|
TB/T 1463-1991
|
TB/T 1463-2006
|
Technical specification for wheelsets assembly of railway locomotive
|
TB/T 1463-2006
|
TB 10001-2005
|
Code for design on subgrade of railway
|
TB 10001-2005
|
TB/T 1464-1991
|
General Specification of Carbon Steel Castings for Railway Rolling Stock
|
TB/T 1464-1991
|
TB/T 1465-1993
|
General technical conditions of nodular iron castings used for rolling stock
|
TB/T 1465-1993
|
TB/T 1465-2015
|
General specification of spheroidal graphite castings for rolling stock
|
TB/T 1465-2015
|
TB/T 1466-1991
|
General Technical Specification for Grey Iron Castings of Rolling Stock
|
TB/T 1466-1991
|
TB/T 1469-1993
|
(Diesel common metallic materials)
|
TB/T 1469-1993
|
TB/T 1470-1993
|
(Diesel common fasteners)
|
TB/T 1470-1993
|
TB/T 1472-1983
|
(Integrated sheath, aluminum sheath signal cable. Technical conditions)
|
TB/T 1472-1983
|
TB/T 1475-1993
|
General Technical Specifications for Copper Alloy Castings for Rolling Stock
|
TB/T 1475-1993
|
TB/T 1476-1983
|
(Railway signal boxes, racks, cabinets shape basic dimensions series)
|
TB/T 1476-1983
|
TB/T 1477-1998
|
(ZD6 series electric switch machine)
|
TB/T 1477-1998
|
TB/T 1477-2005
|
ZD6 series electric switch machines
|
TB/T 1477-2005
|
TB/T 1478-1983
|
(Railway telecommunication cables standard series and the main technical conditions)
|
TB/T 1478-1983
|
TB/T 1479-1991
|
Axle End Bolts for Rolling Stocks
|
TB/T 1479-1991
|
TB/T 1480-1983
|
(Rolling vehicles with anti-loose piece)
|
TB/T 1480-1983
|
TB/T 1481-1983
|
Rolling Bearings Pressure Plate
|
TB/T 1481-1983
|
TB/T 1484.1-2001
|
Railway rolling stock cables ordering technology - Part 1: 3kV and below rated voltage cables
|
TB/T 1484.1-2001
|
TB 10001-2016
|
Code for design of railway earth structure
|
TB 10001-2016
|
TB/T 1484.2-2001
|
Railway rolling stock cables ordering technology - Part 2: Rated voltage 30kV power cable
|
TB/T 1484.2-2001
|
TB 10002.1-1999
|
Fundamental code for design on railway bridge and culvert
|
TB 10002.1-1999
|
TB/T 1484.3-2001
|
Railway rolling stock cables ordering technology - Part 3: The communication network cable
|
TB/T 1484.3-2001
|
TB/T 1484.3-2010
|
Specification for cables on board rolling stock. Part 3: 30 kV single phase power cables
|
TB/T 1484.3-2010
|
TB 10002.1-2005
|
Fundamental code for design on railway bridge and culvert
|
TB 10002.1-2005
|
TB/T 1484-1983
|
(Insulated cables for railway vehicles ordering technology)
|
TB/T 1484-1983
|
TB/T 1486-1999
|
(No. 13 Couplers joists with coupler)
|
TB/T 1486-1999
|
TB/T 1488-1983
|
(Railway locomotive axle arrangement type representation)
|
TB/T 1488-1983
|
TB/T 1489-1983
|
(Rail combination frog surfacing technical conditions)
|
TB/T 1489-1983
|
TB/T 1490-1983
|
(Bogie general technical conditions)
|
TB/T 1490-1983
|
TB/T 1490-2004
|
General technical specification for the bogies of railway passenger coach
|
TB/T 1490-2004
|
TB/T 1491-1983
|
(Locomotives oil damper general technical conditions)
|
TB/T 1491-1983
|
TB/T 1491-2004
|
Technical specification for oil damper of locomotive and rolling stock
|
TB/T 1491-2004
|
TB/T 1491-2015
|
Technical specification for oil damper of locomotive and rolling stock
|
TB/T 1491-2015
|
TB/T 1492-1983
|
(Railway vans bicycle brake test methods)
|
TB/T 1492-1983
|
TB/T 1492-2002
|
The method of single car for railway passenger car and wagon brake
|
TB/T 1492-2002
|
TB/T 1495.1-1984
|
(Chinese Industry Standard)
|
TB/T 1495.1-1984
|
TB/T 1495.1-1992
|
