HOME   Cart(7)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)
Industry Standard: HG, HG/T, HGT
         
HG << ...>> HG
Std ID Description (Standard Title) Detail
HG/T 21538-1992 Legends of Technological Design Flow Chart of Chemical Mechanized Transportation HG/T 21538-1992
HG/T 21539-1992 Universal Drawing of Isolated Reinforced Concrete Pipe Rack HG/T 21539-1992
HG/T 21540-1992 Universal Drawing of Reinforced Concrete Pipe Rack with Longitudinal Beam HG/T 21540-1992
HG/T 21541-1992 General drawing of standard joints for welding H shaped steel HG/T 21541-1992
HG/T 2154-1991 (Industrial sulfur ammonia, ammonium) HG/T 2154-1991
HG/T 2154-2004 Ammonium thiocyanate for industrial use HG/T 2154-2004
HG/T 2154-2012 Ammonium thiocyanate for industrial use HG/T 2154-2012
HG/T 21542-1992 General drawing of single track, suspended crane beam HG/T 21542-1992
HG/T 21543-1992 (Round tower platform generic map) HG/T 21543-1992
HG/T 21543-2009 Circular tower platform universal Figure HG/T 21543-2009
HG/T 21544-2006 General drawing of embedded parts HG/T 21544-2006
HG/T 21545-1992 (Universal bolt Figure) HG/T 21545-1992
HG/T 21545-2006 General drawing of foundation bolt (anchor bolt) HG/T 21545-2006
HG/T 21546.1-1993 (Rotary cylinder with a roller, gear wheel types and technical conditions) HG/T 21546.1-1993
HG/T 21546.2-1993 (Rotary cylinder with supporting wheel) HG/T 21546.2-1993
HG/T 21546.3-1993 (Rotary cylinder with gear wheel) HG/T 21546.3-1993
HG/T 21546.4-1993 (Rotary cylinder out of the tank sealing device type and technical conditions) HG/T 21546.4-1993
HG/T 21546.5-1993 (Rotary cylinder out of the tank sealing device (MG type) and technical conditions) HG/T 21546.5-1993
HG/T 21546.6-1993 (Rotary cylinder out of the tank sealing device (JC-type) and technical conditions) HG/T 21546.6-1993
HG/T 21547-1993 Steel Paddle blank, Paddle spacer, Figure 8 blank for pipe HG/T 21547-1993
HG/T 21547-2016 Steel Paddle blank, Paddle spacer, Figure 8 blank for pipe HG/T 21547-2016
HG/T 21548-1993 Standard series of suction dredges in radial secondary settling ponds HG/T 21548-1993
HG/T 21549.1-1995 (Steel low pressure wet gas cabinets classification and technical conditions) HG/T 21549.1-1995
HG/T 21549.2-1995 (Steel low pressure wet without external guides helicopter gas tank standards) HG/T 21549.2-1995
HG/T 21549.3-1995 (Low wet steel outer guides helicopter gas tank standards) HG/T 21549.3-1995
HG/T 21549.4-1995 (Wet spiral steel low pressure gas tank standards) HG/T 21549.4-1995
HG/T 21549.5-1995 (Chemical plant piping design technology requirements) HG/T 21549.5-1995
HG/T 21549-1995 Low Pressure Steel Wet Gas Cabinet Series HG/T 21549-1995
HG/T 21550-1993 Frost-resistant Liquid Level Gauge HG/T 21550-1993
HG/T 21551.1-1995 (Manual cast iron discharge valve plunger) HG/T 21551.1-1995
HG/T 21502.2-1992 (Floating Roof Tanks series of vertical cylindrical inner steel) HG/T 21502.2-1992
HG/T 2150-2009 Measuring method of rubber calenders and plastics calenders HG/T 2150-2009
HG/T 21504.1-1992 Standard Series of FRP Storage Tank (VN0.5m3~VN100m3) HG/T 21504.1-1992
HG/T 21504.2-1992 Standard Series of Split Mounting Type FRP Storage Tank (VN 100m3~VN500m3) HG/T 21504.2-1992
HG/T 21507-1992 Uniform Provisions for the Content Profundity of Electric Power Design and Construction Drawings in Chemical Companies (Figure) HG/T 21507-1992
HG/T 21508-1992 Standard Drawing of Wiring and Electrical Equipment Installation in Explosive Atmospheres (Figure) HG/T 21508-1992
HG/T 21509-1995 Universal Drawing of Cable Tunnel Laying in Chemical Companies (Figure) HG/T 21509-1995
HG/T 21510-1992 Specification on content and procedure of preliminary design file for rubber plant HG/T 21510-1992
HG/T 21510-2005 Specification on content and procedure of preliminary design file for rubber plant HG/T 21510-2005
HG/T 21511-1992 (Rubber factory construction design provides depth) HG/T 21511-1992
HG/T 21511-2011 Code for file content and procedure of detail design of rubber factory HG/T 21511-2011
HG/T 2151-1991 (Rubber parallel plate (William) Plastometer technical conditions) HG/T 2151-1991
HG/T 2151-2011 Technical specifications for rubber parallel-plate plastometers HG/T 2151-2011
HG/T 21512-1995 Beam type gas injection packing support plate HG/T 21512-1995
HG/T 21514-2005 The type technical conditions of steel manholes and hand holes HG/T 21514-2005
HG/T 21514-2014 Technical specification of steel manholes and handholes HG/T 21514-2014
