|
Std ID |
Description (Standard Title) |
Detail |
|
SY/T 5838-1993
|
(Oil (gas) field (hidden) reserves of technical and economic evaluation requirements)
|
SY/T 5838-1993
|
|
SY/T 5838-2011
|
Guidline for evaluation of land proved petroleum initial reserves
|
SY/T 5838-2011
|
|
SY/T 5839-1993
|
(Expansive formation tester operating procedures)
|
SY/T 5839-1993
|
|
SY/T 5840-1993
|
(Drilling plugging material bridging laboratory test methods)
|
SY/T 5840-1993
|
|
SY/T 5840-2007
|
Recommended practice for laboratory testing of bridging materials for drilling fluids
|
SY/T 5840-2007
|
|
SY/T 5841-1993
|
(Drilling technical and economic indicators and calculation methods)
|
SY/T 5841-1993
|
|
SY/T 5841-2005
|
Drilling tech-economic indexes and calculation methods
|
SY/T 5841-2005
|
|
SY/T 5841-2011
|
Drilling tech-economic indexes and calculation methods
|
SY/T 5841-2011
|
|
SY/T 5842-1993
|
(Sandstone oilfield development programming technology requires the development of geological reservoir engineering section)
|
SY/T 5842-1993
|
|
SY/T 5842-2003
|
Technical requirements of compiling the development plan of sandstone oil field development geology and reservoir engineering
|
SY/T 5842-2003
|
|
SY/T 5843-1993
|
(Chinese Industry Standard)
|
SY/T 5843-1993
|
|
SY/T 5843-1997
|
Gas-water relative permeability measurement
|
SY/T 5843-1997
|
|
SY/T 5844.1-1995
|
(Petroleum Geology experimental information code. Geochemistry section)
|
SY/T 5844.1-1995
|
|
SY/T 5844.1-2012
|
The specification for names of data in the petroleum geology experiments. Part 1: Geochemistry
|
SY/T 5844.1-2012
|
|
SY/T 5844.2-1995
|
(Petroleum Geology experimental information sedimentary ore code section)
|
SY/T 5844.2-1995
|
|
SY/T 5844.2-2012
|
The specification for names of data in the petroleum geology experiments. Part 2: The sedimentary rock mineral
|
SY/T 5844.2-2012
|
|
SY/T 5846-1993
|
(Casing patch technology practice)
|
SY/T 5846-1993
|
|
SY/T 5846-2011
|
Recommended practice for casing patch process
|
SY/T 5846-2011
|
|
SY/T 5847-1993
|
(Pumping wells dynamic control chart preparation and method of use)
|
SY/T 5847-1993
|
|
SY/T 5847-2012
|
The drawing and application method of dynamic control chart for rod-pumping well
|
SY/T 5847-2012
|
|
SY/T 5848-1993
|
(Sucker off prevention device)
|
SY/T 5848-1993
|
|
SY/T 5848-2011
|
Resistance to screw collar
|
SY/T 5848-2011
|
|
SY/T 5849-1993
|
(Oil wells chemicals plugging Evaluation practice)
|
SY/T 5849-1993
|
|
SY/T 5849-2002
|
The method for economic effect evaluation of removing plugging by chemicals in production and injection well
|
SY/T 5849-2002
|
|
SY/T 5851-1993
|
(Sandstone oilfield water injection technology to be developed to adjust the programming technique)
|
SY/T 5851-1993
|
|
SY/T 5851-2005
|
Technical requirements for compilation of adjusting development design for oilfield
|
SY/T 5851-2005
|
|
SY/T 5851-2016
|
(Technical Requirements for Oilfield Development Adjustment Program)
|
SY/T 5851-2016
|
|
SY/T 5852-1993
|
(Offshore gas well completion test specification)
|
SY/T 5852-1993
|
|
SY/T 5854-2005
|
The safety regulation of moist steam generator specially used in oilfield
|
SY/T 5854-2005
|
|
SY/T 5857-2006
|
Management regulations of civil explosion equipments in the seismic operation of petroleum geophysical exploration
