|
Std ID |
Description (Standard Title) |
|
SY/T 6227-2005
|
Petroleum industry database design specifications
|
|
SY/T 6228-1996
|
Recommended Practices for Occupational Safety Oil and Gas Well Drilling and Servicing Operations
|
|
SY/T 6228-2010
|
Recommend practice for occupational safety for oil and gas well drilling and servicing operations
|
|
SY/T 6229-1996
|
Training for initial fire attack
|
|
SY/T 6229-2007
|
Standard on training for initial emergency scene operations(NFPA 1410: 2000, IDT)
|
|
SY/T 6229-2014
|
Standard on training for initial emergency scene operations
|
|
SY/T 6230-1997
|
Petroleum and natural gas processing. Management of process hazards
|
|
SY/T 6231-1996
|
(Electronic downhole pressure gauge)
|
|
SY/T 6231-2006
|
Electronic downhole pressure gauge
|
|
SY/T 6232-1996
|
(Petroleum core analysis experimental equipment classification)
|
|
SY/T 6233-1996
|
(Trial operation of natural gas pipeline specifications)
|
|
SY/T 6233-2002
|
Commissioning and start - up code for gas transmission pipeline
|
|
SY/T 6234-1996
|
(Buried Pipeline overall heat transfer coefficient of determination of the heat balance method)
|
|
SY/T 6234-2003
|
Determination of gross heat transfer factor for the buried pipeline
|
|
SY/T 6234-2010
|
Determination of gross heat transfer factor for the buried pipeline
|
|
SY/T 6235-1996
|
General Technical Conditions of Surface Instruments for Digital Control Well Logging
|
|
SY/T 6236-1996
|
Code of information for reservoir engineering
|
|
SY/T 6236-2012
|
The specification for names of data for oil reservoir engineering
|
|
SY/T 6237-1996
|
(Downhole equipment repair work quota)
|
|
SY/T 6237-2010
|
Labour quota for repair of downhole service equipment
|
|
SY/T 6238.1-1996
|
(OCTG full-scale test methods. Casing collapse trial)
|
|
SY/T 6238.2-2002
|
Procedures of full scale test for oil country tubular goods Makeup/breakout tests for casing and tubing connections
|
|
SY/T 6239-1996
|
Database file format of petroleum exploration
|
|
SY/T 6240-1996
|
Chemical analgsis method of barite
|
|
SY/T 6240-2008
|
Chemical analysis method of barite
|
|
SY/T 6240-2016
|
(Barite chemical analysis Recommended Practice)
|
|
SY/T 6241-1996
|
(Cluster wells wellsite layout principles and requirements)
|
|
SY/T 6242-1996
|
(Crude oil quality gum wax content by gas chromatography analysis)
|
|
SY/T 6243-1996
|
The engineering logging specification of hydrocarbon exploratory well
|
|
SY/T 6243-2009
|
Specifications for wellsite drilling monitoring of oil and gas exploration well
|
|
SY/T 6244-1996
|
Design regulations for well site of oil and gas exploratory well
|
|
SY/T 6245-1996
|
The regulation on building verifing section of seismic exploration proccessing software
|
|
SY/T 6246-1996
|
Vibrator service and maintenance
|
|
SY/T 6246-2003
|
Vibrator service and maintenance
|
|
SY/T 6246-2014
|
Vibrator service and maintenance.
|
|
SY/T 6247-1996
|
Technical specification of 3D seismic exploration for mountainous area
|
|
SY/T 6247-2003
|
Technical specification of 3D seismic exploration data acquisition for mountainous area
|
|
SY/T 6249-1996
|
Operation and maintenance for proton magnetometer
|
|
SY/T 6249-2005
|
Operation and maintenance for magnetometer
|
|
SY/T 6250-1996
|
Specification of density logging calibration devices
|
|
SY/T 6251-1996
|
Depth marker calibrating standard of petroleum well logging cable
|
|
SY/T 6252-1996
|
Specification of induction logging calibrating devive
|
|
SY/T 6252-2012
|
Technical specifications for induction logging tool calibration and calibration device
|
|
SY/T 6253-1996
|
Specific regulations for horizontal well perforation
|
|
SY/T 6253-2007
|
Specification of horizontal well perforation
|
|
SY/T 6253-2016
|
The technical specifications for horizontal well perforating operation
|
|
SY/T 6254-1996
|
Use and maintenance of side wall coring gun
|
|
SY/T 6254-2005
|
Use and maintenance of sidewall core gun
|
|
SY/T 6255-1996
|
Use and maintenance of sidewall core gun
|
|
SY/T 6256-1996
|
(Oil well cement slurry magnetizer)
|
|
SY/T 6257-1996
|
(Injection and production wells steam stimulation process design)
|
|
SY/T 6257-2010
|
Injection and production technology project design for steam huff and puff
|
|
SY/T 6258-1996
|