HG/T 21515-2005 Atmospheric manhole HG/T 21515-2005
HG/T 21515-2014 Manholes for atmospheric use HG/T 21515-2014
HG/T 21516-2005 Rotary cover plate welded flange manhole HG/T 21516-2005
HG/T 21516-2014 Plate flange manholes with hinged cover HG/T 21516-2014
HG/T 21517-2005 Rotary cover with neck flat welding flange manhole HG/T 21517-2005
HG/T 21517-2014 Slip on flange manholes with hinged cover HG/T 21517-2014
HG/T 21518-2005 The slewing cover weld neck flange manhole HG/T 21518-2005
HG/T 21518-2014 Welding neck flange manholes with hinged cover HG/T 21518-2014
HG/T 21519-2005 Vertical hanging cover welded flange hole HG/T 21519-2005
HG/T 21519-2014 Plate flange manholes with davit to verticla cover HG/T 21519-2014
HG/T 21520-2005 The vertical hanging cover with neck flat welding flange manhole HG/T 21520-2005
HG/T 21520-2014 Slip on flange manholes with davit to vertical cover HG/T 21520-2014
HG/T 21521-2005 Vertical hanging cap weld neck flanges manhole HG/T 21521-2005
HG/T 21521-2014 Welding neck flange manholes with davit to vertical cover HG/T 21521-2014
HG/T 2152-1991 (DBP absorption of carbon black tester technical conditions) HG/T 2152-1991
HG/T 2152-2011 Technical specifications for DBP absorption number of carbon black absorptometers HG/T 2152-2011
HG/T 21522-2005 Level of the hanging cover plate welded flange manhole HG/T 21522-2005
HG/T 21522-2014 Plate flange manholes with davit to horizontal cover HG/T 21522-2014
HG/T 21523-2005 The level hanging cover with neck flat welding flange manhole HG/T 21523-2005
HG/T 21523-2014 Slip on flange manholes with davit to horizontal cover HG/T 21523-2014
HG/T 21524-2005 Horizontal ceiling cover weld neck flange manhole HG/T 21524-2005
HG/T 21524-2014 Welding neck flange manholes with davit to horizontal cover HG/T 21524-2014
HG/T 21525-2005 Atmospheric spin handle quick open manhole HG/T 21525-2005
HG/T 21525-2014 Quick open manholes for atmospheric use HG/T 21525-2014
HG/T 21526-2005 The oval rotary cover fast open manhole HG/T 21526-2005
HG/T 21526-2014 Elliptical quick open manholes with hinged cover HG/T 21526-2014
HG/T 21527-2005 Rotary arch cover quick open manhole HG/T 21527-2005
HG/T 21527-2014 Quick open manholes with hinged dome cover HG/T 21527-2014
HG/T 21528-2005 Atmospheric hand hole HG/T 21528-2005
HG/T 21528-2014 Handholes for atmospheric use HG/T 21528-2014
HG/T 21529-2005 Hand hole plate flat welding flange HG/T 21529-2005
HG/T 21529-2014 Plate flange handholes HG/T 21529-2014
HG/T 21530-2005 Neck flat welding flanges with hand holes HG/T 21530-2005
HG/T 21530-2014 Slip on flange handholes HG/T 21530-2014
HG/T 21531-2005 Weld neck flanges hand hole HG/T 21531-2005
HG/T 21531-2014 Welding neck flange handholes HG/T 21531-2014
HG/T 21532-2005 The slewing cover weld neck flanges hand hole HG/T 21532-2005
HG/T 21532-2014 Welding neck flange handholes with hinged cover HG/T 21532-2014
HG/T 21533-2005 The atmospheric fast open hand hole HG/T 21533-2005
HG/T 21533-2014 Quick open handholes for atmospheric use HG/T 21533-2014
HG/T 21534-2005 Rotary handle quick open hand hole HG/T 21534-2005
HG/T 21534-2014 Quick open handholes with rotating handle HG/T 21534-2014
HG/T 21535-2005 The rotary cover fast open hand hole HG/T 21535-2005
HG/T 21535-2014 Quick open handholes with hinged cover HG/T 21535-2014
HG/T 21536-1992 Unified Specification on Contents and Procedure of Detail Design DWN of Industrial Furnaces for Chemical Plants HG/T 21536-1992
HG/T 21536-2011 Unified specification on contents and procedure of working drawing for design of industrial furnace for chemical plants HG/T 21536-2011
HG/T 21537.1-1992 (Carbon steel stuffing box packing box (construction plans) (PNO. 6)) HG/T 21537.1-1992
HG/T 21537.2-1992 (Stainless steel stuffing box stuffing box (construction plans) (PNO. 6)) HG/T 21537.2-1992
HG/T 21537.3-1992 (Atmospheric carbon steel stuffing box stuffing box (construction plans) (PNO. 1)) HG/T 21537.3-1992
HG/T 21537.4-1992 (Stuffing box pressure stainless steel stuffing box (construction plans) (PNO. 1)) HG/T 21537.4-1992
HG/T 21537.5-1992 (Carbon Steel Pipe stuffing box stuffing box (construction plans) (PN <0. 6)) HG/T 21537.5-1992
HG/T 21537.6-1992 (Stainless steel pipe stuffing box stuffing box (construction plans) (PN <0. 6)) HG/T 21537.6-1992
HG/T 21537.7-1992 (Stirring gear. Carbon steel stuffing box) HG/T 21537.7-1992
HG/T 21537.8-1992 (Stirring gear stainless steel stuffing box) HG/T 21537.8-1992