|
SY/T 5857-2006
|
|
SY/T 5858-2004
|
Safe operational regulations of hot work in petroleum industry
|
SY/T 5858-2004
|
|
SY/T 5859-1993
|
(Bridge plug seat seal tool)
|
SY/T 5859-1993
|
|
SY/T 5859-1995
|
(Bridge plug packer tool)
|
SY/T 5859-1995
|
|
SY/T 5860-1993
|
(Plastic ball pitching device)
|
SY/T 5860-1993
|
|
SY/T 5861-1993
|
(Fracturing wellhead protection)
|
SY/T 5861-1993
|
|
SY/T 5862-1993
|
(Flooding acrylamide polymer performance measurement)
|
SY/T 5862-1993
|
|
SY/T 5862-2008
|
Technical criterions of polymer for oil displacement
|
SY/T 5862-2008
|
|
SY/T 5863-1993
|
(Submersible pump from under the operating methods)
|
SY/T 5863-1993
|
|
SY/T 5863-2012
|
The procedure for the ESP pulling out and installation
|
SY/T 5863-2012
|
|
SY/T 5864-1993
|
(Pumping wells dynamometer test)
|
SY/T 5864-1993
|
|
SY/T 5864-2012
|
Dynamometer card test of the rod-pumping well
|
SY/T 5864-2012
|
|
SY/T 5865-1993
|
(Sandstone oilfield injection wells effect profile evaluation method)
|
SY/T 5865-1993
|
|
SY/T 5867-1993
|
(Oil and gas resource evaluation method Classification and Coding)
|
SY/T 5867-1993
|
|
SY/T 5867-2012
|
Coding for hte classified methodologies of petroleum resources assessment
|
SY/T 5867-2012
|
|
SY/T 5869-1993
|
(Flowing well downhole pressure test routine)
|
SY/T 5869-1993
|
|
SY/T 5870-1993
|
(Casing patch bellows)
|
SY/T 5870-1993
|
|
SY/T 5871-1993
|
(Throw hand drill packer)
|
SY/T 5871-1993
|
|
SY/T 5872-1993
|
(Pump maintenance procedures)
|
SY/T 5872-1993
|
|
SY/T 5872-2011
|
Inspection and repair regulations of sucker rod pumps
|
SY/T 5872-2011
|
|
SY/T 5873.1-1993
|
(There rod pumping operations craft practice. Conventional pumping)
|
SY/T 5873.1-1993
|
|
SY/T 5873.2-1994
|
(There rod pumping operations craft practice. Small pump deep drawing)
|
SY/T 5873.2-1994
|
|
SY/T 5873.3-1993
|
(There rod pumping operations craft practice. Deviated pumping)
|
SY/T 5873.3-1993
|
|
SY/T 5873.4-1993
|
(There rod pumping operations craft practice. Large pumping oil)
|
SY/T 5873.4-1993
|
|
SY/T 5873-2005
|
Recommended practice for design and execution of sucker rod pumping system
|
SY/T 5873-2005
|
|
SY/T 5874-1993
|
(Water-repellent effect evaluation method)
|
SY/T 5874-1993
|
|
SY/T 5874-2003
|
Evaluation method on oil well water plugging
|
SY/T 5874-2003
|
|
SY/T 5874-2012
|
Evaluation method on oil well water plugging
|
SY/T 5874-2012
|
|
SY/T 5875-1993
|
(Well level test methods)
|
SY/T 5875-1993
|
|
SY/T 5875-2011
|
Test method of oil well liquid level
|
SY/T 5875-2011
|
|
SY/T 5877-1993
|
(Density Instrument Maintenance Technical Specifications)
|
SY/T 5877-1993
|
|
SY/T 5877-2000
|
Technology procedure for compensated density logging tool maintenance
|
SY/T 5877-2000
|
|
SY/T 5878-1993
|
(Natural gamma logging tool maintenance technical specifications)
|
SY/T 5878-1993
|
|
SY/T 5879-1993
|
(Dual Induction - eight lateral logging instrument maintenance technical specifications)
|
SY/T 5879-1993
|
|
SY/T 5880.1-1997
|
Petroleum logging tool calibration - General rules
|
SY/T 5880.1-1997
|
|
SY/T 5880.2-1993
|
(Dual Induction - eight lateral calibration for logging procedures)
|
SY/T 5880.2-1993
|
|
SY/T 5880.3-1994
|
(Microspheres focus calibration for logging procedures)
|
SY/T 5880.3-1994
|
|
SY/T 5880.4-1995
|
