Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 32506-2016 English PDF

US$299.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 32506-2016: Code of operation and maintenance for excitation system of pumped storage unit
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 32506-2016299 Add to Cart 3 days Code of operation and maintenance for excitation system of pumped storage unit Valid

Similar standards

NB 35047   GB 50788   SL 314   GB/T 45530   GB/T 22385   

Basic data

Standard ID: GB/T 32506-2016 (GB/T32506-2016)
Description (Translated English): Code of operation and maintenance for excitation system of pumped storage unit
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: P59
Classification of International Standard: 27.140
Word Count Estimation: 15,110
Date of Issue: 2016-02-24
Date of Implementation: 2016-09-01
Regulation (derived from): National Standard Announcement No
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 32506-2016: Code of operation and maintenance for excitation system of pumped storage unit

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Gode ​​of operation and maintenance for excitation system of pumped storage unit ICS 27.140 P59 National Standards of People's Republic of China Pumped storage generator excitation system operation maintenance procedures Issued on. 2016-02-24 2016-09-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

CONTENTS

Preface Ⅰ ... 1 Scope 1 ... 2 Normative references 1 ... 3 Terms and definitions ... Run 4 Excitation System Maintenance 2 ... Excitation System Maintenance 5 5 ... 6 Run Maintenance Technical Paper 6 ... Appendix A (normative) pumped-storage generator excitation system overhaul project and quality standards ... 8 Annex B (informative) pumped-storage generator excitation system overhaul work instructions ... 10

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard is proposed and managed by the China Electricity Council. This standard was drafted. State Grid Xinyuan Holdings Ltd., China Southern Power Grid peaking FM Power Generation Company, Baishan power plant. The main drafters of this standard. Ren Zhiwu, Tao, what a pure, and Li, Tsang shift, Guo Haifeng, Xin Feng, Kun, Chen Weiyong, Song Xianghui, Li Shaochun, Wang Yong, Li Jianguang, Chang Long, Fan Yulin, Wang Xiaodong, Fang Junmin, Chen Lingfeng, Bao Feng, Shao Ming Hang, Li Dehua, Zhang, the song Hillsborough. Pumped storage generator excitation system operation maintenance procedures

1 Scope

This standard specifies the operation of pumped storage unit excitation system, maintenance and repair of technical requirements. This standard applies to pumped storage generator excitation system.

2 Normative references

The following documents for the application of this document is essential. For cited documents with dates, only the dated edition applies to this document. For undated references, the latest edition (including any amendments) applies to this document. GB/T 7409.3 synchronous motor excitation system for large and medium synchronous generator excitation system technical requirements DL/T 279 generator excitation system scheduling management procedures DL/T 491 large and medium hydroelectric Self Excitation System and device operation and maintenance procedures DL/T 596 electric preventive test code for electrical equipment DL/T 1166 large generator excitation system field test guidelines

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 isolation For security reasons, the entire electrical device or other individual portions of each power supply is fully disconnected manner. 3.2 static frequency converter (SFC) start The use of static frequency conversion means gradually increases a current supplied to the stator units to generate a frequency synchronous rotation of the magnetic field, so that the pumping unit to start phasing way, when the unit and the pumping phase modulation frequency network operation after exiting the stationary apparatus conditions. 3.3 back to back start A unit to send the status of electrician start, gradually increase the output frequency of the stator current is supplied to another unit to generate a frequency synchronous rotation of the magnetic field, so that the pumping unit to start phasing way, when the pumping phase modulation unit and network operation exit conditions turbines. 3.4 launcher unit Pumped Storage Power Station synchronous generator motor start back to back, and as a generator to run the unit. 3.5 launched unit Pumped Storage Power Station synchronous generator motor start back to back, and for the operation of the motor units. 3.6 A class maintenance The disintegration of the equipment to conduct a comprehensive inspection and repair in order to maintain, restore or improve equipment performance.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32506-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32506-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32506-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32506-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.