Elastic Strips - Type Fasteners - Assembling and Configuration
|
TB/T 1495.1-1992
|
TB/T 1495.2-1984
|
(Chinese Industry Standard)
|
TB/T 1495.2-1984
|
TB/T 1495.2-1992
|
I-shaped Elastic Strip Fastenings - Elastic Strip
|
TB/T 1495.2-1992
|
TB/T 1495.3-1984
|
(Chinese Industry Standard)
|
TB/T 1495.3-1984
|
TB/T 1495.3-1992
|
I-shaped Elastic Strip Fastenings - Gauge Apron
|
TB/T 1495.3-1992
|
TB/T 1495.4-1984
|
(Chinese Industry Standard)
|
TB/T 1495.4-1984
|
TB/T 1495.4-1992
|
[Including 2018XG1] I-shaped Elastic Strip Fastenings - Flat Washer
|
TB/T 1495.4-1992
|
TB/T 1495.5-1984
|
(Chinese Industry Standard)
|
TB/T 1495.5-1984
|
TB/T 1495.5-1992
|
(Spring I type fastener. Flapper seat)
|
TB/T 1495.5-1992
|
TB/T 1495.5-2003
|
Spring clip-I fastenings. Part 5: Track insulators for spring clip-I, II fastenings
|
TB/T 1495.5-2003
|
TB/T 1497-1984
|
(Rail insulation technical conditions)
|
TB/T 1497-1984
|
TB/T 1498-1984
|
(Railway Signal and Communication Package Technical Conditions)
|
TB/T 1498-1984
|
TB/T 1500.1-2009
|
Operation of receiving departing trains. Part 1: On double lines with auto-blocking and centralized interlocking (with signalman)
|
TB/T 1500.1-2009
|
TB/T 1500.2-2009
|
Operation of receiving and departing trains. Part 2: On double lines with auto-blocking and centralized interlocking(without signalman)
|
TB/T 1500.2-2009
|
TB/T 1500.3-2009
|
Operation of receiving and departing trains. Part 3: On single and double lines with semi-auto-blocking and centralized interlocking(with signalman)
|
TB/T 1500.3-2009
|
TB/T 1500.4-2009
|
Operation of receiving and departing trains. Part 4: On single and double Lines with semi-auto-blocking and centralized interlocking(without signalman)
|
TB/T 1500.4-2009
|
TB/T 1500.5-2009
|
Operation of receiving and departing trains. Part 5: On signle and double lines with semi-auto-blocking and colorlight electric interlocking
|
TB/T 1500.5-2009
|
TB/T 1500.6-2009
|
Operation of receiving and departing trains. Part 6: On single and double lines with telephone block and without interlocking
|
TB/T 1500.6-2009
|
TB/T 1500.7-2009
|
Operation of receiving and departing trains. Part 7: On signle-lines auto-blocking and centralized interlocking between stations(with signalman)
|
TB/T 1500.7-2009
|
TB/T 1500.8-2009
|
Operation of receiving and departing trains. Part 8: On signle-lines auto-blocking and centralized interlocking between stations(without signalman)
|
TB/T 1500.8-2009
|
TB/T 1500-1992
|
(Double automatic blocking electrical interlocking (set signalman) receiving trains operating standards)
|
TB/T 1500-1992
|
TB/T 1500-2003
|
Standards of operation of receiving and departing trains on double lines with auto-blocking and centralized interlocking (with signalman)
|
TB/T 1500-2003
|
TB/T 1501-1992
|
(Double automatic blocking electrical interlocking (no signalman) receiving trains operating standards)
|
TB/T 1501-1992
|
TB/T 1501-2003
|
Standards of operation of receiving and departing trains on double lines with auto-blocking and centralized interlocking (without signalman)
|
TB/T 1501-2003
|
TB/T 1502-1992
|
(Single-lane semi-occlusive electrical interlocking (set signalman) receiving trains operating standards)
|
TB/T 1502-1992
|
TB/T 1502-2003
|
Standards of operation of receiving and departing trains on single and double lines with semi-auto-blocking and centralized interlocking (with signalman)
|
TB/T 1502-2003
|
TB/T 1503-1992
|