Petroleum Logging Tool Calibration - Acoustic Velocity Logger
|
SY/T 5880.4-1995
|
|
SY/T 5881-1993
|
(Mechanical and electrical equipment exports oil industry contract specifications)
|
SY/T 5881-1993
|
|
SY/T 5882-1993
|
(Mechanical and electrical equipment imported oil industry contract specifications)
|
SY/T 5882-1993
|
|
SY/T 5883-1993
|
(Complete sets of mechanical and electrical equipment export oil industry contract specifications)
|
SY/T 5883-1993
|
|
SY/T 5884-1993
|
(Fracturing technical conditions)
|
SY/T 5884-1993
|
|
SY/T 5885-1993
|
(Acidified with concentrated hydrochloric acid inhibitor CT1-3)
|
SY/T 5885-1993
|
|
SY/T 5886-1993
|
(Slow acidic sandstone Evaluation Method)
|
SY/T 5886-1993
|
|
SY/T 5886-2012
|
Methods for evaluating performances of retarded acid
|
SY/T 5886-2012
|
|
SY/T 5888-1993
|
Evaluation Method for Flotation Agent Effect - Rotor Gettering
|
SY/T 5888-1993
|
|
SY/T 5888-2016
|
A flotation effect evaluation method of flotation agent. Turbine flotation
|
SY/T 5888-2016
|
|
SY/T 5889-1993
|
(Oxygen scavenger performance evaluation method)
|
SY/T 5889-1993
|
|
SY/T 5889-2010
|
Oxygen scavenger performance evaluation method
|
SY/T 5889-2010
|
|
SY/T 5890-1993
|
(Fungicide Performance Evaluation Method)
|
SY/T 5890-1993
|
|
SY/T 5891.1-1993
|
(Wells perforated shells (device) to detect the production of concrete target specifications)
|
SY/T 5891.1-1993
|
|
SY/T 5891.1-1999
|
Specification of making concrete targets for well perforators test
|
SY/T 5891.1-1999
|
|
SY/T 5891.2-1993
|
(Oil and gas wells to detect guns and Comprehensive Evaluation Method)
|
SY/T 5891.2-1993
|
|
SY/T 5892-1993
|
(Logging Perforating new technology into production regulations)
|
SY/T 5892-1993
|
|
SY/T 5893-1993
|
Specification of making concrete targets for well perforators test
|
SY/T 5893-1993
|
|
SY/T 5894-1993
|
(Oilfield special vehicle maintenance labor quota)
|
SY/T 5894-1993
|
|
SY/T 5895-1993
|
(Quantities and units used petroleum industry exploration and development section)
|
SY/T 5895-1993
|
|
SY/T 5896-1993
|
(Labor quota Gas Project)
|
SY/T 5896-1993
|
|
SY/T 5896-2002
|
Labor quota of gas production engineering
|
SY/T 5896-2002
|
|
SY/T 5896-2012
|
Labor quota of gas production engineering
|
SY/T 5896-2012
|
|
SY/T 5897-1993
|
(Labor quota Gas Transmission Project)
|
SY/T 5897-1993
|
|
SY/T 5897-2002
|
Labor quota of gas transmission engineering
|
SY/T 5897-2002
|
|
SY/T 5897-2012
|
Labor quota of gas transmission engineering
|
SY/T 5897-2012
|
|
SY/T 5898-1993
|
(Earthquake General technical data transmission cables)
|
SY/T 5898-1993
|
|
SY/T 5899-1993
|
(Hydraulic dynamometer technical conditions)
|
SY/T 5899-1993
|
|
SY/T 5900-1993
|
Technical Conditions of Bimetal Downhole Thermometers
|
SY/T 5900-1993
|
|
SY/T 5901-1993
|
(Petroleum Exploration and Development Instrument Category)
|
SY/T 5901-1993
|
|
SY/T 5901-2011
|
Classification for petroleum exploration and development instruments
|
SY/T 5901-2011
|
|
SY/T 5902-1993
|
Basic Environment Test Method of Instrument for Petroleum Exploration and Development - Test I: Drop and Topple Test
|
SY/T 5902-1993
|
|
SY/T 5903-1993
|
(Rod string group and design methods)
|
SY/T 5903-1993
|
|
SY/T 5904-1993
|
(Well submersible pump selection pump design principles and selection method)
|
SY/T 5904-1993
|