|
Std ID |
Description (Standard Title) |
Detail |
|
NB/T 20005.41-2018
|
(Carbon steels and low-alloy steels for pressurized water reactor nuclear power plants - Part 41: Low-alloy steel tubes for safety-grade equipment)
|
NB/T 20005.41-2018
|
|
NB/T 20006.40-2018
|
(Alloy steels for pressurized water reactor nuclear power plants - Part 40: Forgings for integrated top assemblies)
|
NB/T 20006.40-2018
|
|
NB/T 20006.41-2018
|
(Alloyed steels for pressurized water reactor nuclear power plants - Part 41: Steel rods for reactor pressure vessel bolts, nuts and washers)
|
NB/T 20006.41-2018
|
|
NB/T 20006.42-2018
|
(Alloyed steels for pressurized water reactor nuclear power plants Part 42: Alloy steel forgings for safety grade equipment)
|
NB/T 20006.42-2018
|
|
NB/T 20006.43-2018
|
(Alloy steels for pressurized water reactor nuclear power plants - Part 43: Alloy steel plates for safety-related equipment)
|
NB/T 20006.43-2018
|
|
NB/T 20007.49-2018
|
(Stainless steel for pressurized water reactor nuclear power plants - Part 49: Cold work hardening stainless steel rods for safety class equipment)
|
NB/T 20007.49-2018
|
|
NB/T 20037.9-2018
|
(First-order probabilistic safety assessment for nuclear power plants Part 9: Other external disasters with power operation)
|
NB/T 20037.9-2018
|
|
NB/T 20325.4-2018
|
(Technical Specifications for Prestressing of Pressurized Water Reactor Nuclear Power Plant Part 4: Monitoring)
|
NB/T 20325.4-2018
|
|
NB/T 20355-2018
|
(Nuclear Power Plant Construction Project Nuclear Island Construction and Installation Cost Quota)
|
NB/T 20355-2018
|
|
NB/T 20357-2018
|
Machinery cost quota for nuclear power plant construction project
|
NB/T 20357-2018
|
|
NB/T 20358.10-2018
|
(Budget quotas for nuclear power plant construction projects Part 10: Nuclear island anti-corrosion and thermal insulation projects)
|
NB/T 20358.10-2018
|
|
NB/T 20358.1-2018
|
(Budget quotas for nuclear power plant construction projects Part 1: Nuclear island construction project)
|
NB/T 20358.1-2018
|
|
NB/T 20358.2-2018
|
(Budget quota for nuclear power plant construction project Part 2: Nuclear island decoration project)
|
NB/T 20358.2-2018
|
|
NB/T 20358.3-2018
|
(Budget quota for nuclear power plant construction project Part 3: Nuclear island steel structure project)
|
NB/T 20358.3-2018
|
|
NB/T 20358.4-2018
|
(Budget quotas for nuclear power plant construction projects Part 4: Installation of nuclear island process equipment)
|
NB/T 20358.4-2018
|
|
NB/T 20358.5-2018
|
Cost estimation of nuclear power plant construction project -- Part 5: Installation engineering for nuclear island
|
NB/T 20358.5-2018
|
|
NB/T 20358.6-2018
|
(Budget quota for construction of nuclear power plants Part 6: Installation of nuclear island ventilation and air conditioning)
|
NB/T 20358.6-2018
|
|
NB/T 20358.7-2018
|
(Budget quotas for nuclear power plant construction projects Part 7: Installation of nuclear island electrical equipment)
|
NB/T 20358.7-2018
|
|
NB/T 20358.8-2018
|
(Budget quotas for nuclear power plant construction projects Part 8: Nuclear island automation control instrument installation project)
|
NB/T 20358.8-2018
|
|
NB/T 20358.9-2018
|
(Budget quotas for nuclear power plant construction projects Part 9: Installation of nuclear island communications equipment)
|
NB/T 20358.9-2018
|
|
NB/T 20476.5-2018
|