(Single-lane semi-occlusive electrical interlocking (no signalman) receiving trains operating standards)
|
TB/T 1503-1992
|
TB/T 1503-2003
|
Standards of operation of receiving and departing trains on single and double lines with semi-auto-blocking and centralized interlocking (without signalman)
|
TB/T 1503-2003
|
TB/T 1504-1992
|
(Single-lane semi-occlusive interlocking color light electric locks hair trains operating standards)
|
TB/T 1504-1992
|
TB/T 1504-2003
|
Standards of operation of receiving and departing trains on single and double lines with semi-auto-blocking and colorlight electric interlocking
|
TB/T 1504-2003
|
TB/T 1505-1992
|
(Single-lane semi-automatic blocking arm lock interlocking board trains operating standards hair)
|
TB/T 1505-1992
|
TB/T 1506-1992
|
(Single-line phone occlusion without interlock receiving trains operating standards)
|
TB/T 1506-1992
|
TB/T 1506-2003
|
Standards of operation of receiving and departing trains on single and double lines with telephone block and without interlocking
|
TB/T 1506-2003
|
TB/T 1507-1993
|
Routing Rules for Locomotive Electrical Equipment
|
TB/T 1507-1993
|
TB/T 1508-1993
|
(Locomotive electrical cubicle technical conditions)
|
TB/T 1508-1993
|
TB/T 1508-2005
|
Technical Specification for Locomotive Electrical Cubicle
|
TB/T 1508-2005
|
TB/T 1508-2010
|
Technical specification for locomotive electrical cubicles
|
TB/T 1508-2010
|
TB/T 1508-2016
|
Electrical cubicle for locomotive
|
TB/T 1508-2016
|
TB/T 1510-1993
|
(Locomotive relay technical conditions)
|
TB/T 1510-1993
|
TB/T 1511-1993
|
(Locomotive pressure relay technical conditions)
|
TB/T 1511-1993
|
TB/T 1512-1984
|
(Road-ho)
|
TB/T 1512-1984
|
TB/T 1513-1984
|
(Ballast fork)
|
TB/T 1513-1984
|
TB/T 1514-1984
|
(Ballast rake)
|
TB/T 1514-1984
|
TB/T 1515-1984
|
(Road hammer)
|
TB/T 1515-1984
|
TB/T 1516-1984
|
(Rake ho)
|
TB/T 1516-1984
|
TB/T 1517-1984
|
(Crowbar)
|
TB/T 1517-1984
|
TB/T 1520-1984
|
(Locomotive Equipment Vehicle Equipment legend graphical symbols)
|
TB/T 1520-1984
|
TB/T 1527-1995
|
(Railway Steel protective coating)
|
TB/T 1527-1995
|
TB/T 1527-2004
|
The protection coating of railway steel bridges again corrosion
|
TB/T 1527-2004
|
TB/T 1527-2011
|
The protection coating anti-corrosion and specification for the supply of paints for railway steel bridge
|
TB/T 1527-2011
|
TB/T 1528.1-2002
|
Railway signal power supply panel. Part 1: General rules
|
TB/T 1528.1-2002
|
TB/T 1528.2-2005
|
Railway signal power supply panel. Part 2: Test methods
|
TB/T 1528.2-2005
|
TB/T 1528.3-2002
|
Railway signal power supply panel. Part 3: All-interlocking signal power supply panel
|
TB/T 1528.3-2002
|
TB/T 1528.4-2002
|
Railway signal power supply panel. Part 4: Computer-interlocking signal power supply panel
|
TB/T 1528.4-2002
|
TB/T 1528.5-2005
|
Railway signal power supply panel. Part 5: Hump signal power supply panel
|
TB/T 1528.5-2005
|
TB/T 1528.6-2002
|
Railway signal power supply panel. Part 6: Block section power supply panel
|
TB/T 1528.6-2002
|
TB/T 1528.7-2002
|
Railway signal power supply panel. Part 7: 25Hz signal power supply panel
|
TB/T 1528.7-2002
|
TB/T 1528-1994
|
(Railway Signal Power Screen general technical conditions)
|
TB/T 1528-1994
|
TB/T 1534-1984
|
(Bus square lighting technical conditions)
|
TB/T 1534-1984
|
TB/T 1536-1996
|
(Rail vehicle with windows rolled billet technical conditions only)
|
TB/T 1536-1996
|
TB/T 1537-1997
|
Evaluation Method for Heat Insulation Test of Refrigerator Wagon
|
TB/T 1537-1997
|