Practice for design calculations for sucker rod pumping systems (conventional units)
|
|
SY/T 6259-1996
|
(Gas Mining Technical Specification)
|
|
SY/T 6260-1996
|
Magnetic Processing Units for Production Well Stations
|
|
SY/T 6261-1996
|
(Injection well pressure drop data analysis method explained)
|
|
SY/T 6262-1996
|
(Process specification test gas wells)
|
|
SY/T 6263-1996
|
(Fenugreek gum fracturing fluid technical conditions)
|
|
SY/T 6264-1996
|
(Oil wells overhaul operations engineering preparation of specifications)
|
|
SY/T 6264-2006
|
Specifications of major repair project design for oil, gas, water well
|
|
SY/T 6265-1996
|
Diagnosis Method for Performance of Rod Pumped Wells
|
|
SY/T 6265-2016
|
(Diagnosis Method of Pumping Well Condition)
|
|
SY/T 6266-1996
|
(Low fiberglass pipeline)
|
|
SY/T 6266-2004
|
Low pressure fiberglass line pipe and fittings
|
|
SY/T 6267-1996
|
(High-pressure fiberglass line pipe)
|
|
SY/T 6267-2006
|
Specification for high pressure fiberglass line pipe
|
|
SY/T 6268-1996
|
(Oil casing with the recommended practice)
|
|
SY/T 6268-2008
|
Recommended practice for selection and use of casing and tubing
|
|
SY/T 6269-1996
|
Common terms on energy conservation management in petroleum enterprise
|
|
SY/T 6269-2004
|
Common terms of energy and water conservation in petroleum enterprises
|
|
SY/T 6269-2010
|
Common terms of energy and water conservation in petroleum enterprise
|
|
SY/T 6270-1997
|
(Use and maintenance of oil drilling pressure manifold parts)
|
|
SY/T 6270-2012
|
Operation, maintenance, repair and inspection of high pressure manifolds for drilling and production operation
|
|
SY/T 6271-1996
|
The primary connection sizes of major spare parts of electrical submersible pumps
|
|
SY/T 6272-1997
|
Supper-strength sucker rod
|
|
SY/T 6273-1997
|
Testing method of electric detonators for oil and gas well
|
|
SY/T 6273-2008
|
Testing method of electric detonators for oil and gas well
|
|
SY/T 6273-2016
|
(Detection Method of Electric Detonator for Oil and Gas Well)
|
|
SY/T 6274-1997
|
Testing method of detonating cord for oil and gas well
|
|
SY/T 6275-1997
|
Comprehensive evaluation method for monitering and testing of energy conservation in petroleum enterprise
|
|
SY/T 6275-2007
|
Monitoring and testing code for energy conservation of oilfield production system
|
|
SY/T 6276-1997
|
Petroleum and natural gas industries--Health, safety and environmental management systems
|
|
SY/T 6276-2010
|
Petroleum and natural gas industries. Health, safety and environmental management systems
|
|
SY/T 6276-2014
|
Petroleum and natural gas industries health, safety and environmental management systems
|
|
SY/T 6277-2005
|
Specification of hydrogen sulfide monitoring and protecting for operation personnel in oil and gas field involving hydrogen sulfide
|
|
SY/T 6280-1997
|
Health, safety and environmental management specification for seismic crew
|
|
SY/T 6280-2006
|
Health, safety and environment management specification for seismic crew
|
|
SY/T 6281-1997
|
Analytical approach of fluid physical property for heavy-oil reservoirs. Measurements of relaxation effects for crude oil
|
|
SY/T 6282-1997
|
Analytical approach of fluid physical property for heavy-oil reservoirs. Measurements of porous flow rheological characterization for crude oil
|
|
SY/T 6283-1997
|
Health, safety and environment management system guideline for oil and gas drilling
|
|
SY/T 6284-1997
|
Dividing and monitoring code of harmful workplaces in petroleum enterprise
|
|
SY/T 6284-2008
|
Monitoring and evaluating specification of occupational hazards work site in petroleum enterprise
|
|
SY/T 6284-2016
|
(Oil companies occupational hazards monitoring technical specifications)
|
|
SY/T 6285-1997
|
Evaluating methods of oil and gas reservoirs
|
|
SY/T 6285-2011
|
Evaluating methods of oil and gas reservoirs
|
|
SY/T 6286-1997
|
Detail description method for carbonate reservoir
|
|
SY/T 6287-1997
|
Determination method of oil well productivity index
|
|
SY/T 6288-1997
|
Practice for selection and use of drill pipe and drill collar
|
|
SY/T 6288-2007
|
Practice for selection and use of drill pipe and drill collar
|
|
SY/T 6289-1997
|
Technical specifications for continuous electromagnetic profiling method
|