(Continuation of Nuclear Power Plant Operation Permits Part 5: Environmental Impact Assessment)
|
NB/T 20476.5-2018
|
|
NB/T 20477.1-2018
|
(Burst valves for nuclear power plants Part 1: Valve design)
|
NB/T 20477.1-2018
|
|
NB/T 20477.2-2018
|
(Burst valves for nuclear power plants Part 2: Valve qualification)
|
NB/T 20477.2-2018
|
|
NB/T 20477.3-2018
|
(Bursting valves for nuclear power plants Part 3: Design of drive units)
|
NB/T 20477.3-2018
|
|
NB/T 20477.4-2018
|
(Burst valves for nuclear power plants Part 4: Identification of drive devices)
|
NB/T 20477.4-2018
|
|
NB/T 20478.1-2018
|
(Pressure Vessel Nuclear Power Plant Reactor Pressure Vessel Sealing Ring Technical Specifications Part 1: O-Ring Sealing Rings)
|
NB/T 20478.1-2018
|
|
NB/T 20478.2-2018
|
(Pressure Vessel Nuclear Power Plant Reactor Pressure Vessel Sealing Ring Technical Specifications Part 2: Type C Sealing Ring)
|
NB/T 20478.2-2018
|
|
NB/T 20479.1-2018
|
(Non-destructive testing of welds in structural modules and mechanical modules of nuclear power plants. Part 1: Ultrasonic testing)
|
NB/T 20479.1-2018
|
|
NB/T 20479.2-2018
|
(Non-destructive Testing of Welds in Nuclear Power Plant Structural Modules and Mechanical Modules Part 2: Ray Inspection)
|
NB/T 20479.2-2018
|
|
NB/T 20479.3-2018
|
(Non-destructive testing of welds in structural modules and mechanical modules of nuclear power plants. Part 3: Penetrant testing)
|
NB/T 20479.3-2018
|
|
NB/T 20479.4-2018
|
(Non-destructive testing of welds in structural modules and mechanical modules of nuclear power plants. Part 4: Magnetic particle testing)
|
NB/T 20479.4-2018
|
|
NB/T 20479.5-2018
|
(Non-destructive testing of welds in structural modules and mechanical modules of nuclear power plants. Part 5: Visual inspection)
|
NB/T 20479.5-2018
|
|
NB/T 20480-2018
|
(Nuclear Power Circuit Washing Technical Requirements for PWR Nuclear Power Plant)
|
NB/T 20480-2018
|
|
NB/T 20481-2018
|
(Design Specification for Reactor Coolant Main Pipeline of PWR Nuclear Power Plant)
|
NB/T 20481-2018
|
|
NB/T 20482-2018
|
(Specification for Steel Containment Design and Construction of PWR Nuclear Power Plant)
|
NB/T 20482-2018
|
|
NB/T 20483-2018
|
(Nuclear power plant engineering geophysical prospecting specifications)
|
NB/T 20483-2018
|
|
NB/T 20484-2018
|
(Thermal Balance Test of Nuclear Steam Supply System in PWR Nuclear Power Plant)
|
NB/T 20484-2018
|
|
NB/T 20486-2018
|
(General technical conditions for water filter cartridges in nuclear power plants)
|
NB/T 20486-2018
|
|
NB/T 20487-2018
|
(Nuclear Power Plant Internal Fire Probability Safety Evaluation and Development Method)
|
NB/T 20487-2018
|
|
NB/T 20488-2018
|
(Performance-based seismic design method for nuclear facility structures)
|
NB/T 20488-2018
|
|
NB/T 20489-2018
|
(Nuclear power plant event root cause analysis method)
|
NB/T 20489-2018
|
|
NB/T 20490-2018
|
(Demand source monitoring requirements for activated corrosion products during shutdown inspection of pressurized water reactors)
|
NB/T 20490-2018
|
|
NB/T 20491-2018
|
(Pressurized water reactor nuclear power plant auxiliary pipe and equipment insulation)
|
NB/T 20491-2018
|
|
NB/T 20492-2018
|
(Welding material storage, drying and use management for nuclear power)
|
NB/T 20492-2018
|
|
NB/T 20493-2018
|
(Nuclear power plant safety important thermocouple thermometer identification)
|
NB/T 20493-2018
|
|
NB/T 20494-2018
|
(Nuclear Power Plant Deformation Monitoring Technical Regulations)
|
NB/T 20494-2018
|
|
NB/T 20495-2018
|
(Nuclear Power Plant Architectural Design Procedures)
|
NB/T 20495-2018
|
|
NB/T 20496-2018
|
(Nuclear power plant on-site large-scale crane transportation machinery management regulations)
|
NB/T 20496-2018
|
|
NB/T 20497-2018
|
(Technical Regulations for Rainwater Drainage in Nuclear Power Plants)
|
NB/T 20497-2018
|
|
NB/T 20498-2018
|
(Nuclear power project on-site large-scale production facility management regulations)
|
NB/T 20498-2018
|
|
NB/T 20499-2018
|
(Technical Specifications for Design of Window Type Bleaching Devices in Nuclear Power Plants)
|
NB/T 20499-2018
|
|
NB/T 20500-2018
|
(PWR nuclear power plant insulation installation and acceptance technical regulations)
|
NB/T 20500-2018
|
|
NB/T 20501-2018
|
(Nuclear power plant structural module manufacturing and acceptance technical regulations)
|
NB/T 20501-2018
|
|
NB/T 20502-2018
|
(Technical regulations for the installation and acceptance of personnel gates and equipment gates in PWR nuclear power plants)
|
NB/T 20502-2018
|
|
NB/T 20503-2018
|
(Technical Regulations for Surveying Concrete Aggregates Used in Nuclear Power Plants)
|
NB/T 20503-2018
|
|
NB/T 20504-2018
|
(Nuclear power plant nuclear island engineering microgrid measurement technical specification)
|
NB/T 20504-2018
|
|
NB/T 20505-2018
|
(Nuclear power plant prestressed concrete containment structure in-service inspection requirements)
|
NB/T 20505-2018
|
|
NB/T 20506-2018
|
(Nuclear power plant nuclear island mechanical equipment threaded bushing technical requirements)
|
NB/T 20506-2018
|
|
NB/T 20507-2018
|
(PWR start-up water supply system design criteria)
|
NB/T 20507-2018
|
|
NB/T 20508-2018
|
(Steam Generator Heat Transfer Tube Expander Profile Eddy Current Testing)
|
NB/T 20508-2018
|
|
NB/T 20509-2018
|
(Pressure Disturbance Test for PWR Nuclear Power Plant)
|
NB/T 20509-2018
|
|
NB/T 20510-2018
|
(Pressurized Water Reactor Nuclear Power Plant Management Data Element)
|
NB/T 20510-2018
|
|
NB/T 20511-2018
|
(Nuclear Power Technology Maturity Evaluation Specification)
|
NB/T 20511-2018
|
|
NB/T 25078-2018
|
(Guidelines for selection of conventional island metal materials for pressurized water reactor nuclear power plants)
|
NB/T 25078-2018
|
|
NB/T 25079-2018
|
(Code of Acceptance of Corrosion Protection Engineering for Conventional Island Equipment and Pipelines in Nuclear Power Plants)
|
NB/T 25079-2018
|
|
NB/T 25080-2018
|
(Nuclear power plant water pump periodic test specification)
|
NB/T 25080-2018
|
|
NB/T 25081-2018
|
(Nuclear power system pipe system vibration test and evaluation)
|
NB/T 25081-2018
|
|
NB/T 25082-2018
|
(Nuclear power plant equipment components supersonic flame spray repair technical specifications)
|
NB/T 25082-2018
|
|
NB/T 25083-2018
|
Technical guidelines for vibration isolated foundation test of turbo-generator set in nuclear power plant
|
NB/T 25083-2018
|
|
NB/T 31129-2018
|
Guide for evaluation of vibration condition for wind turbines
|
NB/T 31129-2018
|
|
NB/T 31130-2018
|
Technical supervision code of equipment lubrication for wind farm
|
NB/T 31130-2018
|
|
NB/T 31131-2018
|
Technical supervision code of measurement for wind farm
|
NB/T 31131-2018
|
|
NB/T 31132-2018
|
Technical supervision code of power quality characteristics for wind power plant
|
NB/T 31132-2018
|
|
NB/T 31133-2018
|
Technical specification of anti-corrosion of offshore wind turbine concrete foundation
|
NB/T 31133-2018
|
|
NB/T 31134-2018
|
Environmental durability assessment of key components of offshore wind power generation equipment: Power generator
|
NB/T 31134-2018
|
|
NB/T 31135-2018
|
Environmental durability assessment of key components of offshore wind power generation equipment: Converter
|
NB/T 31135-2018
|
|
NB/T 31136-2018
|
Env iron mental durability assessment of key components of offshore wind power generation equipment: Converter
|
NB/T 31136-2018
|
|
NB/T 31137-2018
|
Environmental durability assessment of key components of offshore wind power generation equipment:Structural components
|
NB/T 31137-2018
|
|
NB/T 31138-2018
|
Specifications for structural anticorrosion for plateau wind turbine electrical control equipments
|
NB/T 31138-2018
|
|
NB/T 31139-2018
|
Technical requirements of liquid cooling thermal design for the plateau wind turbine full-power converter
|
NB/T 31139-2018
|
|
NB/T 31140-2018
|
Technical specification of main control system for plateau wind turbine
|
NB/T 31140-2018
|
|
NB/T 31141-2018
|
(Direct-drive Wind Turbine Technical Specification for Type Test of Yaw and Pitch Bearings)
|
NB/T 31141-2018
|
|
NB/T 31142-2018
|
Direct-drive wind turbine-Technical specification for on-hook test of main shaft bearing
|
NB/T 31142-2018
|
|
NB/T 31143-2018
|
Direct-drive wind turbine-Technical specification for type test of main shaft bearing
|
NB/T 31143-2018
|
|
NB/T 31144-2018
|
Wind turbines-brake piece for hydraulic disc brake
|
NB/T 31144-2018
|
|
NB/T 32004-2018
|
Technical specification of PV grid-connected inverter
|
NB/T 32004-2018
|
|
NB/T 32041-2018
|
Code for post-evaluation of equipment in photovoltaic power station
|
NB/T 32041-2018
|
|
NB/T 32042-2018
|
Code of engineering supervision for photovoltaic power project
|
NB/T 32042-2018
|
|
NB/T 33001-2018
|
Specification for electric vehicle off-board conductive charger
|
NB/T 33001-2018
|
|
NB/T 33028-2018
|
Terminology of electric vehicle charging and discharging infrustructure
|
NB/T 33028-2018
|
|
NB/T 33029-2018
|
Technical guide for synergistic dispatch of electric vehicles charging with intermittent power integrated
|
NB/T 33029-2018
|
|
NB/T 34061-2018
|
Technical Specification for Storage and Transportation of Densified Biofuel for Heating Boiler
|
NB/T 34061-2018
|
|
NB/T 34062-2018
|
Code for Design of Densified Biofuel Projects for Heating Boilers
|
NB/T 34062-2018
|
|
NB/T 34063-2018
|
Terminology of Densified Biofuel for Heating Boiler
|
NB/T 34063-2018
|
|
NB/T 34064-2018
|
Specification for Operation Management of Densified Biofuel Projects for Heating Boilers
|
NB/T 34064-2018
|
|
NB/T 34065-2018
|
General Rule for Test Methods of Densified Biofuel for Heating Boiler
|
NB/T 34065-2018
|
|
NB/T 35108-2018
|
Code for Design of Gas-insulated. Metal-enclosed Switchgear Installations
|
NB/T 35108-2018
|
|
NB/T 35109-2018
|
Specification for 3D Laser Scanning Measurement of Hydropower Projects
|
NB/T 35109-2018
|
|
NB/T 35110-2018
|
Code for Design of Underground Steel Bifurcated Pipe with Crescent Rib of Hydropower Stations
|
NB/T 35110-2018
|
|
NB/T 35111-2018
|
Design Code for Spoil Areas of Hydropower Projects
|
NB/T 35111-2018
|